Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.9 LAdmitted-Finance | ₹1.9 L | Admitted-Finance |
| 2 | ₹1.9 LAdmitted-Finance | ₹1.9 L | Admitted-Finance |
| Sl No | Description | Qty | Unit | PARDEEP KUMAR | ROSHAN LAL RAINA |
|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas ( exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer in charge. Ordinary rock | 34.69 | Cum | 13,876 ₹13,876 Lowest | 14,569.8 ₹14,569.8 |
| 1.02 | Earth work in excavation by mechanical means ( Hydraulic excavator) manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan, including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, with in a lead of 50 m. All kind of soil | 9.6 | Cum | 3,436.8 ₹3,436.8 Lowest | 3,456 ₹3,456 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of Centering and shuttering - All work upto plinth level :
1:5:10(1 cement : 5 manufactured sand derived from Recycled concrete Aggregate (RCA): 10 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) (Zone-III)derived from natural source: 6 graded stone aggregate 40mm nominal size derived from natural sources) | 4.06 | Cum | 34,916 ₹34,916 | 34,713 ₹34,713 Lowest |
| 1.04 | 1:3:6 ( 1 cement: 3 coarse sand (zone iii) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 11.48 | Cum | 91,840 ₹91,840 Lowest | 91,840 ₹91,840 Lowest |
| 1.05 | Centering and shuttering including strutting, propping etc and removal of form work for : foundation , footing bases for columns | 14.44 | Sqm | 6,064.8 ₹6,064.8 Lowest | 6,064.8 ₹6,064.8 Lowest |
| 1.06 | Excavating, supplying and filling of local earth (including royalty ) by mechanical transport upto a lead 05 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth sides of foundation etc. complete. | 4.44 | Cum | 1,718.28 ₹1,718.28 Lowest | 1,731.6 ₹1,731.6 |
| 1.07 | Cement concrete flooring 1:2:4 ( 1 cement : 2 Coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of noising of steps etc. complete 40 mm thick with 20 mm nominal size stone aggregate | 26.92 | Sqm | 19,220.88 ₹19,220.88 Lowest | 19,247.8 ₹19,247.8 |
| 1.08 | Making plinth protection 50mm thick of cement concrete 1:3:6 ( 1 cement: 3 coarse sand ( zone III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources ) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well reamed and consolidated and grouted with fine sand, including necessary excavation , levelling & dressing & finishing the top smooth | 18.06 | Sqm | 14,989.8 ₹14,989.8 | 14,448 ₹14,448 Lowest |
| 1.09 | 15 mm cement plater on the rough side of single or half brick wall of mix
1: 6 ( 1 cement : 6 fine sand ) | 7.22 | Sqm | 3,971 ₹3,971 | 2,815.8 ₹2,815.8 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
29 May 2026, 4:00 pmClosed
The Commandant 84 Bn
The Commandant 84 Bn CRPF Old FCI Camp Chatha Jamm 180009
Construction of Plinth for PF Huts size 16 x 24 ft toilet block at Tac Hq Boom Chanderkote Ramban JK
2026_CRPF_908769_1
U II 4/2026-27 Q 84
Limited
Civil Works - Buildings
Works
60 days
Tac Hq Boom Chanderkote Ramban JK
As per tender documents
5 documents required · 5 mandatory
₹200
The Commandant 84 Bn CRPF Old FCI Camp Chatha Jamm
₹4,000
Yes
5 Jun 2026
16 May 2026
30 May 2026
17 May 2026
29 May 2026
17 May 2026
17 May 2026 - 18 May 2026
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 1.77 MB
Tendernotice_3.pdf
PDF • 1.45 MB
Tendernotice_4.pdf
PDF • 0.71 MB
Tendernotice_5.pdf
PDF • 2.53 MB
IMPORTANTINSTRUCTIONS.pdf
Tender Documents • 1.43 MB
DESCRIPTIONOFWORK.pdf
Tender Documents • 0.69 MB
SCHEDULETOTENDER.pdf
Tender Documents • 1.20 MB
TERMSANDCONDITIONS.pdf
Tender Documents • 1.76 MB
TENDERDOCUMENTS.pdf
Tender Documents • 2.52 MB
BOQ_955184.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .