| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 CrAdmitted-Finance | -9.71% | ₹5.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.7 Cr+₹23.0 L (4.20%)Admitted-Finance | -5.92% | ₹5.7 Cr+₹23.0 L (4.20%) | L2 | Admitted-Finance |
| 3 | L3₹5.8 Cr+₹33.1 L (6.04%)Admitted-Finance | -4.26% | ₹5.8 Cr+₹33.1 L (6.04%) | L3 | Admitted-Finance |
| 4 | L4₹5.8 Cr+₹35.5 L (6.48%)Admitted-Finance | -3.86% | ₹5.8 Cr+₹35.5 L (6.48%) | L4 | Admitted-Finance |
| 5 | L5₹6.2 Cr+₹70.9 L (12.9%)Admitted-Finance | +1.97% | ₹6.2 Cr+₹70.9 L (12.9%) | L5 | Admitted-Finance |
Tender Value
₹7.2 Cr
EMD Value
₹14.3 L
Closing Date
4 Aug 2026, 6:00 pmClosed
Addl. Chief Engineer PWD Zone Ajmer
Civil Line Ajmer
Construction of Four Lane CC Road From Poki Nadi Circle to Babaji Ki Kutiya, Kekri (Ajmer)
2026_CEPWD_574379_3
NIT No 13 of 2026-27 ACE PWD Zone Ajmer
Open Tender
Civil Works
Percentage
270 days
Kekri
Please refer tender document
5 documents required · 5 mandatory
₹5,000
EE PWD DN KEKRI / MD RISL JAIPUR
₹14.3 L
Yes
13 Aug 2026
13 Jul 2026
7 Aug 2026
13 Jul 2026
4 Aug 2026
13 Jul 2026
13 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART "A" : Road Work | - | - | - | - |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 6,288 | Cum | 25 | ₹1,57,200 |
| 3 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per MoRTH Specification Clause 305.4.3 | 6,380 | Sqm | 13 | ₹82,940 |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 4,972 | Cum | 44 | ₹2,18,768 |
| 5 | Carriage of Earth, Sand, Lime, Morrum manure or sludge including loading unloading with 20 Km lead | 4,972 | Cum | 109.05 | ₹5,42,196.6 |
| 6 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion
complete.[MoRTH specification : Clause 401]. By mechanical means. | 3,627 | Cum | 751 | ₹27,23,877 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. | 4,970 | Cum | 1,044 | ₹51,88,680 |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 15,400 | Sqm | 28 | ₹4,31,200 |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 15,400 | Sqm | 8.75 | ₹1,34,750 |
| 10 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30) Grading - II (26.50 mm (Nominal Size)) | 924 | Cum | 6,260 | ₹57,84,240 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.95 MB
Tendernotice_2.pdf
PDF • 5.64 MB
Tendernotice_3.pdf
PDF • 0.62 MB
Tendernotice_4.pdf
PDF • 23.43 MB
Tendernotice_5.pdf
PDF • 0.10 MB
BG.pdf
Tender Documents • 0.31 MB
BOQ_1021700.xls
BOQ • 0.30 MB
3Bid_PokiNadi.pdf
Tender Documents • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .