Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91,384.86Admitted-Finance | ₹91,384.86 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.Vasudevan Contractor L1 |
|---|---|---|---|---|
| 1.00 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to Kilpallipet section work spot upto 8 kms | 7 | Per Pole | 2,300 ₹16,100 Lowest |
| 2.00 | Excavation and erection and fixing of line metarials of 8.0m pole | 1 | Per Pole | 1,350 ₹1,350 Lowest |
| 3.00 | Excavation and erection and fixing of line materials of 9.0m pole | 6 | Per Pole | 1,700 ₹10,200 Lowest |
| 4.00 | Excavation, erection of stay set complete for HT/LT pole | 10 | each | 1,000 ₹10,000 Lowest |
| 5.00 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.66 | Per Km | 2,300 ₹1,527.2 Lowest |
| 6.00 | Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.72 | Per Km | 2,800 ₹2,007.6 Lowest |
| 7.00 | Fixing of v x arm and HT TI Fitting | 1 | each | 270 ₹270 Lowest |
| 8.00 | Fixing of 3 Phase cross arm with line materials | 11 | each | 240 ₹2,640 Lowest |
| 9.00 | Erection of 11 KV single pole Structure including erection of DT complete with centre support excluding fixing of MCD Box | 1 | per stru | 12,310 ₹12,310 Lowest |
| 10.00 | Loading and unloading of 100 KVA DT at old site and new site respectively | 2 | each | 3,300 ₹6,600 Lowest |
Tender Value
Refer Docs
Closing Date
28 Jul 2026, 2:00 pmClosed
EE Vellore
gandhi nagar Katpadi
Works Contract for Extension of supply works in HTLT feeders for erection poles transporting of poles paving HTLT Line in various work orders in respect of Assistant Engineer O M Kilpallipet section
2026_EB_686009_1
EEVLR007
Limited
Electrical Works
Works
180 days
Kilpallipet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
1 Aug 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to Kilpallipet section work spot upto 8 kms | 7 | Per Pole | - | - |
| 2 | Excavation and erection and fixing of line metarials of 8.0m pole | 1 | Per Pole | - | - |
| 3 | Excavation and erection and fixing of line materials of 9.0m pole | 6 | Per Pole | - | - |
| 4 | Excavation, erection of stay set complete for HT/LT pole | 10 | each | - | - |
| 5 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.66 | Per Km | - | - |
| 6 | Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.72 | Per Km | - | - |
| 7 | Fixing of v x arm and HT TI Fitting | 1 | each | - | - |
| 8 | Fixing of 3 Phase cross arm with line materials | 11 | each | - | - |
| 9 | Erection of 11 KV single pole Structure including erection of DT complete with centre support excluding fixing of MCD Box | 1 | per stru | - | - |
| 10 | Loading and unloading of 100 KVA DT at old site and new site respectively | 2 | each | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_824613.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].