| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC 606 80 FEET ROAD 7TH BLOCK 2ND PHASE BANASHANKARI 3RD STAGE BANGALORE 560 085 | BENGALURU URBAN | KARNATAKA | 560085 | ₹2.7 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹2.9 Cr+₹22.4 L (8.38%)Rejected-Finance | ₹2.9 Cr+₹22.4 L (8.38%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹3.1 Cr+₹41.5 L (15.5%)Rejected-Finance 121004 | ₹3.1 Cr+₹41.5 L (15.5%) | L3 | Rejected-Finance Not Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not enlisted in appropriate category as per NIT i.e. c(vi) |
| 5 | Rejected-Technical SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | - | - | Rejected-Technical Enlisted in c (vi) category for repairs and maintenance only. |
| Sl No | Description | Qty | Unit | Neptune Engineers and Builders L3 | B5BUILDING SOLUTIONS L2 | Lucky Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00Schedule 'A' Part-I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | ||||||
| 1.01 | Lumpsum price worked out by the contractor for Pump house Building with permanent specification of single storey with RCC framed construction of 4.2m height complete all as specified and as shown on drawings. | 1 | EACH BLOCK | 27,88,500 ₹27,88,500 | 23,25,000 ₹23,25,000 | 21,80,000 ₹21,80,000 Lowest |
| 1.02 | Lumpsum price worked out by the contractor for Provision of underground sump 110000 ltrs capacity with RCC M-30 grade concrete and TMT steel reinforcement including all necessary excavation, levelling concrete, formwork, making good the surface after returning filling and removal of all debris out side MD land, testing of water tightness and making good any leakage seepage observed, waterproofing of wall and bottom surface complete all as specified and as shown on drawings. | 1 | EACH JOB | 32,50,000 ₹32,50,000 | 24,60,000 ₹24,60,000 | 24,20,000 ₹24,20,000 Lowest |
| 2.00 | Lump sum price worked out by the Contractor for “EARTH WORK" as listed in Schedule ‘A’ Part - II representing ___________% _________________ percent Above / Below the lump sum price of `36,397.00 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 51,500 ₹51,500 | 45,000 ₹45,000 | 27,600 ₹27,600 Lowest |
| 3.00 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - III representing __________ % ______________________ percent Above / Below the lump sum price of `26,154.49 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 30,000 ₹30,000 | 32,500 ₹32,500 | 13,550 ₹13,550 Lowest |
| 4.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - IV representing ___________% __________________ percent Above / Below the lump sum price of ₹59,828.00 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 54,000 ₹54,000 | 60,000 ₹60,000 | 47,170 ₹47,170 Lowest |
| 5.00 | Lump sum price worked out by the Contractor for “ROAD / PATH / CULVERT / HARDSTANDING” as listed in Schedule ‘A’ Part-V representing _________ % ________________ percent Above / Below the lump sum price of `2,47,980.00 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 2,65,000 ₹2,65,000 Lowest | 3,20,000 ₹3,20,000 | 2,67,000 ₹2,67,000 |
| 6.00 | Lump sum price worked out by the Contractor for “FIRE FIGHTING” as listed in Schedule ‘A’ Part - VI representing ____% ____________ percent Above / Below the lump sum price of ₹79,59,193.25 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 89,20,300 ₹89,20,300 | 83,50,000 ₹83,50,000 Lowest | 85,17,605 ₹85,17,605 |
| 7.00 | Lump sum price worked out by the Contractor for “FIRE ALARM SYSTEM” as listed in Schedule ‘A’ Part - VII representing ________ % ____________ percent Above / Below the lump sum price of ₹40,50,865.00 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 45,32,000 ₹45,32,000 | 39,60,000 ₹39,60,000 | 33,17,363 ₹33,17,363 Lowest |
| 8.00Schedule 'A' Part-VIII This Schedule is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. This Schedule constitutes Sl. Item Nos. 9.00 to 56.00. | ||||||
Tender Value
₹2.8 Cr
EMD Value
₹3.5 L
Closing Date
27 Jun 2025, 6:00 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD PICKET OPP JUBILEE BUS STATION SECUNDERABAD 500003
PROVISION UPGRADATION FOR FIRE SAFETY SERVICES OF OLD HANGAR (BLDG No. P-17), LIGHTNING TEST FACILITY HANGAR (BLDG No. P-19), AVIONICS (BLDG No. P-36), AEW AND C BUILDING (BLDG No. P-67) AND STIR BUILDING (BLDG No. P-1) AT CABS, BANGALORE
2025_MES_707496_1
82666
Open Tender
Civil Works
Lump-sum
365 days
BANGALORE
Class B
category a(i) and c(vi)
8 documents required · 8 mandatory
₹2,000
GARRISON ENGINEER I RND EAST BANGALORE
₹3.5 L
Yes
24 Oct 2025
14 May 2025
30 Jun 2025
14 May 2025
27 Jun 2025
13 Jun 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .