Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹5.1 Cr
EMD Value
₹10.3 L
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
S.E.Drainage Circle. Aligarh
Office Of S.E.Drainage Circle. Aligarh
Construction of New V.R.B. at Km. 9.300, Km. 11.100 and Km. 13.500 and Re-Construction of V.R.B. at Km. 26.900 and Km. 13.800 on Etawah Stump
2026_UPIDC_1173124_1
10/SE/DCA/2026-27
Open Tender
Civil Works - Canal
Item Wise
180 days
FIROZABAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,944
₹10.3 L
Office Of S.E.Drainage Circle. Aligarh
10 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone work or brick work and cement concrete in cementmortar stacking of material with in a distance of 60m as per direction of Engineer in charge. | 60 | cum | - | - |
| 2 | Earthwork in filling/strengthening of damage bank and weaker section of canal in ordinary soil, excavation earthwork in embankment to be in 20cm layer including ramming and dressing the surface to required levels, slopes and also including lift upto 1.5m and lead upto 1.00 km with transported earth by manual labour and machine excluding GST. | 8,346.75 | cum | - | - |
| 3 | Earthwork in foundation in dry ordinary soil including lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30m from the foundation trenches for other structure. | 8,618 | cum | - | - |
| 4 | Providing concrete for plain concrete M 10 grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete, including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 462.48 | cum | - | - |
| 5 | Providing concrete for plain concrete M 15 grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 381.48 | cum | - | - |
| 6 | Providing concrete for Reinforced cement concrete M20 grade in foundations including cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 1,001.54 | cum | - | - |
| 7 | Providing Reinforced cement concreteM25 design mix grade in foundations including cost of finishing and excluding reinforcement in 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST. | 1,063.79 | cum | - | - |
| 8 | Providing concrete for reinforced concrete M 25 grade in open foundations using 20-10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing complete as per drawings and technical specifications ,including overhead charges & Contractors profit but excluding GST. | - | cum | - | - |
| 9 | Centering And Shuttering For special type of rcc work such as curves, T-beams, bridges and syphon,aqueduct box culvert etc including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc | - | sqm | - | - |
| 10 | Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc | 235.08 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tendernotice_2.pdf
PDF • 1.86 MB
BOQ_2203010.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .