Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹29.3 Cr
EMD Value
₹15 L
Closing Date
17 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER JAIPUR ZONE JAIPUR
HEAD QUARTER CHIEF ENGINEER JAIPUR ZONE JAIPUR
PROVISION OF SEWAGE DISPOSAL FOR CENTRAL LINE INCL SEWAGE TREATMENT PLANTS AT MATHURA MIL STN
2025_MES_739490_1
80933/C/E8
Open Tender
Miscellaneous Works
Lump-sum
4200 days
GE EAST MATHURA
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE EAST MATHURA
₹15 L
Yes
9 Feb 2026
12 Nov 2025
19 Dec 2025
12 Nov 2025
17 Dec 2025
10 Dec 2025
12 Nov 2025 - 22 Nov 2025
3 4 5 (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects 6 (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects 7 (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects 8 9
1 0 14692610.95 (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. 0 (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 900 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. 0 -100
1 0 208301.56 SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) SEWAGE TREATMENT SYSTEM (AT RATC LINE) 0 SEWAGE TREATMENT SYSTEM (AT RATC LINE) 0 -100
1 0 14530.24 Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month Per Month 0 Per Month 0 -100
1 0 2962421.33 (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. 0 (h) All installations to be kept neat and clean all the time and security checks to be carried out daily (j) In case of any damage misuse mishandling,theft of Govt property, contractor will be held responsible for the same (k) All saftey eqpts such as breathing apparatus, safety belt, air hose respiratory, portable lighting eqpt, driver suit etc for working hazardous condition to be provided by contractor (l) First Aid Box with basic medicines to be kept in main installation by the contractor (m) misuse of electricity and water to be penalised and effective recovery will be made by the department (n) Manning and operation shall start as per the stipulated date in work order (p) Installation shall be kept neat & clean all the time & security of assests shall be ensured (q) Proper disposal of material of residual dry waste/other waste material should be carried out by the contractor all as directed by Engr-in-charge. The cost of the same is deemed to be included in rates quoted by the contracotor (r) Wages to be paid to employee through individual bank account only duly AADHAR linked (i.e payment through cheque/NEFT/RTSG) and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. 0 -100
1 0 77271896.91 (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . 0 (s) Minimum I.T.I or any other Higher Qualification with Two years Experience certificate for Operator and Two years experince for helper employed shall be submitted. (t) The rate quoted shall be deemed to including the Providing Stationery for all above mentioned installations. (u) Group insurance, E.S.I, and EPF shall be provided by the contractor for his staff/tradesmen/operator and documentry proof of payment to trademens/Operators shall be submitted to the department for releasing of payment. (v) In case of absence operator, double the rate quoted to be recovered. (w) Manning of SCADA system including cost of upgradation system, cost of spare parts cost defect libility period operation including payments of bills by telecome service provided shall be included in rate quoted by the contractor. Cost of SCADA will be without manning costs. The cost of spares should be provided out of maintance fund as and when required, other than in defect liabity period . 0 -100
1 0 1968612.42 Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. 0 Note for Item No 26.00 to 27.00 : (a) Contractor will arrange biometric attendence machine at installation and payment will only be made on the basis of biometric attendence. (b) Reliever for weekly off shall be provided by the contractor at his own cost and rates for the same shall be deemed to included in the quoted rates. No extra payment shall be admissible on this account (c) All types of T&P required for day to day reqmt shall be provided by contractor (d) All types of transportation if reqd for handling materials/eqpt etc shall be provided by the contractor (e) All types of fire eqpts provided in all the installations shall be maintained and operated properly (f) All electrical fittings and fixtures to be maintained and contractor shall be responsible for any damage (g) All types of water tanks incl flusihing tanks shall be maintained. 0 -100
1 0 1300092.15 MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. 0 MANNING , OPERATION AND MAINTAINANCE DURING 2 YEARS OF DEFECT LIABILITY PERIOD Manning and operation of sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the maintenance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be mainained as per prescribe format approved by Engr-in-Charge and treated water distributed supply distribution system during supply Hrs with one operator skilled (FGM) for each STP (Total 05 Nos STP i.e .80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hours per shift) including sunday and holiday, complete all as specified and as directed by Engineer-in-Charge. 0 -100
1 0 849319.6 MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of 0 MANNING , OPERATION AND MAINTAINANCE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Manning and operation of 0 -100
1 0 5900378.37 sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. 0 sewage treatment plant installations including various electrical and mechanical equipment and attending minor fault of STP, maintenance of chlorine PPM, TDS testing of treated water all as specified and directed by Engr-in-Charge. The trades men will be in possession of required working/safety tools to operate the plant/DG set/ Control panel. The person shall be carried out the mainetnance of plant and keeping the installation neat and clean. All document related to the equipments such as log sheet, record of RSEB power supply are to be maintained as per prescribe format approved by Engr-in-Charge and of treated water distributed supply distribution system during supply Hrs with One operator skilled (FGM) for each STP (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) daily in three shifts per day (Morning, Evening and Night) (8 Hour per shift) including sunday and holiday, Complete all as specified and as directed by Engineer-in-Charge. 0 -100
1 0 113593.5 COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates 0 COMPREHENSIVE MAINTENANACE FOR 8 YEARS AFTER COMPLETION OF DEFECT LIABILITY PERIOD Comprehensive maintenance of sewage treatment plant installation (Total 05 Nos STP i.e. 80 KLD, 200 KLD, 250 KLD, 0.40 MLD, 0.90 MLD capacity) including various electrical and mechanical equipments and attending fault of STP in reliable safe and efficient operating conditioning by regularly examining, lubricating and adjusting the equipment and carryout planned maintanance (Monthly, quarterly, half yearly and yearly) in systematic and controlled manner using technique and expertise and replacement of all unserviceable components as specified and directed by Engr-in-Charge. The trademan will be in position of required working/ safety tools to maintained the plant/ DG set/ control panels. The person shall carying out the periodical maintenance of plant. Internal and external finishes shall be carried out every 2nd year and cleaning of treated water sump and drying beds to be done every year and cost for the same shall be deemed to included in the quoted rates 0 -100
1 0 2976157.7 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 0 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1.00 0 -100
1 0 22863165.43 Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0 Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0 -100
Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
3 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0
6 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0
1 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0
23 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 0
120 0 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 0 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 6.00 0
Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES
5 0 Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES 0 Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES 0
5 0 Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME 0 Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME 0
Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 10.00
5 0 Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l 0 Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the l 0
40 0 Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by 0 Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by 0
40 0 Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the Lump sum price worked out by the 0 Lump sum price worked out by the 0
40 0 contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri 0 contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum pri 0
5 0 Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh 0 Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items wh 0
20 0 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 SEWAGE DISPOSAL/NETWORK 15.00 0 SEWAGE DISPOSAL/NETWORK 15.00 0
1 0 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers 0 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers 0
1 0 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers 0 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers 0
3 0 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers 0 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers 0
M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 15.05
2 0 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 EXTERNAL WATER SUPPLY 16.00 0 EXTERNAL WATER SUPPLY 16.00 0
Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 16.01
Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for co
EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00
Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 17.01
Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc
3 0 Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp 0 Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamp 0
M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 3
M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red col
EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00 EXTERNAL ELECTRIFICATION 17.00
Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 17.06
Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC inc
Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individua
1 0 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 DG SETS 18.00 0 DG SETS 18.00 0
Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternato
(a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with el
33 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, 0
18 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, 0
3 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, 0
18 0 (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co 0 (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer co 0
(d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides.
4 0 Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch 0 Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly ch 0
4 0 Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d 0 Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating d 0
2 0 (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e 0 (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with e 0
750 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited 0 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited 0
3050 0 (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides 0 (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides 0
1770 0 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 0 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION 19.00 0
990 0 Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo 0 Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of follo 0
4 0 (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which 0 (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which 0
8 0 Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: Notes: 0 Notes: 0
10 0 Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw 0 Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and tw 0
12 0 Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, 0 Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, 0
15 0 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 UTILISATION OF TREATED WATER 20.00 0 UTILISATION OF TREATED WATER 20.00 0
15 0 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with 0 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with 0
34 0 Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME 0 Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the ME 0
10 0 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple 0 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP comple 0
315 0 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all 0 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all 0
Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to
1 0 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 0 Supply and laying of High density polyethylene pipes (HDPE) IS- 49 0
84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05
Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 20.06
Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 20.07
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 20.10
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11
Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12
Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13
Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15
Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16
SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00 SEWAGE TREATMENT SYSTEM (AT 3RPD) 21.00
1 0 Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem 0 Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem 0
(a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process r
(b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness
(c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09
(d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base fram
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11
Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12
Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13
Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15
Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16
(e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery he
1 0 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 0 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 21.07 0
84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05 84/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 20.05
(g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatme
(h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in it
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 20.09
(j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter v
Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 20.11
Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified. 20.12
Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 20.13
Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore 20.15
Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor. 20.16
(k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dos
1 0 (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu 0 (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressu 0
SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00
Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem
(a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process
(b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank
(c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a
(f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07
SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00
Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem
(b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T
(c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a
(f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 23.07
SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00
Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi
(i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co
(ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement.
(iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas
e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate
(iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all nec
1 0 (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui 0 (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals sui 0
SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00 SEWAGE TREATMENT SYSTEM (AT OD Complex) 22.00
Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem
(a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process
(b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank
(c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a
(f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot 22.07
SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00 SEWAGE TREATMENT SYSTEM (AT NHL Complex) 23.00
Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, tem
(b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank T
(c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty a
(vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame,
SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00 SEWAGE TREATMENT SYSTEM (AT SWARG Complex) 24.00
Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete wi
(i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and co
(ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement.
(iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas (iii) Supply, installation, testing & commissioning of oil & greas
e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate e removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Mate
24 0 (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE 0 (vii) Supply, installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE 0
96 0 (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal 0 (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shal 0
(ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for con
(x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery hea
(xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized
96 0 (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s 0 (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge s 0
Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures Total in Figures 0 Total in Figures 0
Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words Quoted Rate in Words
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: CHIEF ENGINNER JAIPUR ZONE
Name of Work: PROVISION OF SEWAGE TREATMENT PLANT AND UPGRADATION OF SEWAGE LINE AT ALWAR MIL STN
Formation: - GE ALWAR
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words Represent (%) Percentage having Above/ Below ( + or - denomination) the Lump sum pre price inserted by MES
1 Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 14692610.95 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 208301.56 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
3 Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III" representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 14530.24 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Lump sum price worked out by the contractor for "ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 2962421.33 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5 Lump sum price worked out by the contractor for "SEWAGE DISPOSAL/NETWORK " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 77271896.91 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
6 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 1968612.42 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
7 Lump sum price worked out by the contractor for "FENCING & STEEL GATE " as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 1300092.15 Excess(+) Full Conversion INR
8 Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES 1 LUMP SUM 849319.6 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
9 Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES 1 LUMP SUM 5900378.37 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
10 Lump sum price worked out by the contractor for " DG SETS " as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 113593.5 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
11 Lump sum price worked out by the contractor for " SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION " as listed in Schedule ‘A’ Part-XI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 4138881.4 Excess(+) Full Conversion INR
12 Lump sum price worked out by the contractor for "UTILISATION OF TREATED WATER " as listed in Schedule ‘A’ Part-XII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES 1 LUMP SUM 2976157.7 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
13 Lump sum price worked out by the contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-XIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 1 LUMP SUM 22863165.43 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
14 Sch 'A' Part-XIV MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under SCH A PART-XIV (SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK schedule).
15 SEWAGE DISPOSAL/NETWORK
15.01 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers and with plaster and water proofing as per zonal specification including epoxy paint inside, refilling of earth and disposal of surplus earth within 50 m lead, including all piping connections, valves, internal electrification, MS ladder, ventilation shaft, BB chambers with 5m of outer wall of tank complete including test for water tightness and hydraulic functioning. Top room as per zonal specifications included. Overall depth of sump 8.0 m IL of incoming sewer 4.0 m - 5.0 m Inner Dia of sump well 3.0 m 3 Per Job Excess(+) Full Conversion INR
15.02 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers and with plaster and water proofing as per zonal specification including epoxy paint inside, refilling of earth and disposal of surplus earth within 50 m lead, including all piping connections, valves, internal electrification, MS ladder, ventilation shaft, BB chambers with 5m of outer wall of tank complete including test for water tightness and hydraulic functioning. Top room as per zonal specifications included. Overall depth of sump 8.5 m IL of incoming sewer 5.0 m - 6.0 m Inner Dia of sump well 3.0 m 6 Per Job Excess(+) Full Conversion INR
15.03 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers and with plaster and water proofing as per zonal specification including epoxy paint inside, refilling of earth and disposal of surplus earth within 50 m lead, including all piping connections, valves, internal electrification, MS ladder, ventilation shaft, BB chambers with 5m of outer wall of tank complete including test for water tightness and hydraulic functioning. Top room as per zonal specifications included. Overall depth of sump 8.5 m IL of incoming sewer 4.0 m - 5.0 m Inner Dia of sump well 3.50 m 1 Per Job Excess(+) Full Conversion INR
15.04 Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers and with plaster and water proofing as per zonal specification including epoxy paint inside, refilling of earth and disposal of surplus earth within 50 m lead, including all piping connections, valves, internal electrification, MS ladder, ventilation shaft, BB chambers with 5m of outer wall of tank complete including test for water tightness and hydraulic functioning. Top room as per zonal specifications included. Overall depth of sump 9.0 m IL of incoming sewer upto 5.0 m Inner Dia of sump well 4 m 23 Per Job Excess(+) Full Conversion INR
15.05 M & L for MS sign board size of ( 300 x300 ) mm with warning letters including painting complete as directed 120 Each Excess(+) Full Conversion INR
16 EXTERNAL WATER SUPPLY
16.01 Cutting the existing CI/DI pipes in trenches 100/80 mm dia from making connection to proposed 50mm dia GI/CI/DI pipe including provision of CI Tee coller lead joints etc as required at site. 5 Each Job Excess(+) Full Conversion INR
16.02 Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for coping, 15mm thick rendering in CM 1:4 including provision of MS sheet cover 3.0mm thick with MS angle frame 25 x 25 x 3mm all round and at diagonals of size 40 x 40 x 6mm and also MS plate welded to MS angle as shown in drawing, embedded in concrete with suitable hinges and locking arrangements, including two coats of synthetic enamel paint over a coat of red oxide primer necessary excavation earth work etc, all as specified and as directed. 5 Each Excess(+) Full Conversion INR
17 EXTERNAL ELECTRIFICATION
17.01 Supply and fix lightning arrestor HT 11 KV 10 KA station class 5 Set of 3 Excess(+) Full Conversion INR
17.02 Cable route / path indicators made out of 40x40x4mm angle iron 1.2 mtr long and plate of size 100x150x6mm welded only on one side end havinng embossed on plate as cable HT including PCC 1:4:8 of size 30cmx30cmx 30cm duly embedded the angle iron in PCC including excavation / earth work complete all as specified and directed. 40 Each Excess(+) Full Conversion INR
17.03 Supply and fixing of sheet moulding compound junction box shock and rust proof, termite resistant, tamper proof , front openable type for single phase, two wire rating of size 250x200x105mm complete with one no. MCB SP 6 Amp including non metallic clamps and GI nut bolts and washers of suitable size and fixed on pole / wall complete. 40 Each Excess(+) Full Conversion INR
17.04 M&L for street light bracket made out of 40mm dia medium grade GI pipe of 1.2m length bent to required shape suitable for fixing street light / security light fitting on Steel tubular pole / RCC pole / building wall including two Nos clamps made out 30mm X 5mm flat with suitable nuts and bolts (clamp type - as per site requirement ) including two coats of aluminium paint over a coating of red oxide primer and Taking down of existing unserviceable rusted street light brackets with clamps, nuts and bolts etc . ,complete all as directed. 40 Each Excess(+) Full Conversion INR
17.05 M&L for angle iron frame/stand suitable for mounting fire buckets (06 Nos) and including (06 Nos) of buckets, fire hook with bamboo -01 No and fire beater with bamboo -02 No complete with GI sheet, including fire buckets, painted with two coats of red colour paint over a coat of red oxide primer complete showing "fire" in english and hindi word complete all as specified. 5 Each Job Excess(+) Full Conversion INR
17.06 Supply only multi purpose fire extinguisher, capacity 9Kg, dry powder stored pressure type complete following latests ISI norms. 20 Each Excess(+) Full Conversion INR
17.07 Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individual door, factory locking system with two side ventilation suitable for working on 415 volt AC supply including bus bar chamber and water proof duly supported on 40 x 40 x 6 mm angle iron frame,opening arrangement from front & rear both duly fitted with compression cable glands for entry & exit of cables having minimun clearance of 450 mm above ground level complete comprising of the following :- (a) Aluminium busbar of 400 Amp for three phase and 200Amp for neutral. (b) MCCB 4 Pole 415 volts 300 Amp.(adjustable type) 36 KA.-01 Nos (for incoming) (c) MCCB 4 Pole 415 volts, 250 Amp, 25 KA.--- 01 Nos. (for outgoing for STP ) (d) MCCB 4 Pole 415 volts, 63 Amp, 16 KA.--- 03 Nos. (for outgoing ) (e) MCCB 4 Pole 415 volts, 25 Amp, 16 KA.--- 03 Nos. (for outgoing ) (f) MCB SPN 220 volts, 32 Amp, 16 KA.--- 02 Nos.(for outgoing ) (g) Digital type volt meter (0-500V) with selector switch --- 01 Nos. (h) Digital type Ammeter (0- 600A ) with selector switch and CTs ---01 Nos. (j) Indicating lamp LED cluster type set of three in RED/BLUE/ GREEN colour - 01 Nos. 1 Each Excess(+) Full Conversion INR
17.08 Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factor 1 Each Excess(+) Full Conversion INR
17.09 y made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individual door, factory locking system with two side ventilation suitable for working on 415 volt AC supply including bus bar chamber and water proof duly supported on 40 x 40 x 6 mm angle iron frame,opening arrangement from front & rear both duly fitted with compression cable glands for entry & exit of cables having minimun clearance of 450 mm above ground level complete comprising of the following : - (a) Aluminium busbar of 400 Amp for three phase and 200Amp for neutral. (b) MCCB 4 Pole 415 volts 250 Amp.(adjustable type) 36 KA.-01 Nos (for incoming) (c) MCCB 4 Pole 415 volts, 200 Amp, 25 KA.--- 01 Nos. (for outgoing for STP) (d) MCCB 4 Pole 415 volts, 63 Amp, 16 KA.--- 02 Nos. (for outgoing ) (e) MCCB 4 Pole 415 volts, 25 Amp, 16 KA.--- 04 Nos. (for outgoing ) (f) MCB TPN Pole 415 volts, 32 Amp, 16 KA.--- 02 Nos. (for outgoing ) (g) Digital type volt meter (0-500V) with selector switch --- 01 Nos. (h) Digital type Ammeter (0- 600A ) with selector switch and CTs ---01 Nos. (j) Indicating lamp LED cluster type set of three in RED/BLUE/ GREEN colour - 01 Nos. 3 Each Excess(+) Full Conversion INR
18 Supply,installation,commissioning and testing of LT outdoor panel board Kiosk type (factory made of approved CPRI) made out of CRCA sheet 3.15mm thickness for outer sheet and 2mm thicness for inner sheet dust proof, powder coated from both side, individual door, factory locking system with two side ventilation suitable for working on 415 volt AC supply including bus bar chamber and water proof duly supported on 40 x 40 x 6 mm angle iron frame,opening arrangement from front & rear both duly fitted with compression cable glands for entry & exit of cables having minimun clearance of 450 mm above ground level complete comprising of the following : - (a) Aluminium busbar of 400 Amp for three phase and 200Amp for neutral. (b) MCCB 4 Pole 415 volts 200 Amp.(adjustable type) 36 KA.-01 Nos (for incoming) (c) MCCB 4 Pole 415 volts, 160 Amp, 25 KA.--- 01 Nos. (for outgoing STP ) (d) MCCB 4 Pole 415 volts, 63 Amp, 16 KA.--- 01 Nos. (for outgoing ) (e) MCCB 4 Pole 415 volts, 25 Amp, 16 KA.--- 05 Nos. (for outgoing ) (f) MCB TPN Pole 415 volts, 32 Amp, 16 KA.--- 02 Nos. (for outgoing ) (g) Digital type volt meter (0-500V) with selector switch --- 01 Nos. (h) Digital type Ammeter (0- 600A ) with selector switch and CTs ---01 Nos. (j) Indicating lamp LED cluster type set of three in RED/BLUE/ GREEN colour - 01 Nos.
18.01 DG SETS 2 Each Excess(+) Full Conversion INR
18.02 Supply, installation,test and commissioning Silent diesel driven engine generating set , 4 cylinder, Bore x stroke 105 x 125, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,100 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternator at 1500 RPM,water cooled turbo charged ,with common base plate frame flexible coupling ,electronic control panel for engine ,control panel having meter and sound proof canopy as per CPCB norms-IV(+), displaying battery voltage, coolant water temperature ,lubricating oil pressure engine speed and engine hours ,safety trip and indication for high water temperature, low lubricating oil pressure and over speed, alternator self excited, self regulated brushless excitation. Voltage regulation (+/-1%)of related voltage from no load to full load, including AMF Panel indoor type, acoustic enclosure, Fuel piping ,Exhaust piping ,control wiring cable from engine to control panel ,all as specified and as directed by Engineer-in-charge. The generator set shall be Skid mounting type base frame fabricated from suitable MS channel suitably machined to ensure perfect alignment of the engine & alternator with rigid construction & necessary reinforcement to ensure minimum vibrations. AVM Pads: Suitable number of AVM pads shall be supplied with Silent DG Set.
18.03 (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with electrical starting arrangement & shall give the electrical output of 100 KVA/80 KW at 0.8 power factor, 415 volts at the alternator terminal. (i) A1 class Governor (ii) Battery charging Alternator (iii) Fuel filter. (iv) Lube oil filter (v) Air cleaner (vi) Engine safety sensors (LLOP & HWT) (vii) Radiator Assembly, Radiator cooling fan ,water pump ,thermostat. (viii) RPM/Hour meter. (ix) Water Temp gauge, Oil pressure gauge, Oil temp gauge. (x) Fuel hoses. (xi) Protection Guard for safety of person from moving/rotating parts of generating set coupling
18.04 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 100 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, self regulated with insulation class H band of voltage regulation (+/- 1%) in static condition complete all as specified and as directed by Engineer-in-charge.
18.05 (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer control unit incorporating automatic engine start/stop and failure to start ,Off/Manual /Auto test ,selector indicators for Main on load on Generator ,Low tube pressure ,high water temperature ,set fails to start annunciation with alarm .Push button for engine start/stop, Power contactors of suitable rating, MCCB 2 Nos of rating 250 Amps Provn of manual operation mode change over switch 250 Amps 4 Pole with aluminum bus bar capacity 400 Amps continuous digital display of current in Amps ,Voltage frequency ,KW and KWH ,PF and suitable instrucment fuses ,control wiring complete, rate for which is deemed to have been included in the quoted rate of DG set. One battery charger in built for charging batteries float as well as normal changing ,selector switch and DC voltmeter shall be provided ,cost for which is deemed to have been included in the quoted rates.
18.06 (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. The Enclosure shall confirm to the latest Environment (Protection) Act 1986(29 to 1988) and latest amendments inside to the rules Noise limit shall be 75 DBS at 1 RM from the enclosure .The DG set acoustic enclosure shall be approved by CPCB by either one of their Nodal Agency's such as ARAI PUNE,NPL -NEW DELHI ,HAL " BANGALORE, FCRI-PALAKAD AND NSTE-VISHAKAPATNAM .The unit rate quoted is deemed to be inclusive of supply installation ,testing and commissioning of DG set with ACOUSTIC ENCLOSURE ,AMF Panel and all accessories as specified. (e) Fuel tank (Service Tank) Fuel tank shall be fabricated out of MS sheet of suitable for holding diesel for minimum 12 hours continuous running, complete with filling hole with threaded cap inlet out let ,drain and over flow connection arrangement ,air vent connection, fuel level indicator with scale to measure the qty of fuel in the tank etc.
18.07 Note:- (i) Diesel, Engine oil & grease ,coolant etc .required for commissioning and testing shall be supplied by contractor at his own cost. Initial supply of engine oil ,filling oil ,coolant MF Battery 12V 180 AH-01 No of make: Exide or Amaron duly charged etc. till taken over of DG set .Rate quoted is deemed to be included for the same. (ii) LT UG cable and control cable as required for connecting as directed . (iii) LT UG cable for alternator to panel board and changed over to AMF panel shall be included in the quoted rate relevant item. (iv) Any civil works such as PCC foundation for erection of DG set as per manufacturers recommendation and any other civil works involved in installation o 3 Each Excess(+) Full Conversion INR
18.08 f DG set ,cost for which has been deemed to have included in the quoted rates. (v) Tenderer shall be provide operator manual spares catalogue, cost for which is deemed to have included in the quoted rates . (vi) Periodic maintenance chart as per manufacturers recommendation shall be provided duly framed . Cost for which is deemed to have been included in the quoted rates. (vii) Tenders are directed to visit the site and familiarize themselves with the nature of work involved . Tender are deemed to have visited the site and acquainted themselves with the complex scope of work.
18.09 Supply, installation,test and commissioning Silent diesel driven engine generating set Engine Model : HA694TCIG1, 4 cylinder, Bore x stroke 96 x 112, 415 Volts ,3 Phase 4 wire, 50 Hz ,0.8PF,62.5 KVA speed variation of engine 1500 RPM, continuous rating directly coupled alternator at 1500 RPM,water cooled turbo charged ,with common base plate frame flexible coupling ,electronic control panel for engine ,control panel having meter and sound proof canopy as per CPCB norms-IV(+), displaying battery voltage, coolant water temperature ,lubricating oil pressure engine speed and engine hours ,safety trip and indication for high water temperature, low lubricating oil pressure and over speed, alternator self excited, self regulated brushless excitation. Voltage regulation (+/-1%)of related voltage from no load to full load, including AMF Panel indoor type, acoustic enclosure, Fuel piping ,Exhaust piping ,control wiring cable from engine to control panel ,all as specified and as directed by Engineer-in-charge. The generator set shall be Skid mounting type base frame fabricated from suitable MS channel suitably machined to ensure perfect alignment of the engine & alternator with rigid construction & necessary reinforcement to ensure minimum vibrations. AVM Pads: Suitable number of AVM pads shall be supplied with Silent DG Set.
18.1 (a) Diesel Engine: The Engine as per IS : 10001/10002, shall be vertical 4 cylinder (1500 PM. Radiator water cooled ,turbo charged /naturally not less than 90 BHP @ at 1500 RPM under NTP conditions of BS: 5514. The engine shall be provided with electrical starting arrangement & shall give the electrical output of 62.5 KVA/50 KW at 0.8 power factor, 415 volts at the alternator terminal. (i) A1 class Governor (ii) Battery charging Alternator (iii) Fuel filter. (iv) Lube oil filter (v) Air cleaner (vi) Engine safety sensors (LLOP & HWT) (vii) Radiator Assembly, Radiator cooling fan ,water pump ,thermostat. (viii) RPM/Hour meter. (ix) Water Temp gauge, Oil pressure gauge, Oil temp gauge. (x) Fuel hoses. (xi) Protection Guard for safety of person from moving/rotating parts of generating set coupling
18.11 (b) Alternator: The alternator as per IS : 13364 shall be designed for an output of 62.5 KVA at 1500 RPM, 415 volts, 0.8 PF suitable for 50 Hz, 3 phase, 4 wire system. The alternator is brushless type, screen protected, revolving field, self exited, self regulated with insulation class H band of voltage regulation (+/- 1%) in static condition complete all as specified and as directed by Engineer-in-charge.
18.12 (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 100 KVA DG set as per specification ,approachable through doors,openable on four sides. The Enclosure shall confirm to the latest Environment (Protection) Act 1986(29 to 1988) and latest amendments inside to the rules Noise limit shall be 75 DBS at 1 RM from the enclosure .The DG set acoustic enclosure shall be approved by CPCB by either one of their Nodal Agency's such as ARAI PUNE,NPL -NEW DELHI ,HAL " BANGALORE, FCRI-PALAKAD AND NSTE-VISHAKAPATNAM .The unit rate quoted is deemed to be inclusive of supply installation ,testing and commissioning of DG set with ACOUSTIC ENCLOSURE ,AMF Panel and all accessories as specified. (e) Fuel tank (Service Tank) Fuel tank shall be fabricated out of MS sheet of suitable for holding diesel for minimum 12 hours continuous running, complete with filling hole with threaded cap inlet out let ,drain and over flow connection arrangement ,air vent connection, fuel level indicator with scale to measure the qty of fuel in the tank etc.
19 (i) AMF Panel :- The AMF panel shall be in door type with 14/16 gauge CRCA sheet and is powder coated for weather proof and long lasting finish and comprises of main supply failure ,monitor, voltage sensors ,supply failure times, restoration timer control unit incorporating automatic engine start/stop and failure to start ,Off/Manual /Auto test ,selector indicators for Main on load on Generator ,Low tube pressure ,high water temperature ,set fails to start annunciation with alarm .Push button for engine start/stop, Power contactors of suitable rating, MCCB 2 Nos 160 Amps , Provn of manual operation mode change over switch 160 Amps 4 Pole with aluminum bus bar capacity 400 Amps continuous digital display of current in Amps ,Voltage frequency ,KW and KWH ,PF and suitable instrucment fuses ,control wiring complete, rate for which is deemed to have been included in the quoted rate of DG set. One battery charger in built for charging batteries float as well as normal changing ,selector switch and DC voltmeter shall be provided ,cost for which is deemed to have been included in the quoted rates.
19.01 (d) Accoustic Enclosure Pre-fabricated factory built ,free standing floor mounted out door type acoustic enclosure ,modular constructor suitable for accommodation 62.5 KVA DG set as per specification ,approachable through doors,openable on four sides. The Enclosure shall confirm to the latest Environment (Protection) Act 1986(29 to 1988) and latest amendments inside to the rules Noise limit shall be 75 DBS at 1 RM from the enclosure .The DG set acoustic enclosure shall be approved by CPCB by either one of their Nodal Agency's such as ARAI PUNE,NPL -NEW DELHI ,HAL " BANGALORE, FCRI-PALAKAD AND NSTE-VISHAKAPATNAM .The unit rate quoted is deemed to be inclusive of supply installation ,testing and commissioning of DG set with ACOUSTIC ENCLOSURE ,AMF Panel and all accessories as specified. (e) Fuel tank (Service Tank) Fuel tank shall be fabricated out of MS sheet of suitable for holding diesel for minimum 12 hours continuous running, complete with filling hole with threaded cap inlet out let ,drain and over flow connection arrangement ,air vent connection, fuel level indicator with scale to measure the qty of fuel in the tank etc. 1 Each Job Excess(+) Full Conversion INR
19.02 SCADA SYSTEM AND E/M WORKS OF INTERMEDIATE PUMPING STATION
19.03 Design, Develop, Integrate and Commission of SCADA System along with various analysing equipment for 900 KLD, 400 KLD, 250 KLD, 200 KLD and 80 KLD STP STP SCADA System as indicated and as per details attached. The STP SCADA system shall comprise of followings :- (a) Master Control station with suitable PC of latest configration LED monitor 55 inch and Windows 11 professional of latest configuration with intel core i7 , 12700 generation, 16 GB RAM DDR-4, 1 TB SSD, 4GB intrigated graphic Card, including complete accessories like mouse, key borad complete all as specified and as directed by Engineer-in- charge (b) UPS of Capacity of 2 KVA with Output voltage 230V AC+/-10% of frequency 50HZ +/-1% with min 90 minutes backup with full suitable battery condition. Off mode battery charging with high voltage protection battery warrenty of atleast 2 years. These Specifications are minimum and all in one PC with specifications higher than these shall be acceptable. UPS MODEL: V Guard model Splendor Plus-600 or equivalent in Luminous/Microtek PC Make:- HP,Dell,lenovo. (c) S & F laser jet printer with single function Colour with USB connection with printing speed of min 40 pages per minute with 512MB RAM complete all as specified and directed by Engr-in- Charge.(Make : HP, Canon, Epson, samsung) Note:- Bidder/OEM should maintain the stationery and cartridges for printer throughout the warranty period without any extra cost to the department.
19.04 (d) Server for more than 1 stp being monitored centrally. (e) Data Gateway. (f) SCADA software which can be operated, programmed, and modified by agencies other than the developer. (g) PLC/Microprocessor Controllers with indoor/outdoor applications for water sensing display, pump operation with/without RTU or microprocessor controller and transmitter. (h) Suitable communication system with modam and broad band connection, including payment of telecom service provider bills and internet payment . 33 Each Excess(+) Full Conversion INR
19.05 (j) Pressure transmitters. (k) Ultrasonic sensors. (m) Flow meters and switches. (n) Air release solenoid valves. (o) Online continous effluent monitorining system (OCEMS) 18 Each Excess(+) Full Conversion INR
19.06 Notes: (i) Design of communication system shall be done by the bidder. Cloud-based server/data storage/communication shall not be used and only local server-based systems shall be designed. (ii) The cost of each item shall be attached to arrive at pricing in in case of some additions/reductions at site. (iii) Operating system, software, and programming shall not be intellectual property of any agency. (iv) The memory in hard disk shall be suitable for six months’ data. The backup storage device/ devices shall be provided for archiving of data more than six month old up to 5 year. (v) In case of addition of installations, the system shall be capable of integrating the same. (vi) The responsibility of the agency is restricted to intimate mechanical and electrical failure such as pump, compressors etc. Such repairs shall be carried out by MES. (vii) Operation and maintenance charges to be paid separately. (viii) The SCADA system should have provision of both manual and automatic operation of installations. 3 Each Excess(+) Full Conversion INR
19.07 Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and two years maintenance of discharge capacity 30-125 Ltr/min at 10- 25 mtr head, minimum 1HP motor, 415 volts for IPS 18 Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and two years maintenance of discharge capacity 125- 270 Ltr/min at 10- 25 mtr head, minimum 2HP motor, 415 volts for IPS Excess(+) Full Conversion INR
20 Supply,installation,testing & commissioning non clog vertical submersible pumps with chrome steel impeller and cutter, non-clog to pass 40mm size particles including guide rail and lifting chain pully complete with all accessories, cables, earthing and two years maintenance of discharge capacity 270-400 Ltr/min at 10- 25 mtr head, minimum 3HP motor, 415 volts for IPS
20.01 Supply,Installation, commissioning and testing of LT outdoor panel board (factory made of approved CPRI) size as recommended by IS & CPRI norms & outdoor type made out of CRCA sheet 3.16 mm thick dust proof, powder coated from both side, individual door, factory locking system with two side ventilation suitable for working on 415 volt AC supply including bus bar chamber and copper bus bar of capacity 100 Amps rating for phase and neutral mounted on hygroscopic insulator fixed in a separate bus bar chamber separate compartment for incoming and outgoing feeder prewired with suitable size of copper conductor cable including fitted on 50x50x6mm angle iron channel with PCC foundation and provision of lugs and bushing for housing the following :- (i) Aluminium bus bar 100 amps for phase & neutral-04 Nos (ii) MCCB 4P 63 Amps, 16 KA- 01 Nos (In coming) (iii) MCB TPN 32 Amps, 10 KA - 01 Nos (O/G for IPS) (iv) MCB SPN 20 Amps -02 Nos (O/G for Duty room & SL ) (v) Multi functional digital Voltmeter and ampere meter including suitable and appropriate CTs-01 Set (vi) Indicator lamp (LED R-Y-B)- 01 Set (Vii) DOL starter push button type suitable for 1HP -3 HP 3 phase 415 VAC electric motor 4 Each Excess(+) Full Conversion INR
20.02 Each Job 4 Each Excess(+) Full Conversion INR
20.03 UTILISATION OF TREATED WATER 2 Each Excess(+) Full Conversion INR
20.04 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 600 LPM of capacity 5HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 80 KLD 200 KLD STP complete with all accessories :- (i) Delivery pipe 100mm dia MS pipe heavy grade from pump set to existing delivery pipe flanged type complete with all fitting suitable for flanged pipe and necessary nut, bolts, washers and rubber gasket etc including fixing of sluice valves and non return valve all as required. (ii) PCC platform in Cement Concrete 1:2:4 type B-1 using 20mm graded stone aggregate 30cm above ground level including necessary eye bolts etc as per manufacturer recommendation. (iii) Necessary cable connection of sutable size copper conductor laid from starter to motor terminals. 750 RM Excess(+) Full Conversion INR
20.05 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1200 LPM of capacity 10HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 250 KLD and 400 KLD STP complete with all accessories :- (i) Delivery pipe 100mm dia MS pipe heavy grade from pump set to existing delivery pipe flanged type complete with all fitting suitable for flanged pipe and necessary nut, bolts, washers and rubber gasket etc including fixing of sluice valves and non return valve all as required. (ii) PCC platform in Cement Concrete 1:2:4 type B-1 using 20mm graded stone aggregate 30cm above ground level including necessary eye bolts etc as per manufacturer recommendation. (iii) Necessary cable connection of sutable size copper conductor laid from starter to motor terminals. 3050 RM Excess(+) Full Conversion INR
20.06 Supply,installation,testing & commissioning centrifugal monoblock type pump with C I impeller, 12-26 meter head 1500 LPM of capacity 15HP motor, 415 volts, 1455 RPM and pipe size suction and delevery 100 x 100, IP 54 for 900 KLD STP complete with all accessories :- (i) Delivery pipe 100mm dia MS pipe heavy grade from pump set to existing 1770 RM Excess(+) Full Conversion INR
20.07 delivery pipe flanged type complete with all fitting suitable for flanged pipe and necessary nut, bolts, washers and rubber gasket etc including fixing of sluice valves and non return valve all as required. (ii) PCC platform in Cement Concrete 1:2:4 type B-1 using 20mm graded stone aggregate 30cm above ground level including necessary eye bolts etc as per manufacturer recommendation. (iii) Necessary cable connection of sutable size copper conductor laid from starter to motor terminals. 990 RM Excess(+) Full Conversion INR
20.08 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 200mm (8") dia laid in trenches complete all as specified. NOTES FOR ITEM 4.00 to 11.00 :- Excavation & earth work and MS flanges including nuts bolts & washers will be measured and paid for separately under respective items. 4 Each Excess(+) Full Conversion INR
20.09 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 160mm (6") dia laid in trenches complete all as specified. 8 Each Excess(+) Full Conversion INR
20.1 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 110mm (4") dia laid in trenches complete all as specified. 10 Each Excess(+) Full Conversion INR
20.11 Supply and laying of High density polyethylene pipes (HDPE) IS- 4984/95 pressure rating of pipe PN-10 and max permissible working pressure 1.00 Mpa or 10 Kgf/cm2 of size 90mm (3") dia laid in trenches complete all as specified. 12 Each Excess(+) Full Conversion INR
20.12 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 200mm complete all as specified. Note for item no. 12.00 to 19.00:- Rates for necessary fittng and fixtures, nuts, bolts, washers etc is deemed to be included in item quoted rates. 15 Each Excess(+) Full Conversion INR
20.13 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 150mm complete all as specified. 15 Each Excess(+) Full Conversion INR
20.14 Construction of valve chamber of internal size 750 x 750 x 750mm suitable for 80mm dia sluice valve including necessary earth work excavation PCC 1:4:8 in foundation type D2 using 40mm graded stone aggregate, brick wall in CM 1:4, PCC 1:2:4 type B1 for coping, 15mm thick rendering in CM 1:4 including provision of MS sheet cover 3.0mm thick with MS angle frame 25 x 25 x 3mm all round and at diagonals of size 40 x 40 x 6mm and also MS plate welded to MS angle as shown in drawing, embedded in concrete with suitable hinges and locking arrangements, including two coats of synthetic enamel paint over a coat of red oxide primer necessary excavation earth work etc, all as specified and as directed. 34 Each Excess(+) Full Conversion INR
20.15 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 100mm complete all as specified. 10 Each Excess(+) Full Conversion INR
20.16 Supply and fixing High density polyethylene (HDPE) Ball valve with flanged of size 80mm complete all as specified. 315 RM Excess(+) Full Conversion INR
21 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 80 mm bore tube (IS 14846) ISI marked complete all as specified.
21.01 Supply & fixing Air release valve double( isolated type) with flanged ends suitable for 50 mm bore tube ISI (IS 14846) marked complete all as specified. 1 Each Job Excess(+) Full Conversion INR
21.02 (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of bi
21.03 omass with sewage to anoxic chamber. Pumps shall include delivery header with pressure gauge on delivery line, isolation valves, and level controller (with wiring) to control sump level. (a)• Pumps to be suitable for continuous duty (S1), handling raw sewage/sludge with solids. (b) Motor: IP-55 or better, Class F insulation, copper wound. (c)Configuration: 1 Working + 1 Standby. (d) Vendor to submit pump curves, efficiency data, and test certificates from NABL/CPRI accredited lab.
21.04 (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatment unit. (a) Pumps shall be designed for required capacity and head suitable for 80 KLD STP tertiary treatment section. (b) Motor: IP-55 or better, Class F insulation, copper wound, continuous duty (S1). (c) Configuration: 2 Working + 1 Standby. (d) Level sensors/switches to be provided for ON–OFF operation based on filter tank level. (e) Flow meter with totalizer (electromagnetic, full-bore type) to be provided on main treated water header. (f) Vendor to submit pump Q–H curves, efficiency data, calibration/test certificates (from NABL/CPRI accredited lab).
21.05 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore
21.06 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor.
21.07 (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 80 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate.
21.08 SEWAGE TREATMENT SYSTEM (AT 3RPD)
21.09 (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dosing, 4–5 mg/ltr or as required). (b) Dosing pumps: Electronic metering type, suitable for continuous operation. (c) Solution tank of suitable capacity, corrosion-resistant PVC construction or equivalent. (d) System shall include suction/discharge piping, valves, calibration column, non-return valve, isolation valve, and necessary supports. (e) Vendor to provide performance curves, OEM datasheets, test certificates, and 2-year warranty for pumps.
21.1 Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 80 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, temperture differential and rainfall complete with mechanical, electrical with tertiary treatment facilities to ahieve desgined parameters of sewage at 3 RPD area, Comprises the following :- (Effluent) Treated sewage parameter PH - 6.5 - 8.3 COD < 50 mg/Ltr BOD <10 mg/Ltr TSS < 10 mg/Ltr Total Nitrogen 10 mg/Ltr Total Phosphorus 1 mg/L Fecal Coliform - Nil Odour - No foul odour 1. Raw sewage data will be collected by contractor from site and get it approved from NABL approved lab. after getting approval pakage type STP to be designed for Civil, Electrical, Mechanical, Hydollic and structual design if required and get it approved from Accepting officer.However referal data for raw sewage tested of NABL approved lab on dated 02 sep 2025 is enclosed. 2. Cost of Complete STP work including Electrical, Mechanical and Civil work which required for functioning of STP to achieved the above mention parameters are deemed to be included in quoted Rate. 3. Cost of all accessories i.e LT panel, Cable, Pipes, valves are deemed to be included. 4. Nothing extra shall be paid.
21.11 (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, silencers, safety valves, NRVs, flexible connections, and all standard accessories. Vendor shall design and select blower capacity as per process requirement; Minimum configuration: 1 Working + 1 Standby. Efficiency ≥ 70% at duty point. Motor: S1 duty, Class F insulation, IP-55 or better. Vendor to submit performance curves, power consumption, and guarantee certificate. (ii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shall design the air grid and manifolding; minimum guaranteed free air distribution through the grid shall be not less than 133 m³/hr (total) at system pressure losses considered. Air grid material: SS316 (all wetted parts). Includes one air rotameter per line as specified in Item (i). Vendor to submit hydraulic & air-loss calculations, GA drawings and FAT results. Any leakage, distribution imbalance or under-delivery to diffusers shall be rectified by vendor at no extra cost. Lot 1 Complete in all respects Supply & installation of Air Rotameter (glass tube type) with SS frame, isolation valve and necessary fittings for measuring air to reactor lines. Quantity: 01 No. per aeration line (confirm quantity as per vendor design). Rotameter accuracy ±5% full scale, readable scale, suitable for the design air flow range.
21.12 (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (b) Minimum thickness of bars: 8 mm (coarse) and 6 mm (fine). (c) Cleaning arrangement: Manual. (d) Screen frame and structure: SS316, corrosion resistant. (e) To be installed in RCC screen channel with proper supports and accessible for O&M. Note : Minimum required screen may please be provided as per design.
22 (b) FRP (Underground Package STP of 80,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 7.5 + 3 + 8.4 + 3 = 21.90 Hrs, Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness , Partition Thickness (if required), Partitions Nos (if required), Inflow Cap, Av. Flow, Peak Flow etc qty and size to be decided as per design submitted by contractor.
22.01 (h) Pressure Sand Filter Supply, installation, testing and commissioning of Pressure Sand Filter (vertical, skid mounted) complete in all respects, including vessel, filter media, internals, valves, instrumentation, backwash pump, blower, control panel, painting/coating, spares and accessories. 1 Each Job Excess(+) Full Conversion INR
22.02 (l) Raw Sewage Transfer Pump : Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 2 Nos (1W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and collection sump.Pump efficiency >60% at duty point ,pump casing CI(FG/260)/CF8M stainless steel for wear parts,impellar :vortex/non clog type dynamically balanced ,shaft SS 304,Motor:TEFC,IP68,class F insulation S1 duty,ISI marked.
22.03 SEWAGE TREATMENT SYSTEM (AT OD Complex)
22.04 (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatment unit. (a) Pumps shall be designed for required capacity and head suitable for 200 KLD STP tertiary treatment section. (b) Motor: IP-55 or better, Class F insulation, copper wound, continuous duty (S1). (c) Configuration: 2 Working + 1 Standby. (d) Level sensors/switches to be provi
22.05 Supply anf fix foot valve conforming to IS 4038, 100mm dia bore
22.06 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor.
22.07 (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 80 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate.
22.08 (c) FRP Underground Intermediate cum Treated Water Storage Tank 30,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty and size to be decided as per design submitted by contractor.
22.09 (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dosing, 4–5 mg/ltr or as required). (b) Dosing pumps: Electronic metering type, suitable for continuous operation. (c) Solution tank of suitable capacity, corrosion-resistant PVC construction or equivalent. (d) System shall include suction/discharge piping, valves, calibration column, non-return valve, isolation valve, and necessary supports. (e) Vendor to provide performance curves, OEM datasheets, test certificates, and 2-year warranty for pumps.
22.1 (f) FRP Tank Accessories required during installation : - RP Straps - 2700 mm Length, Turn Buckle - MOC CI, Wire Rope - MOC MS, Concrete Deadman - As per the length of the tank, Eye Bolt - FI :- 01 Lot
22.11 (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, silencers, safety valves, NRVs, flexible connections, and all standard accessories. Vendor shall design and select blower capacity as per process requirement; Minimum configuration: 1 Working + 1 Standby. Efficiency ≥ 70% at duty point. Motor: S1 duty, Class F insulation, IP-55 or better. Vendor to submit performance curves, power consumption, and guarantee certificate. (ii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shall design the air grid and manifolding; minimum guaranteed free air distribution through the grid shall be not less than 133 m³/hr (total) at system pressure losses considered. Air grid material: SS316 (all wetted parts). Includes one air rotameter per line as specified in Item (i). Vendor to submit hydraulic & air-loss calculations, GA drawings and FAT results. Any leakage, distribution imbalance or under-delivery to diffusers shall be rectified by vendor at no extra cost. Lot 1 Complete in all respects Supply & installation of Air Rotameter (glass tube type) with SS frame, isolation valve and necessary fittings for measuring air to reactor lines. Quantity: 01 No. per aeration line (confirm quantity as per vendor design). Rotameter accuracy ±5% full scale, readable scale, suitable for the design air flow range.
22.12 (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (b) Minimum thickness of bars: 8 mm (coarse) and 6 mm (fine). (c) Cleaning arrangement: Manual. (d) Screen frame and structure: SS316, corrosion resistant. (e) To be installed in RCC screen channel with proper supports and accessible for O&M. Note : Minimum required screen may please be provided as per design.
23 ded for ON–OFF operation based on filter tank level. (e) Flow meter with totalizer (electromagnetic, full-bore type) to be provided on main treated water header. (f) Vendor to submit pump Q–H curves, efficiency data, calibration/test certificates (from NABL/CPRI accredited lab).
23.01 (b) FRP (Underground Package STP) of 200,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness , Partition Thickness (if required), Partitions Nos (if required), Inflow Cap, Av. Flow, Peak Flow etc qty and size to be decided as per design submitted by contractor. 1 Each Job Excess(+) Full Conversion INR
23.02 (e) Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of bi
23.03 (c) FRP Underground Intermediate cum Treated Water Storage Tank 50,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty and size to be decided as per design submitted by contractor.
23.04 SEWAGE TREATMENT SYSTEM (AT NHL Complex)
23.05 (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 200 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate.
23.06 Supply and fix PVC insulated 3 core flat copper conductor (including jointing material) size 16 Sqm 1100 Volt, confirming to IS 694- 1940 complete for 10 HP motor.
23.07 (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 80 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate.
23.08 Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 200 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, temperture differential and rainfall complete with mechanical, electrical with tertiary treatment facilities to ahieve desgined parameters of sewage at OD Complex, Comprises the following :- (Effluent) Treated sewage parameter PH - 6.5 - 8.3 COD < 50 mg/Ltr BOD <10 mg/Ltr TSS < 10 mg/Ltr Total Nitrogen 10 mg/Ltr Total Phosphorus 1 mg/L Fecal Coliform - Nil Odour - No foul odour 1. Raw sewage data will be collected by contractor from site and get it approved from NABL approved lab. after getting approval pakage type STP to be designed for Civil, Electrical, Mechanical, Hydollic and structual design if required and get it approved from Accepting officer. However referal data for raw sewage tested of NABL approved lab on dated 02 sep 2025 is enclosed. 2. Cost of Complete STP work including Electrical, Mechanical and Civil work which required for functioning of STP to achieved the above mention parameters are deemed to be included in quoted Rate. 3. Cost of all accessories i.e LT panel, Cable, Pipes, valves are deemed to be included. 4. Nothing extra shall be paid.
23.09 (k) Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a) Disinfectant: Sodium Hypochlorite (Free Chlorine dosing, 4–5 mg/ltr or as required). (b) Dosing pumps: Electronic metering type, suitable for continuous operation. (c) Solution tank of suitable capacity, corrosion-resistant PVC construction or equivalent. (d) System shall include suction/discharge piping, valves, calibration column, non-return valve, isolation valve, and necessary supports. (e) Vendor to provide performance curves, OEM datasheets, test certificates, and 2-year warranty for pumps.
23.1 (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a) Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (b) Minimum thickness of bars: 8 mm (coarse) and 6 mm (fine). (c) Cleaning arrangement: Manual. (d) Screen frame and structure: SS316, corrosion resistant. (e) To be installed in RCC screen channel with proper supports and accessible for O&M. Note : Minimum required screen may please be provided as per design.
23.11 (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, silencers, safety valves, NRVs, flexible connections, and all standard accessories. Vendor shall design and select blower capacity as per process requirement; Minimum configuration: 1 Working + 1 Standby. Efficiency ≥ 70% at duty point. Motor: S1 duty, Class F insulation, IP-55 or better. Vendor to submit performance curves, power consumption, and guarantee certificate. (ii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shall design the air grid and manifolding; minimum guaranteed free air distribution through the grid shall be not less than 133 m³/hr (total) at system pressure losses considered. Air grid material: SS316 (all wetted parts). Includes one air rotameter per line as specified in Item (i). Vendor to submit hydraulic & air-loss calculations, GA drawings and FAT results. Any leakage, distribution imbalance or under-delivery to diffusers shall be rectified by vendor at no extra cost. Lot 1 Complete in all respects Supply & installation of Air Rotameter (glass tube type) with SS frame, isolation valve and necessary fittings for measuring air to reactor lines. Quantity: 01 No. per aeration line (confirm quantity as per vendor design). Rotameter accuracy ±5% full scale, readable scale, suitable for the design air flow range.
23.12 (a) Bar Screen :Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (b) Minimum thickness of bars: 8 mm (coarse) and 6 mm (fine). (c) Cleaning arrangement: Manual. (d) Screen frame and structure: SS316, corrosion resistant. (e) To be installed in RCC screen channel with proper supports and accessible for O&M. Note : Minimum required screen may please be provided as per design.
24 (d) (i) Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration where required as per design, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, silencers, safety valves, NRVs, flexible connections, and all standard accessories. Vendor shall design and select blower capacity as per process requirement; Minimum configuration: 1 Working + 1 Standby. Efficiency ≥ 70% at duty point. Motor: S1 duty, Class F insulation, IP-55 or better. Vendor to submit performance curves, power consumption, and guarantee certificate. (ii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shall design the air grid and manifolding; minimum guaranteed free air distribution through the grid shall be not less than 133 m³/hr (total) at system pressure losses considered. Air grid material: SS316 (all wetted parts). Includes one air rotameter per line as specified in Item (i). Vendor to submit hydraulic & air-loss calculations, GA drawings and FAT results. Any leakage, distribution imbalance or under-delivery to diffusers shall be rectified by vendor at no extra cost. Lot 1 Complete in all respects Supply & installation of Air Rotameter (glass tube type) with SS frame, isolation valve and necessary fittings for measuring air to reactor lines. Quantity: 01 No. per aeration line (confirm quantity as per vendor design). Rotameter accuracy ±5% full scale, readable scale, suitable for the design air flow range.
24.01 (x). Supply, installation, testing & commissioning of centrifugal sludge recirculation pumps with CI casing and impeller, complete with all necessary accessories for recirculation of biomass with sewage to anoxic chamber. Pumps shall include delivery header with pressure gauge on delivery line, isolation valves, and level controller (with wiring) to control sump level. (a)• Pumps to be suitable for continuous duty (S1), handling raw sewage/sludge with solids. (b) Motor: IP-55 or better, Class F insulation, copper wound. (c)Configuration: 1 Working + 1 Standby. (d) Vendor to submit pump curves, efficiency data, and test certificates from NABL/CPRI accredited lab. 1 Each Job Excess(+) Full Conversion INR
24.02 (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatment unit. (a) Pumps shall be designed for required capacity and head suitable for 250 KLD STP tertiary treatment section. (b) Motor: IP-55 or better,
24.03 Class F insulation, copper wound, continuous duty (S1). (c) Configuration: 2 Working + 1 Standby. (d) Level sensors/switches to be provided for ON–OFF operation based on filter tank level. (e) Flow meter with totalizer (electromagnetic, full-bore type) to be provided on main treated water header. (f) Vendor to submit pump Q–H curves, efficiency data, calibration/test certificates (from NABL/CPRI accredited lab).
24.04 (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 250 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate.
24.05 Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, temperture differential and rainfall complete with mechanical, electrical with tertiary treatment facilities to ahieve desgined parameters of sewage at NHL, Comprises the following :- (Effluent) Treated sewage parameter PH - 6.5 - 8.3 COD < 50 mg/Ltr BOD <10 mg/Ltr TSS < 10 mg/Ltr Total Nitrogen 10 mg/Ltr Total Phosphorus 1 mg/L Fecal Coliform - Nil Odour - No foul odour 1. Raw sewage data will be collected by contractor from site and get it approved from NABL approved lab. after getting approval pakage type STP to be designed for Civil, Electrical, Mechanical, Hydollic and structual design if required and get it approved from Accepting officer. However referal data for raw sewage tested of NABL approved lab on dated 02 sep 2025 is enclosed. 2. Cost of Complete STP work including Electrical, Mechanical and Civil work which required for functioning of STP to achieved the above mention parameters are deemed to be included in quoted Rate. 3. Cost of all accessories i.e LT panel, Cable, Pipes, valves are deemed to be included. 4. Nothing extra shall be paid.
24.06 (b) FRP (Underground Package STP of 250,000 Lit/Day capacity :- Tanks -04 Nos, MOC-FRP, Hy. Re. Time - 8 + 3 + 8 + 2.5 = 21.50 Hrs (Minimum), Type - Horizontal Under ground, Zones - (Solid Sep, Anoxic, Aeration & Sed), Manhole Dia , Manhole Nos, Tank Thickness , Partition Thickness (if required), Partitions Nos (if required), Inflow Cap, Av. Flow, Peak Flow etc qty and size to be decided as per design submitted by contractor.
24.07 (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty and size to be decided as per design submitted by contractor.
24.08 SEWAGE TREATMENT SYSTEM (AT SWARG Complex)
24.09 (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and collection sump.Pump efficiency >60% at duty point ,pump casing CI(FG/260)/CF8M stainless steel for wear parts,impellar :vortex/non clog type dynamically balanced ,shaft SS 304,Motor:TEFC,IP68,class F insulation S1 duty,ISI marked.
24.1 (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (b) Minimum thickness of bars: 8 mm (coarse) and 6 mm (fine). (c)Cleaning arrangement: Manual. (d) Screen frame and structure: SS316, corrosion resistant. (e) To be installed in RCC screen channel with proper supports and accessible for O&M.
24.11 (iii) Supply, installation, testing & commissioning of oil & grease removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Material of construction: Corrosion resistant, SS316 or equivalent. (d)Complete with drive unit, collection trough, and necessary accessories.
24.12 (iv) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps with chrome steel impeller and cutter, suitable for raw sewage, including guide rail, lifting chain, delivery header with pressure gauge, and all necessary accessories. Pumps shall be selected and sized by vendor to suit plant capacity and hydraulic requirement. Minimum efficiency at duty point shall be ≥ 60%. Motor: IP-68, Class F insulation, copper wound, S1 duty. Configuration: 2 working + 1 standby. Vendor to submit Q–H curve, NPSH data, efficiency test certificates (CPRI/NABL accredited).
24.13 (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals suitable for treatment of 400 KLD sewage, to meet required effluent quality norms. media shall be Virgin PP/HDPE, UV-stabilized, non-toxic, cylindrical type, with minimum 500 m²/m³ specific surface area. Minimum 35% media fill to be ensured. All SS parts shall be SS316, properly pickled and passivated. Vendor to provide OEM datasheet, test certificates, and minimum 5-year warranty for media.
24.14 (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, silencers, safety valves, NRVs, flexible connections, and all standard accessories. Vendor shall design and select blower capacity as per process requirement; Minimum configuration: 1 Working + 1 Standby. Efficiency ≥ 70% at duty point. Motor: S1 duty, Class F insulation, IP-55 or better. Vendor to submit performance curves, power consumption, and guarantee certificate.
24.15 (vii) Supply,
24.16 installation, testing & commissioning of coarse & fine bubble diffusers in Equalisation Tanks, Sludge Holding Tank and required Tanks. Diffusers to be of proven fine/coarse bubble design (disc / tubular) with membrane material EPDM / PTFE resistant to fouling and chemical degradation. Vendor to design diffuser type, quantity and layout to meet oxygen transfer requirement; however, diffuser system shall provide overall Oxygen Transfer Efficiency (OTE) ≥ 6% (per system test conditions) and withstand designed airflow. All diffuser supports, clamps and visible piping shall be SS316. Vendor to submit diffuser datasheet, OTE test data, layout drawings and calculations.
24.17 (viii) Supply, installation, testing & commissioning of Air Grid System (header & lateral) for Equalisation Tank and Sludge Holding Tank including all SS316 headers, laterals, fittings, supports, flexible connectors and connections to blowers. Vendor shall design the air grid and manifolding; minimum guaranteed free air distribution through the grid shall be not less than 133 m³/hr (total) at system pressure losses considered. Air grid material: SS316 (all wetted parts). Includes one air rotameter per line as specified in Item (i). Vendor to submit hydraulic & air-loss calculations, GA drawings and FAT results. Any leakage, distribution imbalance or under-delivery to diffusers shall be rectified by vendor at no extra cost. Lot 1 Complete in all respects Supply & installation of Air Rotameter (glass tube type) with SS frame, isolation valve and necessary fittings for measuring air to reactor lines. Quantity: 01 No. per aeration line (confirm quantity as per vendor design). Rotameter accuracy ±5% full scale, readable scale, suitable for the design air flow range. Material of wetted parts: SS316.
24.18 (ix) Supply, installation, testing & commissioning of anoxic tank mixer (submersible/propeller type) complete with motor, impeller, mounting accessories, and control system. (a) Mixer shall provide uniform mixing without vortex formation, suitable for continuous duty (S1).(b) Construction: MSEP/SS304 or better. (c)Vendor to provide OEM datasheet, performance curves, test certificates, and warranty.
25 (p). Supply, installation, testing & commissioning of Dual Media Filter, complete with filter vessel, filter media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a)Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: Anthracite, silica sand, and graded gravel/pebbles in suitable layers. (c) Filter to be designed for required flow rate as per 400 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Complete in all respects
25.01 (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 400 KLD STP. (a)Media: UV-stabilized Virgin PVC, Chevron/Hexagonal type, minimum thickness 1.0 mm, black colour, tongue & groove joints. (b)• Tube settler slope: 60°. (c)Scrapper mechanism: Centrally driven. (d) Inlet zone: MSEP, platform: MS. (e) Sludge removal through automatic desludge valve. (f) Trough: V-notch weirs, mild steel epoxy painted. (g) Vendor to submit OEM datasheet, test certificates, and warranty documents. 1 Each Job Excess(+) Full Conversion INR
25.02 (g) Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatment unit. (a) Pumps shall be designed for required capacity and head suitable for 250 KLD STP tertiary treatment section. (b) Motor: IP-55 or better,
25.03 Class F insulation, copper wound, continuous duty (S1). (c) Configuration: 2 Working + 1 Standby. (d) Level sensors/switches to be provided for ON–OFF operation based on filter tank level. (e) Flow meter with totalizer (electromagnetic, full-bore type) to be provided on main treated water header. (f) Vendor to submit pump Q–H curves, efficiency data, calibration/test certificates (from NABL/CPRI accredited lab).
25.04 (j) Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 250 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate.
25.05 Design,Supply, installation, testing and commissioing of underground Package Sewage Treatment System of capacity 250 KLD made of 100% FRP, with inbuild standard manholes and manhole cover based on any suitable technology as per geographical location, temperture differential and rainfall complete with mechanical, electrical with tertiary treatment facilities to ahieve desgined parameters of sewage at NHL, Comprises the following :- (Effluent) Treated sewage parameter PH - 6.5 - 8.3 COD < 50 mg/Ltr BOD <10 mg/Ltr TSS < 10 mg/Ltr Total Nitrogen 10 mg/Ltr Total Phosphorus 1 mg/L Fecal Coliform - Nil Odour - No foul odour 1. Raw sewage data will be collected by contractor from site and get it approved from NABL approved lab. after getting approval pakage type STP to be designed for Civil, Electrical, Mechanical, Hydollic and structual design if required and get it approved from Accepting officer. However referal data for raw sewage tested of NABL approved lab on dated 02 sep 2025 is enclosed. 2. Cost of Complete STP work including Electrical, Mechanical and Civil work which required for functioning of STP to achieved the above mention parameters are deemed to be included in quoted Rate. 3. Cost of all accessories i.e LT panel, Cable, Pipes, valves are deemed to be included. 4. Nothing extra shall be paid.
25.06 (xii) Supply, installation, testing and commissioning of sludge transfer pumping system for pumping settled sludge from sludge holding tank to dewatering unit. • Pumps shall be self-priming, non-clog type, designed for continuous duty in sewage / sludge service and capable of handling thickened sludge without choking. • System to include pumps 02 No (duty + standby), base frame, drive motors, suction & delivery piping, isolation valves, non-return valve, pressure gauge at outlet, level-sensing interlock for automatic start/stop, foundation bolts and all necessary accessories. • Contractor shall select pump capacity, head, motor rating and material of construction to meet process and site requirements.
25.07 (c) FRP Underground Intermediate cum Treated Water Storage Tank 60,000 Lit :- Tanks - 01 Nos, MOC - FRP, Type - Horizontal Underground, Zones- (Intermediate & Treated Water), Diamention, Manhole Dia, Manhole qty, Partitions (if required) etc qty and size to be decided as per design submitted by contractor.
25.08 SEWAGE TREATMENT SYSTEM (AT SWARG Complex)
25.09 (i) Supply, installation, testing & commissioning of non-clog vertical submersible sewage transfer pumps (Q,H as per vendor design). Quantity: 3 Nos (2W + 1S). Pumps to be provided with lifting chain/rail, guide system, pressure gauge, accessories and collection sump.Pump efficiency >60% at duty point ,pump casing CI(FG/260)/CF8M stainless steel for wear parts,impellar :vortex/non clog type dynamically balanced ,shaft SS 304,Motor:TEFC,IP68,class F insulation S1 duty,ISI marked.
25.1 (ii) Supply, installation, testing & commissioning of manual bar screen chamber fabricated from SS316, suitable for coarse & fine screening of sewage. (a)Perforation/spacing and angle of inclination to be designed as per hydraulic & process requirement. (b) Minimum thickness of bars: 8 mm (coarse) and 6 mm (fine). (c)Cleaning arrangement: Manual. (d) Screen frame and structure: SS316, corrosion resistant. (e) To be installed in RCC screen channel with proper supports and accessible for O&M.
25.11 (iii) Supply, installation, testing & commissioning of oil & grease removal system (oil skimmer) for Oil & Grease trap chamber. (a) Type: Belt/Tube/Slotted type or equivalent suitable for sewage application. (b) Capacity: Not less than 500 LPH. (c)Material of construction: Corrosion resistant, SS316 or equivalent. (d)Complete with drive unit, collection trough, and necessary accessories.
25.12 (xiii) Supply, installation, testing and commissioning of a complete screw-press sludge dewatering unit with polymer preparation and dosing system, filtrate collection tray, discharge chute, spray cleaning arrangement, drives, gearboxes, local control panel and all interconnections. • Equipment shall ensure efficient dewatering of excess sludge from the STP biological process, producing a stable sludge cake suitable for handling / disposal, with high solids capture. • All components in contact with sludge shall be of corrosion- and wear-resistant material (e.g. SS / polymer as appropriate). • The contractor shall design and size the p
25.13 (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals suitable for treatment of 400 KLD sewage, to meet required effluent quality norms. media shall be Virgin PP/HDPE, UV-stabilized, non-toxic, cylindrical type, with minimum 500 m²/m³ specific surface area. Minimum 35% media fill to be ensured. All SS parts shall be SS316, properly pickled and passivated. Vendor to provide OEM datasheet, test certificates, and minimum 5-year warranty for media.
25.14 (vi). Supply, installation, testing & commissioning of Twin Lobe Rotary Air Blowers for aeration in EQT, SHT & required tanks, including air rotameter in each line for measurement of air quantity. Blowers shall be complete with motor, drive, base frame, silencers, safety valves, NRVs, flexible connections, and all standard accessories. Vendor shall design and select blower capacity as per process requirement; Minimum configuration: 1 Working + 1 Standby. Efficiency ≥ 70% at duty point. Motor: S1 duty, Class F insulation, IP-55 or better. Vendor to submit performance curves, power consumption, and guarantee certificate.
25.15 (vii) Supply,
25.16 ress, polymer dosing rate, drive power, wash system and accessories to achieve required dryness and continuous, trouble-free operation.
25.17 (xiv). Supply, installation, testing & commissioning of Sodium Hypochlorite dosing system, comprising dosing pumps and solution tank with all necessary accessories for disinfection of treated sewage. (a)Disinfectant: Sodium Hypochlorite (Free Chlorine dosing, 4–5 mg/ltr or as required). (b) Dosing pumps: Electronic metering type, suitable for continuous operation. (c) Solution tank: Minimum 200 L, corrosion-resistant PVC construction or equivalent. (d)System shall include suction/discharge piping, valves, calibration column, non-return valve, isolation valve, and necessary supports. (e) Vendor to provide performance curves, OEM datasheets, test certificates, and 2-year warranty for pumps.
25.18 (xv). Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatment unit. (a) Pumps shall be designed for required capacity and head suitable for 400 KLD STP tertiary treatment section. (b)Motor: IP-55 or better, Class F insulation, copper wound, continuous duty (S1). (c) Configuration: 2 Working + 1 Standby. (d)• Level sensors/switches to be provided for ON–OFF operation based on filter tank level. (e)Flow meter with totalizer (electromagnetic, full-bore type) to be provided on main treated water header. (f) Vendor to submit pump Q–H curves, efficiency data, calibration/test certificates (from NABL/CPRI accredited lab).
26 (xi) Supply, installation, testing & commissioning of Tube Settler Tank internals, comprising media, collection trough, scrapper mechanism and necessary accessories, suitable for proper functioning of tube settler in 24 (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 400 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Excess(+) Full Conversion INR
27 900 KLD STP. (a)Media: UV-stabilized Virgin PVC, Chevron/Hexagonal type, minimum thickness 1.0 mm, black colour, tongue & groove joints. (b)• Tube settler slope: 60°. (c)Scrapper mechanism: Centrally driven. (d) Inlet zone: MSEP, platform: MS. (e) Sludge removal through automatic desludge valve. (f) Trough: V-notch weirs, mild steel epoxy painted. (g) Vendor to submit OEM datasheet, test certificates, and warranty documents. 96 (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 400 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Excess(+) Full Conversion INR
27.01 (v) Supply, installation, testing & commissioning of internals comprising media, SS air grid & riser pipe, media retaining sieves, and all necessary accessories,two rotameter for proper functioning. Vendor shall design and provide complete internals suitable for treatment of 900 KLD sewage, to meet required effluent quality norms. media shall be Virgin PP/HDPE, UV-stabilized, non-toxic, cylindrical type, with minimum 500 m²/m³ specific surface area. Minimum 35% media fill to be ensured. All SS parts shall be SS316, properly pickled and passivated. Vendor to provide OEM datasheet, test certificates, and minimum 5-year warranty for media.
27.02 Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 400 Cum/day (0.4 MLD), complete with all civil, electrical and mechanical works to achieve treated effluent quality as per (Effluent) Treated sewage parameter PH - 6.5 - 8.3 COD < 50 mg/Ltr BOD <10 mg/Ltr TSS < 10 mg/Ltr Total Nitrogen 10 mg/Ltr Total Phosphorus 1 mg/L Fecal Coliform - Nil Odour - No foul odour 1. Raw sewage data will be collected by contractor from site and get it approved from NABL approved lab. after getting approval Conventional STP to be designed for Civil, Electrical, Mechanical, Hydollic and structual design if required and get it approved from Accepting officer. However referal data for raw sewage tested of NABL approved lab on dated 02 sep 2025 is enclosed. 2. Cost of Complete STP work including Electrical, Mechanical and Civil work which required for functioning of STP to achieved the above mention parameters are deemed to be included in quoted Rate. 3. Cost of all accessories i.e LT panel, Cable, Pipes, valves are deemed to be included. 4. Nothing extra shall be paid.
27.03 Design, supply, installation, commissioning and testing of Sewage Treatment Plant based on any suitable technology as per geographical location, temperture differential and rainfall complete at Swarg Marg having capacity 900 Cum/day (0.9 MLD), complete with all civil, electrical and mechanical works to achieve treated effluent quality as per (Effluent) Treated sewage parameter PH - 6.5 - 8.3 COD < 50 mg/Ltr BOD <10 mg/Ltr TSS < 10 mg/Ltr Total Nitrogen 10 mg/Ltr Total Phosphorus 1 mg/L Fecal Coliform - Nil Odour - No foul odour 1. Raw sewage data will be collected by contractor from site and get it approved from NABL approved lab. after getting approval Conventional STP to be designed for Civil, Electrical, Mechanical, Hydollic and structual design if required and get it approved from Accepting officer. However referal data for raw sewage tested of NABL approved lab on dated 02 sep 2025 is enclosed. 2. Cost of Complete STP work including Electrical, Mechanical and Civil work which required for functioning of STP to achieved the above mention parameters are deemed to be included in quoted Rate. 3. Cost of all accessories i.e LT panel, Cable, Pipes, valves are deemed to be included. 4. Nothing extra shall be paid.
28 (xv). Supply, installation, testing & commissioning of filter feed centrifugal pumps (monobloc/close coupled) complete with motor, delivery header, isolation valves, pressure gauge, level sensors, and all necessary accessories for feeding tertiary treatment unit. (a) Pumps shall be designed for required capacity and head suitable for 900 KLD STP tertiary treatment section. (b)Motor: IP-55 or better, Class F insulation, copper wound, continuous duty (S1). (c) Configuration: 2 Working + 1 Standby. (d)• Level sensors/switches to be provided for ON–OFF operation based on filter tank level. (e)Flow meter with totalizer (electromagnetic, full-bore type) to be provided on main treated water header. (f) Vendor to submit pump Q–H curves, efficiency data, calibration/test certificates (from NABL/CPRI accredited lab). 96 (q). Supply, installation, testing & commissioning of Activated Carbon Filter, complete with filter vessel, activated carbon media, frontal piping, isolation valves, backwash arrangement, and pressure gauges to measure differential pressure. (a) Filter vessel: Mild Steel construction with internal epoxy/bituminous protective coating and external anticorrosive paint. (b) Filter media: High-quality activated carbon with supporting sand and gravel layers. (c) Filter to be designed for required flow rate as per 400 KLD STP tertiary treatment section. (d) Vendor to provide filter design, OEM datasheet, and test certificates,warantee certificate. Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.25 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_828043.xls
BOQ • 4.42 MB
Tender_80933_merged.pdf
Tender Documents • 12.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .