Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.2 LAdmitted-Finance | -28.99% | ₹38.2 L | L1 | Admitted-Finance |
| 2 | L2₹40.7 L+₹2.6 L (6.69%)Admitted-Finance | -24.24% | ₹40.7 L+₹2.6 L (6.69%) | L2 | Admitted-Finance |
| 3 | L3₹41.9 L+₹3.7 L (9.82%)Admitted-Finance RZ GM 24 GALI NO 9 RAJ NAGAR II PALAM COLONY RAJ NAGAR PALAM COLONY SOUTH WEST DELHI DELHI 110077 | SOUTH WEST DELHI | DELHI | 110077 | -22.02% | ₹41.9 L+₹3.7 L (9.82%) | L3 | Admitted-Finance |
| 4 | L4₹42.5 L+₹4.3 L (11.2%)Admitted-Finance | -21.01% | ₹42.5 L+₹4.3 L (11.2%) | L4 | Admitted-Finance |
| 5 | L5₹47.9 L+₹9.7 L (25.3%)Admitted-Finance | -10.99% | ₹47.9 L+₹9.7 L (25.3%) | L5 | Admitted-Finance |
Tender Value
₹53.8 L
EMD Value
₹1.1 L
Closing Date
14 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER CD IV
EE CD IV IFC LM BUND OFFICE COMPLEX SHASHTRI NAGAR
Providing and Fixing of Structural Steel Framed Protective Mesh over biharipur Drain for Prevention of Dumping of Malba and Municipal Solid Waste (MSW) from RD Om to RD 650m in district North-East.
2026_IFC_297986_1
66/EE/CD-IV/IFC/2026-27
Open Tender
Civil Works
Works
150 days
EAST
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.1 L
14 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 20 | Cum. | 3,559.05 | ₹71,181 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 40 | Cum. | 2,064.7 | ₹82,588 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 24 | Cum | 6,826.9 | ₹1,63,845.6 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 598 | Sqm | 393 | ₹2,35,014 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 46 | Cum | 8,359.1 | ₹3,84,518.6 |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes. | 9,236 | Kg | 194.85 | ₹17,99,634.6 |
| 7 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade. | 1,625 | Sqm | 1,069.45 | ₹17,37,856.25 |
| 8 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix). | 0.3 | Cum | 2,439.6 | ₹731.88 |
| 9 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil. | 4 | Each | 82.65 | ₹330.6 |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 2,900 | kg | 173 | ₹5,01,700 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
66tenderdocs.pdf
Tender Documents • 0.63 MB
BOQ_397215.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .