Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.4 LAdmitted-Finance | -41.26% | ₹19.4 L | L1 | Admitted-Finance |
| 2 | L2₹20.2 L+₹81,510.73 (4.20%)Admitted-Finance | -38.79% | ₹20.2 L+₹81,510.73 (4.20%) | L2 | Admitted-Finance |
| 3 | L3₹21.0 L+₹1.6 L (8.34%)Admitted-Finance | -36.36% | ₹21.0 L+₹1.6 L (8.34%) | L3 | Admitted-Finance |
| 4 | L4₹21.1 L+₹1.7 L (8.95%)Admitted-Finance | -36.00% | ₹21.1 L+₹1.7 L (8.95%) | L4 | Admitted-Finance |
| 5 | L5₹23.0 L+₹3.6 L (18.7%)Admitted-Finance | -30.30% | ₹23.0 L+₹3.6 L (18.7%) | L5 | Admitted-Finance |
Tender Value
₹33 L
EMD Value
₹66,000
Closing Date
12 Aug 2026, 4:00 pmClosed
Executive Engineer JKTDC
Executive Engineer JKTDC, TRC Srinagar
Providing fixing of fencing around the Huts and allied works at T C Batote
2026_Tourm_318986_2
E NIT No 7 of 2026-27
Open Tender
Civil Works
Percentage
365 days
TRC SRINAGAR
Providing fixing of fencing around the Huts and allied works at T C Batote
3 documents required · 3 mandatory
₹3,300
FA and CAO JKTDC
₹66,000
24 Aug 2026
1 Aug 2026
14 Aug 2026
2 Aug 2026
12 Aug 2026
2 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual/mechanical means in tranches, foundation, drains not execding 1:5 mtr in width as well as 10 sqm on plan including dressing of sides and draining of bottom. | 56.64 | cum | 592.9 | ₹33,581.86 |
| 2 | Providing and Laying of cement concrete in 1:2:4 mix 20 mm nominal size excluding cost of shuttering. | 109.74 | cum | 8,422.45 | ₹9,24,279.66 |
| 3 | Providing and Laying of cement concrete in 1:4:8 mix 40 mm nominal size excluding cost of shuttering. | 14.16 | cum | 5,202.9 | ₹73,673.06 |
| 4 | Structural steel work in single section fixed with or without connecting plate, including cutting, hoisting fixing in position and applying priming coats of approved steel premier. | 8,581.61 | Kg | 125 | ₹10,72,701.25 |
| 5 | Providing and fixing of G-I chainlink fencing including cost of welding, nut and bolt complete. | 669.14 | sqm | 929.35 | ₹6,21,865.26 |
| 6 | Painting with synethic enamal paint of approval brand and manufacture on steel surface including priming coats. | 1,418.28 | sqm | 150 | ₹2,12,742 |
| 7 | Cutting of bushes, vegetation to clean the site for execution of work. a) Engaged Labour | 30 | nos | 700 | ₹21,000 |
| 8 | Centering nad shuttering icluding strutting, propping etc and removal of form for foundations footings base of columns etc for mass concrete walls ( of any thichness) | 325.27 | sqm | 628.95 | ₹2,04,578.57 |
| 9 | 15 mm thick cement plaster in 1:4 mix including curring all complete. | 325.27 | sqm | 400 | ₹1,30,108 |
| 10 | Disposal of malba by mechanical transport including loading and un loading complete beyond Munciple limit. | 5.5 | cum | 1,000 | ₹5,500 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.51 MB
BOQ_1054232.xls
BOQ • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .