| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC | ₹4.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.4 CrRejected-Finance | ₹5.4 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MADAN CONSTRUCTION COMPANY | M/S SURESH CHANDRA GUPTA |
|---|---|---|---|---|---|
| 1.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 130 | cum | 2,51,290 ₹2.5 L | 2,86,362.7 ₹2.9 L |
| 2.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405. | 117.08 | cum | 2,42,238.52 ₹2.4 L | 2,75,999.71 ₹2.8 L |
| 3.00 | Providing and applying tack coat with VG-10 using bitumen pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H Clause 503
Unit - Cum, Taking Output = 7000 sqm. | 5,220 | sqm | 36,540 ₹36,540 | 45,100.8 ₹45,100.80 |
| 4.00 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller, finished to required level and grades. | 5,220 | sqm | 5,48,100 ₹5.5 L | 6,26,556.6 ₹6.3 L |
| 5.00 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coats | 5,220 | sqm | 1,98,360 ₹2.0 L | 2,29,888.8 ₹2.3 L |
| 6.00 | Construction of Zig Zag Interlocking Tile of thickess 60mm (Grade M-30) including all items as per Guidelines IRC SP: 63-2018 | 3,480 | sqm | 38,14,080 ₹38.1 L | 43,48,190.4 ₹43.5 L |
| 7.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 234 | cum | 12,58,686 ₹12.6 L | 14,34,214.08 ₹14.3 L |
| 8.00 | Construction of RCC Retaining Wall (4.00M height)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | 2,032.94 | cum | 8,63,999.5 ₹8.6 L | 9,84,796.79 ₹9.8 L |
| 9.00 | Sand filling in plinth including supply of necessary quantity of sand the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) | 405.69 | cum | 3,32,665.8 ₹3.3 L | 3,79,389.12 ₹3.8 L |
| 10.00 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 366.75 | cum | 12,80,691 ₹12.8 L | 14,59,301.92 ₹14.6 L |
Tender Value
₹6 Cr
EMD Value
₹12 L
Closing Date
17 Dec 2025, 12:00 pmClosed
SE BANDA CIRCLE PWD BANDA
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
WIDENING AND STRENGTHENING OF KILA KALINJAR ROAD AT KM 1 AND 2 OF NEEL KANTHESHWAR TEMPLE UNDER THE DHARAMARTH SCHEME IN BANDA DISTRICT
2025_CEBAN_1098288_1
4616/35 C - Banda Circle/2025-26 Dt. 07-11-2025.
Open Tender
Civil Works
365 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,260
Yes
₹12 L
Yes
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
25 Feb 2026
11 Dec 2025
17 Dec 2025
11 Dec 2025
17 Dec 2025
11 Dec 2025
15 Dec 2025
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405.
Providing and applying tack coat with VG-10 using bitumen pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H Clause 503 Unit - Cum, Taking Output = 7000 sqm.
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller, finished to required level and grades.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coats
Construction of Zig Zag Interlocking Tile of thickess 60mm (Grade M-30) including all items as per Guidelines IRC SP: 63-2018
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of RCC Retaining Wall (4.00M height) Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Sand filling in plinth including supply of necessary quantity of sand the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Furnishing and Placing Reinforced/ Prestressed cement concrete in M25 sub-structure as per drawing and Technical Specification.
Furnishing and Placing Reinforced/ Prestressed cement concrete in M25 super-structure as per drawing and Technical Specification.
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Construction of KC Drain Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Providing and laying of sand including cost of material, labour, water charges and T&P etc. required for proper completion of work as per S.I. No. 255
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Class-150 brick work in 1 : 4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour, curing and T&P etc. required for proper completion of the work.
12 mm thick plaster in 1 : 4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour, curing and T&P etc. required for proper completion of the work.
Concrete with 20 mm gauge stone grit, coarse sand and cement in proportion of 1 : 2 : 4 in foundation and under floors, including supply of all materials, labour T & P etc required for proper completion of the work.
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810
Wedining of RCC Slab 1M Span Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for p
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 Using Batching Plant, transit Mixer and Manual placing (For Slab and Approach Slab)
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Cement concrete with 20mm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per S.I. 279(a).
Raised cement pointing with 1:2 cement, fine sand mortar including supply of all materials, labour and tools and plants etc. Required for proper completion of the work.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 617. 709, 1204.3.7
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Providing and laying of hot appiled thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35 The finished surface to be level, uniform and free from streak and holes
Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification. Stop Sign Board
Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification.Speed Limit
Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification.Double Chevron
Supply and erection of direction and place identification retro reflctorised sign as per IRC 67 made of high intensity grade sheeting vede clause 801.30, fixed over aluminium sheeting, 2 mm. thick steel single angle iron post 75 x 75 x 6 mm. firmly fixed to the ground by means of properly designed fondation with M-15 grade cement concrete 45 x45 x 60 mm. 60 cm. below ground level as per approved drawing (informatry Borad of Size less than .9 SQM)
Supply and erection of direction and place identification retro reflctorised sign as per IRC 67 made of high intensity grade sheeting vede clause 801.30, fixed over aluminium sheeting, 2 mm. thick steel single angle iron post 75 x 75 x 6 mm. firmly fixed to the ground by means of properly designed fondation with M-15 grade cement concrete 45 x45 x 60 mm. 60 cm. below ground level as per approved drawing (informatry Borad of Size more than .9 SQM)
Supply and Fixing of 3M/Brand Makers Series 200 (Cat Eyes) body made of Polycarbonate with electronically welded prismatic retro reflective lance on both side for maximum retro reflection in wet & dry conditions with 3M bitumen adhesive B.T. 69. (with Shank)
Providing, Fixing & Hoisting complete in position of welded built up Structure of MS Pipe medium for Single Pipe Over Head Signage comprising of vertical posts 6 Mtr. Ht. from top of the R.C.C. foundation made of 300 mm. dia. Pipe (single pole) 10 mm. MS Plate at top & bottom for bearing & horizontal frame 32 mm. N.B. (M) main Pipes & 25 mm. N.B. (M) bracing except at junctions & comers as per drawing with one cat of steel primer & two coat of synthetic enamel paint including excavation lean concrete 1:4:8 with cement coarse and approved 20 mm. grit & R.C.C. 1:2:4 as per drawing enclosed.
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick as per MORT&H specification.
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms, making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways, maintennance of guard rails and parapet.maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23- 1099/113/2023 dated 16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt Maintence of 1st year after completion of work @Zero % of total cost of work (Item No 01 to 42)
Maintenance cost for 2nd year @ 0.25% cost of Work (Item No 01 to 42)
Maintenance cost for 3rd year @ 0.50% cost of Work (Item No 01 to 42)
Maintenance cost for 4th year @ 0.75% cost of Work (Item No 01 to 42)
Maintenance cost for 5th year @ 1.00% cost of Work (Item No 01 to 42)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.86 MB
Tendernotice_2.pdf
PDF • 1.55 MB
Tendernotice_3.pdf
PDF • 0.16 MB
BOQ_2022900.xls
BOQ • 0.40 MB
SBD1.pdf
Tender Documents • 5.73 MB
Download all tender documents and submit your bid