Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63.0 LAdmitted-Finance BEHIND OF PAWAN TALKIES ROAD KORBA CG 495678 | 495678 | -34.24% | ₹63.0 L | L1 | Admitted-Finance |
| 2 | L2₹68.5 L+₹5.5 L (8.68%)Admitted-Finance INDUSTRIAL AREA WARD NO 15 INDIRA NAGAR KATGHORA KORBA CHHATTISHGARH 495445 | KATGHORA | KORBA | CHHATTISGARH | 495445 | -28.53% | ₹68.5 L+₹5.5 L (8.68%) | L2 | Admitted-Finance |
| 3 | L3₹88.1 L+₹25.1 L (39.9%)Admitted-Finance AT SAMALEI VIHAR PANCHGACHHIA PO BARAIPAH | -8.00% | ₹88.1 L+₹25.1 L (39.9%) | L3 | Admitted-Finance |
Tender Value
₹95.8 L
EMD Value
₹1.2 L
Closing Date
10 Jun 2026, 5:00 pmClosed
Staff Officer (Civil), SECL, Gevra Area
Office of the Staff Officer(Civil) , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 6232015388
Various Development works such as Construction of shed, Additional Room, CC Floor, Toilet and Bathroom at Community Building of Vijay Nagar (Binjhara), Gram Panchayat - Dhurena, Block - Katghora, Korba under CSR Head of SECL Gevra Area.
2026_SECL_359936_1
SECL/GA/SO(C)/ETN/26-27/04 dtd. 20.05.2026
Open Tender
Civil Works - Others
Percentage
120 days
GEVRA AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.2 L
31 Jul 2026
21 May 2026
12 Jun 2026
21 May 2026
10 Jun 2026
22 May 2026
21 May 2026 - 30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART (A) CONSTRUCTION OF ADDITIONAL ROOM, TOILET, BATHROOM & COMPOUND WALL | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 270 | cum | 187.35 | ₹50,584.5 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) | 39 | cum | 5,046.15 | ₹1,96,799.85 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 60 | cum | 6,602.2 | ₹3,96,132 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 9.8 | cum | 7,717.7 | ₹75,633.46 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 21.2 | cum | 8,102.65 | ₹1,71,776.18 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars | 8,190 | kg | 89.75 | ₹7,35,052.5 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 145 | sqm | 273.6 | ₹39,672 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers | 187 | sqm | 499.45 | ₹93,397.15 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts | 170 | sqm | 649.85 | ₹1,10,474.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.99 MB
Tendernotice_2.pdf
PDF • 0.71 MB
Tendernotice_3.pdf
PDF • 1.37 MB
BOQ_372808.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .