Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹47.1 CrAccepted-AOC | ₹47.1 Cr Quoted ₹48.8 Cr | 1 | Accepted-AOC LESS RATE QUOTED BY BIDDER |
| 2 | 2₹51.0 Cr+₹2.1 Cr (4.40%)Rejected-Finance 74 T N H B COLONY NEAR BALAMURUGAN TEMPLE MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹51.0 Cr+₹2.1 Cr (4.40%) | 2 | Rejected-Finance Above rate quoted by bidder |
| Sl No | Description | Qty | Unit | Sri Sivaram and co L2 | SAMRAT - WIN - Renaatus (JV) L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including refilling charges | 27,438 | cum (one cubic metre) | 39,78,510 ₹39,78,510 | 31,55,370 ₹31,55,370 Lowest |
| 2.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in clusive of shoring shuttering, bailing out water herever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 6,568 | cum(one cubic metre) | 9,19,520 ₹9,19,520 | 7,61,888 ₹7,61,888 Lowest |
| 3.00 | Clearing the bund from debris/solid waste- ORDINARY SOIL (SS20A) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth. Conveyance by roads in plains o to 10 km including Loading unloading and transportation charges. Rate for every additional shift to reach bank lying more than 8m. | 9,566.5 | cum(one cubic metre) | 9,75,783 ₹9,75,783 | 8,13,152.5 ₹8,13,152.5 Lowest |
| 4.00 | Earth work excavation for desilting the existing rivers / canals / channels/odai/ nullas / drains/flood bowls/ tanks/ reservoirs etc., consisting of very loose soil, silt, oily silt, slushy, marshy, loany, organic soil, sea shell and flat mica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas / drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete | 1,28,234 | cum (one cubic metre) | 1,53,88,080 ₹1,53,88,080 | 1,34,64,570 ₹1,34,64,570 Lowest |
| 5.00 | EARTH WORK EXCAVATION FOR PIPE LAYING WORKS FOR WATER SUPPLY AND SEWERAGE WORKS Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil. | 5,531.5 | cum (one cubic metre) | 18,53,052.5 ₹18,53,052.5 | 16,59,450 ₹16,59,450 Lowest |
| 6.00 | Trimming the bed and the side slope of the bank in all soils except hard rock upto a thickness of 7.5 cm to 15 cm and making it ready to receive the concrete. | 6,834 | cum (one cubic metre) | 2,05,020 ₹2,05,020 | 1,70,850 ₹1,70,850 Lowest |
| 7.00 | Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation with min slope of 1:2. | 2,194.5 | cum (one cubic metre) | 39,501 ₹39,501 | 32,917.5 ₹32,917.5 Lowest |
| 8.00 | Provision for shifting the De silted Earth, Conveying the excavated silt in unhygienic & insanitary conditions to the dumping yard or low lying areas as directed by the field Engineer's by deploying the earth moving machinery, hydraulic excavator, tippers & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners, including leveling etc Complete. | 1,35,958.5 | cum (one cubic metre) | 47,58,547.5 ₹47,58,547.5 | 40,78,755 ₹40,78,755 Lowest |
| 9.00 | Conveyance of desilted earth by roads in plains 0 to 2 km including Loading unloading and transportation charges. | 2,22,249 | cum(one cubic metre) | 1,55,57,430 ₹1,55,57,430 | 1,33,34,940 ₹1,33,34,940 Lowest |
| 10.00 | Cleaning the Juliflora Jungle with Uprooting. Complete. | 1,20,136 | sqm (one Square metre) | 12,01,360 ₹12,01,360 Lowest | 13,81,564 ₹13,81,564 |
Tender Value
₹47.9 Cr
EMD Value
₹47.9 L
Closing Date
10 Feb 2026, 3:00 pmClosed
COMMISSIONER
Annal Gandhi adigal salai Ramanathapuram
Ramanathapuram Municipality Restoration Development Interlinking and protection of Twenty Five Water Bodies with Operation and Maintenance for the period of five years
2026_MAWS_641424_1
3172/2025/E1
Open Tender
Civil Works
Works
365 days
MUNICIPAL OFFICE RAMANATHAPURAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹47.9 L
MUNICIPAL OFFICE RAMANATHAPURAM
1 Jul 2026
10 Jan 2026
10 Feb 2026
10 Jan 2026
10 Feb 2026
20 Jan 2026
19 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including refilling charges | 27,438 | cum (one cubic metre) | - | - |
| 2 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in clusive of shoring shuttering, bailing out water herever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 6,568 | cum(one cubic metre) | - | - |
| 3 | Clearing the bund from debris/solid waste- ORDINARY SOIL (SS20A) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth. Conveyance by roads in plains o to 10 km including Loading unloading and transportation charges. Rate for every additional shift to reach bank lying more than 8m. | 9,566.5 | cum(one cubic metre) | - | - |
| 4 | Earth work excavation for desilting the existing rivers / canals / channels/odai/ nullas / drains/flood bowls/ tanks/ reservoirs etc., consisting of very loose soil, silt, oily silt, slushy, marshy, loany, organic soil, sea shell and flat mica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas / drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete | 1,28,234 | cum (one cubic metre) | - | - |
| 5 | EARTH WORK EXCAVATION FOR PIPE LAYING WORKS FOR WATER SUPPLY AND SEWERAGE WORKS Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil. | 5,531.5 | cum (one cubic metre) | 65 | ₹3,59,547.5 |
| 6 | Trimming the bed and the side slope of the bank in all soils except hard rock upto a thickness of 7.5 cm to 15 cm and making it ready to receive the concrete. | 6,834 | cum (one cubic metre) | - | - |
| 7 | Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation with min slope of 1:2. | 2,194.5 | cum (one cubic metre) | - | - |
| 8 | Provision for shifting the De silted Earth, Conveying the excavated silt in unhygienic & insanitary conditions to the dumping yard or low lying areas as directed by the field Engineer's by deploying the earth moving machinery, hydraulic excavator, tippers & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners, including leveling etc Complete. | 1,35,958.5 | cum (one cubic metre) | - | - |
| 9 | Conveyance of desilted earth by roads in plains 0 to 2 km including Loading unloading and transportation charges. | 2,22,249 | cum(one cubic metre) | - | - |
| 10 | Cleaning the Juliflora Jungle with Uprooting. Complete. | 1,20,136 | sqm (one Square metre) | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.37 MB
VOL5.pdf
Tender Documents • 4.46 MB
VOL1.pdf
Tender Documents • 0.94 MB
VOL2.pdf
Tender Documents • 0.77 MB
VOL451TO100.pdf
Tender Documents • 4.59 MB
VOL4101TO150.pdf
Tender Documents • 4.59 MB
VOL4201TO250.pdf
Tender Documents • 4.59 MB
VOL4251TO254.pdf
Tender Documents • 2.53 MB
BOQ_768247.xls
BOQ • 0.45 MB
VOL4151TO200.pdf
Tender Documents • 4.59 MB
VOL41TO50.pdf
Tender Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .