Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-AOC | L1 | Accepted-AOC AGG WITH L1 | |
| 2 | L2₹33.3 L+₹3.8 L (13.1%)Rejected-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L2 | Rejected-AOC AGG WITH L1 | |
| 3 | L3₹33.3 L+₹3.9 L (13.3%)Rejected-AOC GRAM SAIDPUR KHURD TIKOLI DISTRICT BAGHPAT UTTAR PRADESH PIN CODE 250001 | BAGHPAT | BAGHPAT | UTTAR PRADESH | 250001 | L3 | Rejected-AOC AGG WITH L1 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SUDHIR KUMAR CONTRACTOR L3 | MANOJ CHAUDHARY L2 | BALAJI TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation in foundation with disposal i/c lift upto 1.50 m and lead upto 30 m. labour, T&P etc. complete as per direction of Engineer in charge. | 852.97 | Cum | 100 ₹85,296.79 | 94 ₹80,178.98 | 90 ₹76,767.11 Lowest |
| 2.00 | Providing / Laying P. C.C. 1:3:6 nominal mix with cement : coarse sand : 20mm crushed stone ballast i/c cost of all Labour,material,T&P etc complete | 166.8 | Cum | 5,084 ₹8,48,007.77 | 5,083 ₹8,47,840.97 | 4,700 ₹7,83,956.83 Lowest |
| 3.00 | Providing 230 MM Thick Brick work with M-150 bricks in 1:4 C.M.with cement : coarse sand including cost of all material,labour & T&P etc.required for proper completion of work | 123.42 | Cum | 5,560 ₹6,86,216.74 | 5,559 ₹6,86,093.32 | 5,400 ₹6,66,469.5 Lowest |
| 4.00 | Supplying, filling & Laying Local sand including cost of all material, labour & T&P etc.required for proper completion of work | 206.82 | Cum | 325 ₹67,216.4 | 325 ₹67,216.4 | 280 ₹57,909.52 Lowest |
| 5.00 | Supply & Laying 200 Micron LDPE Film below 100mm thick C.C.1:2:4 | 2,411.5 | Sqm | 55 ₹1,32,632.5 | 55 ₹1,32,632.5 | 50 ₹1,20,575 Lowest |
| 6.00 | Providing & fixing Centering & shuttering for C.C.work | 177.34 | Sqm | 575 ₹1,01,973.37 | 575 ₹1,01,973.37 | 500 ₹88,672.5 Lowest |
| 7.00 | Providing & Laying 75mm thick C.C.linning in M-15(1:2:4),including cost of all material,labour & T&P etc.required for proper completion of work | 2,411.5 | Sqm | 547 ₹13,19,090.5 | 547.45 ₹13,20,175.68 | 447 ₹10,77,940.5 Lowest |
| 8.00 | Supplying/Fixing 10mm thick thermocol sheet in expansion joints i/c cost of all Labour,material,T&P etc.required for proper completion of work | 177.34 | Sqm | 98 ₹17,379.81 | 90 ₹15,961.05 Lowest | 95 ₹16,847.77 |
| 9.00 | Supplying & Filling 10 mm wide expansion joints with bituminous fillar after removel of thermocol sheet at site i/c cost of all Labour,material,T&P etc.required for proper completion of work. | 1,664.6 | Rm | 44 ₹73,242.4 | 44 ₹73,242.4 | 31 ₹51,602.6 Lowest |
Tender Value
₹33.3 L
EMD Value
₹66,660
Closing Date
30 Sept 2025, 2:00 pmClosed
EE MDGC MUZAFFARNAGAR
executive engineer muzaffarnagar division ganga canal muzaffarnagar
Cement Concrete Lining of internal section between km 21.800 to km 22.300 of Bastam Dy
2025_UPIDC_1076566_23
TN-04/EE/2025-26
Open Tender
Civil Works
Piece-work
60 days
Muzaffarnagar
as per tender notice
3 documents required · 3 mandatory
₹854
₹66,660
10 Jun 2026
24 Sept 2025
30 Sept 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
Amount
Earth Work in excavation in foundation with disposal i/c lift upto 1.50 m and lead upto 30 m. labour, T&P etc. complete as per direction of Engineer in charge.
Providing / Laying P. C.C. 1:3:6 nominal mix with cement : coarse sand : 20mm crushed stone ballast i/c cost of all Labour,material,T&P etc complete
Providing 230 MM Thick Brick work with M-150 bricks in 1:4 C.M.with cement : coarse sand including cost of all material,labour & T&P etc.required for proper completion of work
Supplying, filling & Laying Local sand including cost of all material, labour & T&P etc.required for proper completion of work
Supply & Laying 200 Micron LDPE Film below 100mm thick C.C.1:2:4
Providing & fixing Centering & shuttering for C.C.work
Providing & Laying 75mm thick C.C.linning in M-15(1:2:4),including cost of all material,labour & T&P etc.required for proper completion of work
Supplying/Fixing 10mm thick thermocol sheet in expansion joints i/c cost of all Labour,material,T&P etc.required for proper completion of work
Supplying & Filling 10 mm wide expansion joints with bituminous fillar after removel of thermocol sheet at site i/c cost of all Labour,material,T&P etc.required for proper completion of work.
MANOJ CHAUDHARY (BID ID -5573116)
M/S SUDHIR KUMAR CONTRACTOR (BID ID -5573382)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .