| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC GRAM GANDHARIYA GAGRAJ POST CHHAPIYASIVBARAN DISTRICT BASTI | ₹5.9 L | L1 | Accepted-AOC AS PER UPLOAD |
| 2 | L2₹5.9 L+₹1,762.72 (0.30%)Rejected-Finance GRAM TINANHARI POST NATHNAGAR THANA MAHULI DISTRICT SANT KABIR NAGAR | AMROHA | UTTAR PRADESH | 244102 | ₹5.9 L+₹1,762.72 (0.30%) | L2 | Rejected-Finance AS PER UPLOAD |
| 3 | L3₹5.9 L+₹2,482.69 (0.42%)Rejected-Finance | ₹5.9 L+₹2,482.69 (0.42%) | L3 | Rejected-Finance AS PER UPLOAD |
| 4 | L4₹6.2 L+₹29,643.59 (5.05%)Rejected-Finance | ₹6.2 L+₹29,643.59 (5.05%) | L4 | Rejected-Finance AS PER UPLOAD |
| 5 | L5₹6.3 L+₹47,466.69 (8.08%)Rejected-Finance | ₹6.3 L+₹47,466.69 (8.08%) | L5 | Rejected-Finance AS PER UPLOAD |
| Sl No | Description | Qty | Unit | M/S SINGH CONSTRUCTION COMPANY L11 | M/S AMIT KUMAR SINGH L6 | M/S SHYAM CONSTRUCTION L7 | PARSHU RAM YADAV L3 | M/S ONKAR NATH DWIVEDI L10 | AMBEY TRADERS L5 | M/S SHIV SHAKTI CONSTRUCTION COMPANY L8 | M/S S S ENTERPRISES PRO. SURENDRA L9 | M/S OM SAI TRADERS L4 | SHIVANAND SHUKLA L2 | OM JI SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in making diversion ,Ramp & canal section in all type of soil ,all leads , lift ,labour T&P etc. | 456.76 | Cum | 80 ₹36,540.8 | 80 ₹36,540.8 | 70 ₹31,973.2 | 67.93 ₹31,027.71 | 50 ₹22,838 | 80 ₹36,540.8 | 30 ₹13,702.8 Lowest | 83.08 ₹37,947.16 | 71 ₹32,429.96 | 67.83 ₹30,982.03 | 67.63 ₹30,888.85 |
| 2.00 | Earth work in digging foundation in all type of soil and refilling of trenches, proper disposal of earth up to 30 mtr lead | 142.31 | Cum | 60 ₹8,538.6 | 60 ₹8,538.6 | 70 ₹9,961.7 | 67.93 ₹9,667.12 | 70 ₹9,961.7 | 91 ₹12,950.21 | 30 ₹4,269.3 Lowest | 83.08 ₹11,822.97 | 71 ₹10,104.01 | 67.83 ₹9,652.89 | 67.63 ₹9,623.86 |
| 3.00 | Cement concrete 1:3:6 in base for PCC work including stone ballast ,coarse sand & Cement including the cost of all material , labour T&P etc. including the cost of cement | 11.53 | Cum | 9,000 ₹1,03,770 | 5,000 ₹57,650 Lowest | 8,000 ₹92,240 | 7,387 ₹85,172.11 | 9,100 ₹1,04,923 | 8,400 ₹96,852 | 7,000 ₹80,710 | 9,034.43 ₹1,04,167.02 | 7,742 ₹89,265.26 | 7,376.27 ₹85,048.43 | 7,354.09 ₹84,792.63 |
| 4.00 | Ist class brick work in (1:4) cm with coarse sand & new bricks including the cost of all material , labour T&P etc. including the cost of cement | 51.51 | Cum | 7,100 ₹3,65,721 | 5,600 ₹2,88,456 | 6,100 ₹3,14,211 | 5,040 ₹2,59,610.4 | 6,500 ₹3,34,815 | 5,200 ₹2,67,852 | 6,300 ₹3,24,513 | 6,164.88 ₹3,17,552.81 | 5,282 ₹2,72,075.82 | 5,033.33 ₹2,59,266.58 | 5,018.18 ₹2,58,486.45 Lowest |
| 5.00 | Centring and shuttering for R.C.C work including cost of materials | 39.14 | Sqm | 460 ₹18,004.4 | 500 ₹19,570 | 250 ₹9,785 Lowest | 333 ₹13,033.62 | 410 ₹16,047.4 | 500 ₹19,570 | 400 ₹15,656 | 407.25 ₹15,939.76 | 349 ₹13,659.86 | 332.5 ₹13,014.05 | 331.5 ₹12,974.91 |
| 6.00 | Cutting, bending ,binding and placing or reinforcement including cost of binding wire, steel with labour T&P etc. | 0.57 | Cum | 66,000 ₹37,788.61 | 35,000 ₹20,039.42 Lowest | 40,000 ₹22,902.19 | 44,109 ₹25,254.82 | 59,500 ₹34,067.01 | 55,000 ₹31,490.51 | 65,000 ₹37,216.06 | 53,944.33 ₹30,886.09 | 46,228 ₹26,468.06 | 44,042.95 ₹25,217 | 43,910.49 ₹25,141.16 |
| 7.00 | Reinforced Cement concrete 1:1.5: 3 on slab including stone ballast ,coarse sand & cement including the cost of all material , labour T&P etc. including the cost of cement | 13.21 | Cum | 11,000 ₹1,45,310 | 10,500 ₹1,38,705 | 9,500 ₹1,25,495 | 8,376 ₹1,10,646.96 | 9,800 ₹1,29,458 | 8,500 ₹1,12,285 | 8,000 ₹1,05,680 Lowest | 10,244.88 ₹1,35,334.86 | 8,779 ₹1,15,970.59 | 8,364.46 ₹1,10,494.47 | 8,339.3 ₹1,10,162.15 |
| 8.00 | Cement pointing (1:2) (ruled or stuck )/ Sqm including coarse sand including the cost of cement | 132.19 | Sqm | 120 ₹15,862.8 | 178.95 ₹23,655.4 | 20 ₹2,643.8 Lowest | 119 ₹15,730.61 | 130 ₹17,184.7 | 146 ₹19,299.74 | 120 ₹15,862.8 | 144.98 ₹19,165.04 | 124 ₹16,391.56 | 119 ₹15,730.84 | 118.01 ₹15,600.27 |
| 9.00 | Dry brick on edge pitching including preparation of sub grade and filling joints local sand including cost of sand. | 70 | Sqm | 460 ₹32,200 | 360 ₹25,200 | 300 ₹21,000 Lowest | 322 ₹22,540 | 490 ₹34,300 | 350 ₹24,500 | 400 ₹28,000 | 394.31 ₹27,601.7 | 337 ₹23,590 | 321.94 ₹22,535.79 | 320.97 ₹22,467.9 |
| 10.00 | S/F sign board | 1 | Jobs | 5,000 ₹5,000 | 5,000 ₹5,000 | 5,000 ₹5,000 | 4,662 ₹4,662 | 6,500 ₹6,500 | 500 ₹500 Lowest | 3,000 ₹3,000 | 5,701.5 ₹5,701.5 | 4,886 ₹4,886 | 4,655 ₹4,655 | 4,641 ₹4,641 |
Tender Value
₹8.9 L
EMD Value
₹18,000
Closing Date
9 Dec 2025, 12:00 pmClosed
Executive Engineer Saryu Nahar Khand-4,Basti (U.
Executive Engineer Saryu Nahar Khand-4,Basti (U.
CONSTRUCTION OF VRB ON RAUNA DY AT. KM. 1.400
2025_UPIDC_1095670_15
05/EE/2025-26
Open Tender
Civil Works
Item Rate
60 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
₹18,000
18 May 2026
3 Dec 2025
9 Dec 2025
3 Dec 2025
9 Dec 2025
3 Dec 2025
Amount
E/W in making diversion ,Ramp & canal section in all type of soil ,all leads , lift ,labour T&P etc.
Earth work in digging foundation in all type of soil and refilling of trenches, proper disposal of earth up to 30 mtr lead
Cement concrete 1:3:6 in base for PCC work including stone ballast ,coarse sand & Cement including the cost of all material , labour T&P etc. including the cost of cement
Ist class brick work in (1:4) cm with coarse sand & new bricks including the cost of all material , labour T&P etc. including the cost of cement
Centring and shuttering for R.C.C work including cost of materials
Cutting, bending ,binding and placing or reinforcement including cost of binding wire, steel with labour T&P etc.
Reinforced Cement concrete 1:1.5: 3 on slab including stone ballast ,coarse sand & cement including the cost of all material , labour T&P etc. including the cost of cement
Cement pointing (1:2) (ruled or stuck )/ Sqm including coarse sand including the cost of cement
Dry brick on edge pitching including preparation of sub grade and filling joints local sand including cost of sand.
S/F sign board
S/Fixing joint filler board20 mm thick ( Therma coal) /Sqm
S/fixing of water spout /nos
Supply & fixing Wheel guards
For dismantling of diversion roads
Painting two coat parapet and wing wall
SHIVANAND SHUKLA (BID ID -5730630)
PARSHU RAM YADAV (BID ID -5730659)
M/S OM SAI TRADERS (BID ID -5730862)
AMBEY TRADERS (BID ID -5729981)
M/S AMIT KUMAR SINGH (BID ID -5730842)
M/S SHYAM CONSTRUCTION (BID ID -5726490)
M/S SHIV SHAKTI CONSTRUCTION COMPANY (BID ID -5727957)
M/S S S ENTERPRISES PRO. SURENDRA (BID ID -5730367)
M/S ONKAR NATH DWIVEDI (BID ID -5725112)
M/S SINGH CONSTRUCTION COMPANY (BID ID -5730294)
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_2015280.xls
BOQ • 0.22 MB
BID.pdf
Tender Documents • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .