Tender Value
₹14.7 L
EMD Value
₹29,340
Closing Date
10 Aug 2026, 6:00 pmClosed
EE WR Division I Ajmer
EE WR Division I Ajmer
Repair and Renovation of Raja Harishchandra Tank Tehsil Kekri Distt. Ajmer
2026_WRDAS_581902_6
NIT 02/2026-27
Open Tender
Civil Works
Percentage
182 days
under jurisdiction of EE Ajmer I Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹29,340
Yes
14 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
10 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 7 | Sqm | 160 | ₹1,120 |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 52 | Sqm | 220 | ₹11,440 |
| 3 | Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour | 118 | Sqm | 23 | ₹2,714 |
| 4 | Dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. | 28.8 | Cum | 646 | ₹18,604.8 |
| 5 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. | 31.5 | Sqm | 20 | ₹630 |
| 6 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 8,099.5 | Sqm | 2.5 | ₹20,248.75 |
| 7 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 50 mm | 29.5 | Sqm | 320 | ₹9,440 |
| 8 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum | 254.9 | Cum | 98 | ₹24,980.2 |
| 9 | Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface | 24 | Cum | 1,165 | ₹27,960 |
| 10 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:6 | 111.51 | Cum | 3,819 | ₹4,25,856.69 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1033979.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].