| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LRejected-Finance | ₹16.8 L | L1 | Rejected-Finance Due to administrative reason |
| 2 | L2₹18.2 LRejected-Finance 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | ₹18.2 L | L2 | Rejected-Finance Due to administrative reason |
| 3 | L3₹19.4 LRejected-Finance NOCHIPALAYAM AUTHUR PO KARUR 2 | ₹19.4 L | L3 | Rejected-Finance Due to administrative reason |
| Sl No | Description | Qty | Unit | K.SELVARAJ L3 | Vidhyut Nirman Corporation L2 | TRadhakrishnanandco L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing of light and heavy jungles away from the area including cost of all materials lead, lift and labour charges etc complete.
A. Light jungle area | 15,840 | One square metre only 1 m3 | 6 ₹95,040 | 5 ₹79,200 | 5 ₹79,200 |
| 2.00 | Clearing of light and heavy jungles away from the area including cost of all materials lead, lift and labour charges etc complete.
B.Heavy jungle area | 23,760 | One square metre only 1 m3 | 9.5 ₹2,25,720 | 7 ₹1,66,320 | 8 ₹1,90,080 |
| 3.00 | Clearing and removal of slipped earth boulders away from the site including cost of all materials lead, lift and labour charges etc complete. | 144 | One cubic metre only 1 m3 | 300 ₹43,200 | 350 ₹50,400 | 150 ₹21,600 |
| 4.00 | Earth work excavation and depositing on back with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, sheles, murram, gravel, stoney earth and earth mixed with small size boulders SS.20.B. Including cost of all materials, lead, lift, labour charges, etc., complete. | 13.2 | One cubic metre only 1 m3 | 200 ₹2,640 | 350 ₹4,620 | 150 ₹1,980 |
| 5.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar,not requiring blasting.. Including cost of all materials, lead, lift, labour charges, etc., complete. | 10 | One cubic metre only 1 m3 | 300 ₹3,000 | 500 ₹5,000 | 250 ₹2,500 |
| 6.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting. Including cost of all materials, lead, lift, labour charges, etc., complete. | 10 | One cubic metre only 1 m3 | 400 ₹4,000 | 525 ₹5,250 | 1,000 ₹10,000 |
| 7.00 | Drilling holes of 40 mm dia - 0.90 m deep in Hard granite surface, fabrication and fixing 25 mm dia RTS grip rods inside the drill holes for Anchor rods and above ground level of total length of (0.90+0.90) = 1.80m in all length grouting the same with cement slury or resin capsules at 750mm spacing including cost of all materials, lead, lift, labour charges etc complete., as directed by Engineer in charge drawing and specification. | 66 | One number only 1 No | 676 ₹44,616 | 650 ₹42,900 | 1,000 ₹66,000 |
| 8.00 | Filling the foundation with M sand with watering proper consolidation including cost of all materials, lead, lift, labour charges etc., complete. | 7 | One cubic metre only 1 m3 | 1,680 ₹11,760 | 1,250 ₹8,750 | 1,500 ₹10,500 |
| 9.00 | Providing and laying PCC 1:3:6 mix using 40mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge | 8 | One cubic metre only 1 m3 | 6,381 ₹51,048 | 7,000 ₹56,000 | 6,500 ₹52,000 |
| 10.00 | Providing and laying PCC 1:2:4 mix using 12-20mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge | 5 | One cubic metre only 1 m3 | 8,229 ₹41,145 | 8,250 ₹41,250 | 7,000 ₹35,000 |
Tender Value
Refer Docs
EMD Value
₹28,300
Closing Date
14 Oct 2025, 2:00 pmClosed
SE/C/HP/ERODE
955, EVN Road, Erode
Construction of RCC Protection wall at the Earth slipped area at 6th bend and providing support to the rock to avoid slippage along the road at 8th bend leading from Dam Left flank to Dam Right Flank at Upper Aliyar Dam
2025_EB_610123_2
SECHPERDKadGenCircle03202526
Open Tender
Civil Works
KADAMPARAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,300
29 Jan 2026
29 Sept 2025
15 Oct 2025
29 Sept 2025
14 Oct 2025
29 Sept 2025
Clearing of light and heavy jungles away from the area including cost of all materials lead, lift and labour charges etc complete. A. Light jungle area
Clearing of light and heavy jungles away from the area including cost of all materials lead, lift and labour charges etc complete. B.Heavy jungle area
Clearing and removal of slipped earth boulders away from the site including cost of all materials lead, lift and labour charges etc complete.
Earth work excavation and depositing on back with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, sheles, murram, gravel, stoney earth and earth mixed with small size boulders SS.20.B. Including cost of all materials, lead, lift, labour charges, etc., complete.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar,not requiring blasting.. Including cost of all materials, lead, lift, labour charges, etc., complete.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting. Including cost of all materials, lead, lift, labour charges, etc., complete.
Drilling holes of 40 mm dia - 0.90 m deep in Hard granite surface, fabrication and fixing 25 mm dia RTS grip rods inside the drill holes for Anchor rods and above ground level of total length of (0.90+0.90) = 1.80m in all length grouting the same with cement slury or resin capsules at 750mm spacing including cost of all materials, lead, lift, labour charges etc complete., as directed by Engineer in charge drawing and specification.
Filling the foundation with M sand with watering proper consolidation including cost of all materials, lead, lift, labour charges etc., complete.
Providing and laying PCC 1:3:6 mix using 40mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge
Providing and laying PCC 1:2:4 mix using 12-20mm HBG metal cost of all materials, lead, lift, curing, labour charges etc., complete complying with standard specification and as directed by Engineer-in-charge
Providing and laying RCC 1:1.5:3 mix using 12-20 mm HBG metal including cost of all materials, lead, lift, curing, labour charges etc., complete. Up to 3 Mtr height Base slab (without form work)
Providing and laying RCC 1:1.5:3 mix using 12-20 mm HBG metal including cost of all materials, lead, lift, curing, labour charges etc., complete. Up to 3 Mtr height Stem (with form work)
Providing and laying RCC 1:1.5:3 mix using 12-20 mm HBG metal including cost of all materials, lead, lift, curing, labour charges etc., complete. Up to 6 Mtr height Base slab (with form work)
Providing and laying RCC 1:1.5:3 mix using 12-20 mm HBG metal including cost of all materials, lead, lift, curing, labour charges etc., complete. Up to 6 Mtr height stem (wall with form work)
Supplying and laying in position of RTS/TMT rods for reinforcement including transporting, cutting charges, bending, tying including cost of all materials, lead, lift, labour charges etc complete
Supplying and fixing 110mm dia PVC pipe for weep hole including cost of cutting and fixing in RCC wall, cost of all materials, labour, lead, lift etc., complete.
Supply of rubble and back filling the available earth (60%) with rubble(40%) including cost of consolidation by watering by layer by layer including cost of all materials, labor, lead, lift etc., complete
Vidhyut Nirman Corporation (BID ID -1486668)
K.SELVARAJ (BID ID -1477550)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf