Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC 569 SECTOR 20A CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹32.8 L Quoted ₹25.5 L | L1 | Accepted-AOC In Order |
| 2 | L2₹27.9 LRejected-Finance | ₹27.9 L | L2 | Rejected-Finance Not in order |
| 3 | L3₹28.3 LRejected-Finance SHOP NO 2 JAISINGHPURA SECTOR 27 PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹28.3 L | L3 | Rejected-Finance Not in order |
| 4 | Rejected-Technical E 162 PHASE VII INDUSTRIAL AREA MOHALI | - | - | Rejected-Technical Not in order |
Tender Value
₹32.8 L
EMD Value
₹65,622
Closing Date
9 Feb 2026, 12:00 pmClosed
Executive Engineer Roads Division No 2 MC Chd
Executive Engineer Roads Division No 2 MC Chandigarh
Providing and Fixing G.I. pipe railing on V-4 Road, Parking, Vikas Nagar and repair of existing railing Sector 45 and 46, Chandigarh
2026_MCC_90338_1
2026/R2/10
Open Tender
Civil Works
90 days
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹65,622
7 Apr 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Providing and fixing 3" dia (80mm nominal dia and 89.50 mm outside dia) G.I pipe railing having 2'-3" above ground level (8.37Kg/mtr, Medium class) and 1'-6'' below ground vertical members to be fixed 7'-0" centre to centre. The horizontal and vertical members of railing are to be connected by 3" G.I. tee and 3" G.I. elbow. The vertical members of railing are to be connected with 1' - 0'' anchorage piece to be welded at the bottom of G.I pipe vertical member of M.S. flat (50 x 12)mm embaded cement concrete (1:2:4) of block size 1'-0'' x 1'-0'' x 1'-6''. The rates also includes cost of makimg pits on all types of surface, welsing of of all joints and lifting of all disposal/malba material from site complete in all espect to the entire satisfaction of the Engineer - In - Charge. (N.S.)
Dismantling of existing G.I pipe railing and re - fixing of G.i pipe railing with the help of G.I. tee and elbow and proper alignment at site. The rates also include the cost of cement concrete (1:2:4) and disposal of malba to be removed from site complete in all respect to the entire satisfaction of the Engineer-In-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_110481.pdf
BOQ Comparative Chart
xlsx
finsummary_110481.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.14 MB
BOQ_110481.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid