87748 Repair and maint to central AC plant to certain storage accn at INS Rajali Arakkonam
2026_MES_787798_1
CWE/NAVY/ARK/87748/E8 OF 2026-27
Open Tender
Miscellaneous Works
Item Rate
180 days
ARAKKONAM
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (M) NAS Arakkonam
₹78,000
Yes
3 Sept 2026
3 Sept 2026
26 Sept 2026
3 Sept 2026
24 Sept 2026
17 Sept 2026
3 Sept 2026 - 10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material & Labour for leak test and gas charging by vacuumising complete system of Central type AC plant of the following capacity with double stage vacuum pump of (-) 2 Kg/sqcm vacuum pressure after repairs to compressor or refrigeration System, Charging the Dry nitrogen gas & holding up to 24 hrs and rectifying the leakage if any by bracing/welding/ replacing the "O" ring & Gland packing of service valve including Topping up the compressor oil and charging the refrigerant gas up to desired pressure all as specified , instructed & directed. Note :- i) Once the gas is charged in system, it should hold in the system for minimum six months, if any gas gets leaked from the system the contractor has to charge the gas upto required level free of cost and No extra cost on this account shall be claimed. ii) Compressor oil and Refrigerant gas shall be measured and paid separately under relevant item as supply only. iii) Labour charge for replacement of compressor oil and refrigerant gas is deemed to be included in the quoted rate. iv) Leakage test on each compressor of complete unit shall be considered as one job. | |||||
| 1.01 | Leakage testing and gas charging of Central AC Plant Screw Compressor unit of capacity 110 TR | 3 | Each job | - | - |
| 1.02 | Leakage testing and gas charging of Central AC Plant scroll Compressor unit of capacity 12.5 TR | 9 | Each job | - | - |
| 2Material & Labour for Descaling the Condenser unit of Central type AC plant of following capacity full system by circulating and descaling chemical with water (madeup ph value of circulating water should be 01) through cooling tower , re-circulating pump set up to 2 to 3 hours and open the end cover of condenser and manually cleaning the inner tubes with nylon brush until complete scale gets removed and flush out with fresh water. Reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower,make up water tank etc as required including commissioning in all respect complete all as directed. Note :- (i) Descaling to be carried out 3 times in the entire contract period and Each job shall be measured and paid separately. (ii) During descaling if any damage happens to copper coil which leads to leakage of gas, contractor shall be responsible to rectify the damage and gas to be filled after leak test without any extra cost (iii) Full system includes total number of condensers in the mentioned capacity of AC Plant (iv) Pressure difference between inlet and outlet of condenser unit shall be reduced to preferred level given by manufacturer after descaling. | |||||
| 2.01 | Central AC plant of capacity 110 TR full system | 9 | Each job | - | - |
| 2.02 | Central AC plant of capacity 38 TR full system | 9 | Each job | - | - |
| 2.03 | Central AC plant of capacity 25 TR full system | 9 | Each job | - | - |
| 3Material & Labour for Descaling the chiller units of Central type AC plant of following capacity full system by circulating, descaling chemical with water (madeup ph value of circulating water shall be 01) through cooling tower re-circulating pump set up to 2 to 3 hours complete all as directed. Note :- (i) Descaling to be carried out twice in the entire contract period and Each job will be measured and paid separately. | |||||
| 3.01 | Central AC plant of capacity 110 TR full system | 6 | Each job | - | - |
| 3.02 | Central AC plant of capacity 38 TR full system | 6 | Each job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
87748GENERALPAGES.pdf
Tender Documents • 0.51 MB
BOQ_882957.xls
BOQ • 0.66 MB
87748PS.pdf
Additional Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .