Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC | ₹27.3 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹33.2 L+₹5.9 L (21.5%)Rejected-Finance SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | ₹33.2 L+₹5.9 L (21.5%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹47.1 L+₹19.8 L (72.7%)Rejected-Finance | ₹47.1 L+₹19.8 L (72.7%) | L3 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | APB INFFRASTRUCTURE PVT LTD L1 | Ganesh Enterprises L2 | T.H.ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Repair to pot holes any depth, not exceeding 1 Sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting arround edges to at least 25 mm in depth, making good by applying tack coat with bituminiou primer at 5 kg per 10 sqm, putting in pre-mixed bituminous macadam, well rammed and sealed with premixed sand seal coat (9.8kg of per 10 Sqm binder with 0.09cum of stone chipping, 6.3 mm size and, again well rammed (including supply of premix macadam, binder and chipping) depth of potholes exc 30 mm depth complete all as specified and as directed. | 3 | 10 Sqm | 250 ₹750 Lowest | 2,000 ₹6,000 | 3,860 ₹11,580 |
| 2.00 | Material and labour for preparing unsurfaced water bound mecadam by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags and mechanical compressor to remove all loose dirts etc and applying evenly a tack coat with bituminous primer at 10Kg per 10 Sqm with paving bitumen complete all as specified and directed by Engr-in-Charge. | 20 | 10 Sqm | 300 ₹6,000 Lowest | 450 ₹9,000 | 1,000 ₹20,000 |
| 3.00 | Material and labour for dense bituminous macadam not exceeding 50mm consolidated thickness using hot mix plant and mechanical paver with min 4% binder (paving bitumen VG-30 grade) content by weight of total mix, rolled and compacted with power rolled 8 to 10 tonnes to required cambar and gradient complete all as specified and directed by Engr-in-Charge. | 10 | Cum | 2,700 ₹27,000 Lowest | 8,500 ₹85,000 | 12,000 ₹1,20,000 |
| 4.00 | Material and labour for preparing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags and mechanical compressor to remove all loose dirts etc and applying evenly a tack coat with bituminous primer at 5Kg per 10 Sqm with paving bitumen complete all as specified and directed by Engr-in-Charge. | 748 | 10 Sqm | 150 ₹1,12,200 Lowest | 400 ₹2,99,200 | 500 ₹3,74,000 |
| 5.00 | M&L for laying bituminous SDAC (Semi Dense Asphaltic Concrete) a 40mm consolidated thickness with 5.5% binder content by weight of total mix, using VG 30 bitumen by mechanised paver) rolled and compacted to required camber and gradient with 8 to 10 ton power roller over and including preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc complete all as specified and as directed. | 748 | 10 Sqm | 3,455 ₹25,84,340 Lowest | 3,900 ₹29,17,200 | 5,600 ₹41,88,800 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
13 Jul 2026, 6:00 pmClosed
Shri Gaurav Tiwari, IDSE
GE (I) (NAVY), INS SHIVAJI - POST, LONAVLA -410402
REPAIRS TO ROADS AT CERTAIN MARRIED AREAS UNDER AGE B/R-1 OF INS SHIVAJI LONAVLA
2026_MES_770336_1
GE/LONAVLA/8449/E8
Open Tender
Civil Works - Roads
Item Rate
225 days
GE (I) (NAVY) LONAVLA
Scanned Copy of APPLICATION
Scanned Copy DEMAND DRAFT
Scanned Copy of EPF REGISTRATION
Scanned Copy ENLISTMENT LETTER
Scanned Copy of GST REGISTRATION
6 documents required · 6 mandatory
₹500
Yes
GE (I) (NAVY) LONAVLA
₹70,000
Yes
30 Aug 2026
8 Jun 2026
15 Jul 2026
8 Jun 2026
13 Jul 2026
24 Jun 2026
8 Jun 2026 - 22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to pot holes any depth, not exceeding 1 Sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting arround edges to at least 25 mm in depth, making good by applying tack coat with bituminiou primer at 5 kg per 10 sqm, putting in pre-mixed bituminous macadam, well rammed and sealed with premixed sand seal coat (9.8kg of per 10 Sqm binder with 0.09cum of stone chipping, 6.3 mm size and, again well rammed (including supply of premix macadam, binder and chipping) depth of potholes exc 30 mm depth complete all as specified and as directed. | 3 | 10 Sqm | - | - |
| 2 | Material and labour for preparing unsurfaced water bound mecadam by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags and mechanical compressor to remove all loose dirts etc and applying evenly a tack coat with bituminous primer at 10Kg per 10 Sqm with paving bitumen complete all as specified and directed by Engr-in-Charge. | 20 | 10 Sqm | 1 | ₹20 |
| 3 | Material and labour for dense bituminous macadam not exceeding 50mm consolidated thickness using hot mix plant and mechanical paver with min 4% binder (paving bitumen VG-30 grade) content by weight of total mix, rolled and compacted with power rolled 8 to 10 tonnes to required cambar and gradient complete all as specified and directed by Engr-in-Charge. | 10 | Cum | 2 | ₹20 |
| 4 | Material and labour for preparing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags and mechanical compressor to remove all loose dirts etc and applying evenly a tack coat with bituminous primer at 5Kg per 10 Sqm with paving bitumen complete all as specified and directed by Engr-in-Charge. | 748 | 10 Sqm | 3 | ₹2,244 |
| 5 | M&L for laying bituminous SDAC (Semi Dense Asphaltic Concrete) a 40mm consolidated thickness with 5.5% binder content by weight of total mix, using VG 30 bitumen by mechanised paver) rolled and compacted to required camber and gradient with 8 to 10 ton power roller over and including preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc complete all as specified and as directed. | - | 10 Sqm | 4 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tenderdocuments8449.pdf
Tender Documents • 1.00 MB
BOQ_862686.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .