Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 57 SECOND STREET KESAVAPURAM MINJUR 601 203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹13,100
Closing Date
26 Jun 2024, 2:00 pmClosed
SE MECH II NCTPS II
SE MECH II NCTPS II Ch 120
Overhauling of various size of valves in ACW pump house
2024_EB_455402_1
SE M II O M NCTPS II 26 24 25
Open Tender
Miscellaneous Works
Works
80 days
SE MECH II NCTPS II
Refer Tender Specification
2 documents required · 2 mandatory
₹0
₹13,100
Yes
30 Jul 2024
19 Jun 2024
27 Jun 2024
19 Jun 2024
26 Jun 2024
19 Jun 2024
Amount
Charges for overhauling of 700 NB butterfly valve work involves in loosening of bolts & nuts, lifting of butterfly valve using chain block, inside mollusk cleaning of butterfly valve, replacement of old seal and fixing of new seal, fixing of new gaskets of butterfly valve, positioning of butterfly valve using chain block & tightening of bolts & nuts & cutting of supports and painting of valve including all required consumables
Charges for overhauling of 600 NB butterfly valve work involves in loosening of bolts & nuts, lifting of butterfly valve using chain block, inside mollusk cleaning of butterfly valve, replacement of old seal and fixing of new seal, fixing of new gasket of butterfly valve, positioning of butterfly valve using Chain block & tightening of bolts & nuts & cutting of supports and painting of valve including all required consumables
Charges for overhauling of 600 NB Non return valve work involves in loosening of bolts & nuts, Lifting of NRV valve using chain block, inside mollusk cleaning of NRV valve, complete inspection, removal of NRV flap, inspection/rectification of seating area and flap moving area, fixing of new gasket, positioning of non return valve using chain block & tightening of bolts & nuts, cutting of supports and painting of valve including all required consumables
Charges for overhauling of 600 NB Butterfly valve gear box work involes dismantling of gear box, complete cleaning all internals, inspection of gears and drive shaft, renewal/rectification of internal spares in gearbox, worn out seals and o ring replacement, new greasing, assembling, commissioning and painting of valve including all required consumables
Charges for overhauling of Vacuum pump PHE inlet & outlet & ACW header vent are Repair and reconditioning of 150 NB butterfly valves. complete dismantling of valve internals and renewal/recondition of wornout spares in and outer of valves and painting of valve including all required consumables
Charges for painting the ACW pipe lines from cooling water inlet header intake to ACW pump house and PHE outlet in Transformer road outside to cooling water outlet header with one coat red oxide primer including cost of red oxide, T & P and consumables.
Charges for painting the ACW pipe lines from cooling water inlet header intake to ACW pump house and PHE outlet in Transformer road outside to cooling water outlet header with one coat paint including cost of enamel paint, T & P and consumables.
EZHIL ENTERPRISES (BID ID -1069204)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .