| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.6 LAccepted-Finance | ₹53.6 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹55.1 LAccepted-Finance | ₹55.1 L | L2 | Accepted-Finance Admitted |
| 3 | L3₹57.3 LAccepted-Finance | ₹57.3 L | L3 | Accepted-Finance Admitted |
| 4 | L4₹58.0 LAccepted-Finance R O HOUSING COLONY LEH | LEH LADAKH | LADAKH | 194101 | ₹58.0 L | L4 | Accepted-Finance Admitted |
| 5 | L5₹63.2 LAccepted-Finance | ₹63.2 L | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M/S RIGZIN DAWA GOVT CONTRACTOR L3 | M/S CHEMAT GYATSO L5 | M/S PARVEZ AHMAD GOVT CONTRACTOR L1 | M/S RIGZEN PALJOR GOVT CONTRACTOR L2 | M/S SKALZANG DAWA L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of 143nos of crate bunds at Choglamsar II of Leh Forest Range. | ||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas exceeding 30cm in depth, 1.5 Mt in width as well as 10sqmt on plan including getting out and disposal of excavated earth lead up to 50mt. And lift up to 1.5 Mt as directed by the in charge. | 189.19 | cum | 350 ₹66,216.50 | 125 ₹23,648.75 | 190 ₹35,946.10 | 100 ₹18,919 | 100 ₹18,919 |
| 1.02 | Construction of Vertical bunds with slopping face by boulder filling (dry hand packed tightly) including the cost of stone but excluding the cost of crate wires. | 1,036 | cum | 1,650 ₹17.1 L | 1,870 ₹19.4 L | 1,500 ₹15.5 L | 1,500 ₹15.5 L | 1,500 ₹15.5 L |
| 1.03 | Making knitted crate wire of approved mesh-size, including weaving, binding sides and portions and binding top after filling, exclluding cost of filling stones and weaving materials. | 156.79 | sqm | 100 ₹15,679 | 350 ₹54,876.50 | 80 ₹12,543.20 | 36.04 ₹5,650.71 | 118 ₹18,501.22 |
| 1.04 | Carriage of stone by mechanical transport for an average Lead up to 25km approx. | 1,036 | cum | 290 ₹3.0 L | 220 ₹2.3 L | 250 ₹2.6 L | 150 ₹1.6 L | 250 ₹2.6 L |
| 1.05 | Carriage of Crate material from Leh to Choglamsar for an average of 25km | 13.5 | MT | 1,000 ₹13,500 | 350 ₹4,725 | 500 ₹6,750 | 150 ₹2,025 | 300 ₹4,050 |
| 1.06 | Cost of crate wire bunds. 16'x16'(4''x4) mesh of 4mm dia. | 8,362 | kgs | 90 ₹7.5 L | 110 ₹9.2 L | 97 ₹8.1 L | 122 ₹10.2 L | 125 ₹10.5 L |
| 2.00Construction of 143nos of crate bunds at Agling of Leh Forest Range. | ||||||||
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas exceeding 30cm in depth, 1.5 Mt in width as well as 10sqmt on plan including getting out and disposal of excavated earth lead up to 50mt. And lift up to 1.5 Mt as directed by the in charge. | 189.19 | cum | 350 ₹66,216.50 | 125 ₹23,648.75 | 190 ₹35,946.10 | 100 ₹18,919 | 100 ₹18,919 |
| 2.02 | Construction of Vertical bunds with slopping face by boulder filling (dry hand packed tightly) including the cost of stone but excluding the cost of crate wires. | 1,036 | cum | 1,650 ₹17.1 L | 1,870 ₹19.4 L | 1,500 ₹15.5 L | 1,500 ₹15.5 L | 1,500 ₹15.5 L |
Tender Value
₹74.6 L
EMD Value
₹1.5 L
Closing Date
29 Oct 2025, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office Fort Road Leh
Construction of Crate wire, protection bunds at Indus River site at Choglamsar II and Agling of Leh Forest Range for the year 2025-26 CAMPA scheme 52 g of crate bund.
2025_FEE_17784_2
e-Tender No 23 of FDL 2025-26
Open Tender
Civil Works - Others
60 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Divisional Forest Officer, Leh
₹1.5 L
11 Dec 2025
21 Oct 2025
30 Oct 2025
21 Oct 2025
29 Oct 2025
21 Oct 2025
Amount
Construction of 143nos of crate bunds at Choglamsar II of Leh Forest Range.
Earth work in excavation by mechanical means (Hydraulic excavator) over areas exceeding 30cm in depth, 1.5 Mt in width as well as 10sqmt on plan including getting out and disposal of excavated earth lead up to 50mt. And lift up to 1.5 Mt as directed by the in charge.
Construction of Vertical bunds with slopping face by boulder filling (dry hand packed tightly) including the cost of stone but excluding the cost of crate wires.
Making knitted crate wire of approved mesh-size, including weaving, binding sides and portions and binding top after filling, exclluding cost of filling stones and weaving materials.
Carriage of stone by mechanical transport for an average Lead up to 25km approx.
Carriage of Crate material from Leh to Choglamsar for an average of 25km
Cost of crate wire bunds. 16'x16'(4''x4) mesh of 4mm dia.
Construction of 143nos of crate bunds at Agling of Leh Forest Range.
Earth work in excavation by mechanical means (Hydraulic excavator) over areas exceeding 30cm in depth, 1.5 Mt in width as well as 10sqmt on plan including getting out and disposal of excavated earth lead up to 50mt. And lift up to 1.5 Mt as directed by the in charge.
Construction of Vertical bunds with slopping face by boulder filling (dry hand packed tightly) including the cost of stone but excluding the cost of crate wires.
Making knitted crate wire of approved mesh-size, including weaving, binding sides and portions and binding top after filling, exclluding cost of filling stones and weaving materials.
Carriage of stone by mechanical transport for an average Lead up to 25km approx.
Carriage of Crate material from Leh to Agling for an average of 25km
Cost of crate wire bunds. 16'x16'(4''x4) mesh of 4mm dia.
M/S RIGZEN PALJOR GOVT CONTRACTOR (BID ID -173276)
M/S RIGZIN DAWA GOVT CONTRACTOR (BID ID -173170)
M/S SKALZANG DAWA (BID ID -173259)
M/S CHEMAT GYATSO (BID ID -173213)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_43150.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid