| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 LAccepted-AOC | ₹24.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.1 LRejected-Finance | ₹24.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹25.2 LRejected-Finance | ₹25.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹31.8 LRejected-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹31.8 L | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical P NO 94 AGS NAGAR ZAMIN PALLAVARAM CHENNAI 600 117 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600117 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L4 | KIRUSHIYAA CONSTRUCTION L1 | KSM CONSTRUCTION L2 | SCAN CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 194.65 | M3 | 250 ₹48,662.50 | 125 ₹24,331.25 | 95 ₹18,491.75 | 90 ₹17,518.50 |
| 2.00 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Soft Disintegrated Rock not requiring blasting including cost of all materials lead lift etc complete | 11.45 | M3 | 250 ₹2,862.50 | 250 ₹2,862.50 | 100 ₹1,145 | 120 ₹1,374 |
| 3.00 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Medium rock dense medium rock not requiring blasting including cost of all materials lead lift etc complete as directed by the department engineer at site. | 11.45 | M3 | 250 ₹2,862.50 | 300 ₹3,435 | 100 ₹1,145 | 250 ₹2,862.50 |
| 4.00 | Removing Hard rock by wedging, chiseling and trimming to proper shap where blasting is prohibited, including the cost of all materials lead lift etc complete as directed by the department engineer at site. | 11.45 | M3 | 300 ₹3,435 | 2,500 ₹28,625 | 100 ₹1,145 | 1,000 ₹11,450 |
| 5.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed and watered consolidated etc complee as per standard specification. | 13.83 | M3 | 2,000 ₹27,660 | 800 ₹11,064 | 1,800 ₹24,894 | 1,000 ₹13,830 |
| 6.00 | Transporting the Surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance, loading, unloading etc.,complete as per standerd specification and as directed by the department at site. | 10 | M3 | 100 ₹1,000 | 980 ₹9,800 | 20 ₹200 | 100 ₹1,000 |
| 7.00 | Re filling in foundation with excavated earth in layers not more than 15cm thick well rammed and watered consolidated etc complete as per standard specification. | 10 | M3 | 100 ₹1,000 | 1,200 ₹12,000 | 20 ₹200 | 46 ₹460 |
| 8.00 | Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 13.83 | M3 | 8,000 ₹1.1 L | 4,500 ₹62,235 | 6,300 ₹87,129 | 6,000 ₹82,980 |
| 9.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work | 25 | M3 | 9,000 ₹2.3 L | 6,000 ₹1.5 L | 7,300 ₹1.8 L | 7,500 ₹1.9 L |
| 10.00 | Providing and laying P:C:C 1:2:4 using 20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 122 | M3 | 8,000 ₹9.8 L | 5,500 ₹6.7 L | 6,000 ₹7.3 L | 6,500 ₹7.9 L |
Tender Value
₹32.3 L
EMD Value
₹32,300
Closing Date
4 Mar 2026, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2026_EB_665564_1
OT-043/25-26 of SE/GCC-I/CNI
Open Tender
Civil Works
120 days
Chendur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹32,300
Yes
2 Jun 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Soft Disintegrated Rock not requiring blasting including cost of all materials lead lift etc complete
Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Medium rock dense medium rock not requiring blasting including cost of all materials lead lift etc complete as directed by the department engineer at site.
Removing Hard rock by wedging, chiseling and trimming to proper shap where blasting is prohibited, including the cost of all materials lead lift etc complete as directed by the department engineer at site.
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed and watered consolidated etc complee as per standard specification.
Transporting the Surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance, loading, unloading etc.,complete as per standerd specification and as directed by the department at site.
Re filling in foundation with excavated earth in layers not more than 15cm thick well rammed and watered consolidated etc complete as per standard specification.
Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
R:C:C 1:1.5:3 using 12 to 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
Providing and laying P:C:C 1:2:4 using 20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P:C:C 1:2:4 using 20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
R.C.C. 1:1.5:3 using 12- 20mm metal with form work for Plinths, cable duct, cover slabs & Fire Protection wall using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 Kg per cu.m for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including from work, but excluding cost of steel reinforcement. (up to basement level RCC Wall)
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 Kg per cu.m for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including from work, but excluding cost of steel reinforcement. ( (Precast slab)
Supplying, fabrication and placing inposition of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in possition as per specification including cost of all materilas, lead, lift, labour, cost of binding wire etrc., complete as directed by the department engineer at site.
fabrication galvanising and supply of foundation boltand nuts with 2 nos. Washer in High Tensile steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour lead lift etc, complete as directed by the department engineer at site.
Providing grout holes for equipment at required position including cost of all materials, curing,labour, lead and lift etc., complete as directed by the department engineer at site.
Labour charges for assembling of template in correct position and alligenment for various equipment plinth and grouting the foundation bolt including cost of all material transport , labour,lead, lift etc, complete as directed by the dept. Engineer at site. (The templete will be make own arrangement by the contractor).
Supplying and providing 90 lbs rails in transformer plint and labour charges for fixing in correct position and aligenment as directed by dept.Engineer at site including cost of Rail, cutting charges , transport to site, labour, lead, lift etc. Complete as directed by the department engineer at site.
Plastering with CM 1:5, 20mm thick for out side wall including cost of materials all labour,curing, lead, lift etc., complete as directed by the department engineer at site.
Supplying and fixing Gun Metal wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete as per standard specification and as directed by the department Engineer at site. 32mm dia
Supplying and fixing Gun Metal wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete as per standard specification and as directed by the department Engineer at site. 25mm dia
Supplying and fixing Gun Metal wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete as per standard specification and as directed by the department Engineer at site. 20mm dia
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 32mm dia
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 25mm dia
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 20mm dia
Engaging JCB excavator for uprooting trees levelling approach road filling low lying areas on hourly basis including cost of all materials labour, lead & lift etc., complete.
Painting two coats with approved plastic Emlusion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceiing and other new surface and oncluding cleaning preparing the surface and curing etc, complete.
Labour charges for dismantling, clearing away and carefully stacking materials usefull for re-use of existing damaged PCC including the cost of all labour, transport, T&P, lead and lift etc., complete as directed by the department engineer at site.
Labour charges for dismantling of Reinforced Cement Concrete and disposing the debris away from the SS permises including all materials, labour, lead and lift etc., complete as directed by the department engineer at site.
Labour charges for dismantling, clearing away and carefully stacking materials usefull for re-use of existing damaged Brick work / stone Masonry including the cost of all labour, transport, T&P, lead and lift etc., complete as directed by the department engineer at site.
Providing and supplying for cutting M.S angle at size 50x50x6mm and MS channel to required length fixing in cable duct correct level to alignment complete as directed by the department engineer at site.
Filling with stone dust including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site.
Filling with 20 mm B.G metal including cost of all labour, materials, transport, leads, lift,etc., complete and as directed by the department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_799387.xls
BOQ • 0.30 MB
OT043.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid