Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.2 L+₹31,838.63 (4.63%)Admitted-Finance GALI NO 1 KRISHNA NAGAR MAINPURI | L2 | Admitted-Finance | ||
| 3 | L3₹7.6 L+₹76,802.22 (11.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹8.3 L+₹1.4 L (20.2%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹84,678
Closing Date
6 May 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
Zone-3 Tajganj Installation of a tin shed within the Pitambara Mata Temple complex.
2026_DOLBU_1138115_1
16-04-2026/NAGAR NIGAM AGRA/06-05-2026/23
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹84,678
14 May 2026
23 Apr 2026
6 May 2026
23 Apr 2026
6 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) PWD Shedule | - | Cum | - | - |
| 2 | Providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.Si.-01) | - | Cum | - | - |
| 3 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 (One Part of Cement, Two Part of Coarse Sand and Four Part of 2cm Stone Grit) in Raft foundation and footing with 4cm. Gauge apporved stone ballast supply of reinforcement and its bending butinculding its fixing and binding the same with 24 bwgi binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than m-150. (5-Chapter PWD SCH.No.287) | - | Cum | - | - |
| 4 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1½:3 (One part of Cement, 1½ part of Coarse sand and 3 part of 2cm. Stone Grit) in Wall/R.CC Column excluding supply of reinforcement and its bending but inculding its fixing and binding the same with 24 BWGI binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-200 grade. (5-Chapter PWD SCH.No..12) | - | Cum | - | - |
| 5 | Supply and Fixing of M/S fabricated Grill/Stair case including supply of steel and its wastage including cost of Bolt/Nut if required for proper completion of work including febrication of holes in Grill/Stairs case railing etc. all complete. (Chapter No.10 Sl No. 502(c) 10-21) | - | Kg | - | - |
| 6 | Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumean and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets comlete (up to any pitch in horizontal/vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (Chapter No.11 Si.No.12.1.1) | - | Sqm | - | - |
| 7 | Painting with synthetic enamet paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. (Chatper - 15 S.N. - 4) | - | Sqm | - | - |
| 8 | Sub Total (A) | - | Rs | - | - |
| 9 | Add/Deduction Rs. For Estimate Figure Amount Match | - | Rs | - | - |
| 10 | Grand Total | - | Rs | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.59 MB
BOQ_2130425.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .