| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC 0 TAWOR ROAD GALI NO 3 NDC MURADNAGAR GHAZIABAD UTTAR PRADESH 201206 | GHAZIABAD | UTTAR PRADESH | 201206 | ₹8.8 L | L1 | Accepted-AOC ok |
| 2 | L2₹9.0 LRejected-AOC | ₹9.0 L | L2 | Rejected-AOC ok |
| 3 | L3₹9.2 LRejected-AOC NA | NA | NA | 121004 | ₹9.2 L | L3 | Rejected-AOC ok |
| 4 | L4₹9.4 LRejected-AOC 107 2A JAREEB CHOWKI JAREEB CHOWKI KANPUR NAGAR UTTAR PRADESH 208012 UDYAM UP 43 0037309 09AHKPG8599D1ZT R M MII STATUS AS VERIFIED | KANPUR NAGAR | UTTAR PRADESH | 208012 | ₹9.4 L | L4 | Rejected-AOC ok |
Tender Value
₹12.2 L
EMD Value
₹24,500
Closing Date
31 Jan 2026, 5:00 pmClosed
Executive Engineer, R.D.Spl.Div. Bokaro
O/o Executive Engineer, R.D.Spl.Div. Bokaro 1st floor, working womens hostel, Camp-II, B.S. City, Bokaro-827001
Construction of P.C.C Road From House of Nirjhar Sahay (Plot no-94) to House of Vinod Sharma at Aarya Bihar Sijuaa Road No- 3 Under Block-Chas District-Bokaro
2026_RDSPL_109679_1
RDD/SD/BOKARO/16/2025-26/GR02
Open Tender
Civil Works
90 days
Chas
Please refer Tender Documents
3 documents required · 3 mandatory
₹2,500
₹24,500
18 Apr 2026
24 Jan 2026
2 Feb 2026
24 Jan 2026
31 Jan 2026
24 Jan 2026
Laying and Jointing PVC Pipe. Heading
Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m RCD 3.06
Construction of subgrade and earthen shoulders with approved materials obtained from borrow pits or any other sources free from logs, roots, rubbish or any other ingredients likely to deteriorate or effect stability of the embankment including breaking the clods maximum to 60 mm cubes, placing the earth in layers not exceeding 225 mm loose thickness, rough dressing including cost of cutting and removing shrubs & roots in borrow area all complete job as per direction of E/I (Mode of measurement after required compaction) With initial lead of 15M & lift of 1.5M RCD 3.18
Compacting original ground supporting subgrade (Loosening of the ground upto a level of 150mm below the subgrade level,watered,graded and compacted in layers to meet requirement of table 300-2 for subgrade construction).RCD 3.20 Case ii
By mix in Place method ( construcion of granular sub base by providing coarse graded material spreading in uniform layer with motor grader on prepared surface, mixing by mix in placed method with rotavator at OMC and compacting with vibratory power roller to achieve desire density. (Grading II Materials) RCD 4.01(B)(ii)
Cement concrete pavement (Construction of un-reinforced,dowel jointed,plain cement concrete pavement over a prepared sub base with 43 grade cement coarse and fine aggregate confirming to IS 383, maximum size of coarse aggregate not exceeding 25mm mixed in batching and mixing plant as per approved mix design, transported to site, laid with a fixed form, spread compacted and finished in continuous operation including provision of contraction,expansion,construction and longitudinal joints.RCD 6.4
Earth work in excavation in foundation trenches in ordinary soil (vide classfication of soil item -A) and extra for eath work in hard soil and disposal of excavated soil as obtained to a distance upto 50 mtr BCD 5.1.1
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick all complete job as per building specification. BCD (5.1.10)
Supplying and laying boulder in the rock toe, heel trenches of the dam as per design and drawing including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direcition of E/I. Part A 5.6.4
Poviding P.C.C.M-10 with nominal mix of (1:3:6) in foundation with approved quality of stone chips 20 mm to 6mm size graded and clean coarse sand all complete job as per specification and direction of E/I. BCD (5.3.1.4)
Providing R.C.C. M-200 with nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand all complete job as per specification and direction of E/I BCD (5.3.10)
Centering and shuttering including strutting proping etc.and removal of form for mass concrete.BCD (5.3.17.2)
Providing Tor steel reinforcement of different dia as per approved design and drawing all complete job as per specification and direction of E/I BCD .(5.5.5.a)
Providing Tor steel reinforcement of different dia as per approved design and drawing all complete job as per specification and direction of E/I BCD .(5.5.5.b)
Providing designation 75B one brick flat soling filled with local sand including cost of wateringtaxes and royalty all complete job. BCD (5.6.3)
Poviding P.C.C.M-15 with nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm to 6mm size graded and clean coarse sand all complete job as per specification and direction of E/I. BCD (5.3.1.2)
Poviding P.C.C.M-15 with nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm to 6mm size graded and clean coarse sand all complete job as per specification and direction of E/I. BCD (5.3.1.1)
Centering and shuttering including strutting, propping etc. and removal of form for etc B.C.D. S.O.R. Item No. 5.3.17.3
Carriage of materials:- (a) Cement
(b) Sand
(c) Stone chips
(d) M.S. Reinforcement
(e) Bricks
(f)Dust
Add. 18% GST
Add. 1% Labour Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_148165.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
SBD.pdf
Tender Documents • 0.98 MB
BOQ_148165.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid