| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1674 CrAccepted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹1674 Cr | 1 | Accepted-Finance H1 Bidder, Highest combined scorer as per QCBS evaluation |
| 2 | 2₹1579.5 Cr−₹94.5 Cr (5.65%)Accepted-Finance NCC HOUSE MADHAPUR HYDERABAD 500 081 | HYDERABAD | HYDERABAD | TELANGANA | 500081 | ₹1579.5 Cr−₹94.5 Cr (5.65%) | 2 | Accepted-Finance H2 Bidder |
| Sl No | Description | Qty | Unit | NCC Limited L1 | Larsen & Toubro L2 |
|---|---|---|---|---|---|
| 1.00Important Notes: - 1. The work shall be carried out and necessary clearances to be obtained, strictly in accordance with requirements and other notifications published by the Statutory authorities from time to time. 2. The quoted rates shall be inclusive of all Taxes, GST, Cess, Levy etc. 3. The payment schedule is attached in tender documents and will be paid on percentage basis of work order amount. 4. The agency has to arrange necessary electricity and water required for work at his own cost inclusing statutory clearance. (if any) 5. Agency shall follow standard guidelines including safety rules and security procedures of department that are in vogue and applicable during execution of work. 6. For detailed scope of work, please refer the tender document. | |||||
| 2.00 | Engineering, Procurement and Construction of Civil Infrastructure and Vacuum Infrastructure for establishing LIGO Observatory at Aundha, Hingoli District, Maharashtra-431705, India, on EPC Mode-I basis. | 1 | Job | 15,79,50,00,000 ₹15,79,50,00,000 Lowest | 16,74,00,00,000 ₹16,74,00,00,000 |
| 2.10For Civil Infrastructure:- Engineering, Procurement and Construction of Civil Infrastructure work including detailed designing, planning and obtaining all necessary statutory clearance from authority for Architectural, Structural, PHE, Electrical, Mechanical, HVAC & firefighting work alongwith drawings, construction of facility such as foundation, slab, walls, finishes, internal & external electrical work, public health engineering works, mechanical, HVAC & firefighting works, internal road, approach road & development works to use facility for the intended purpose etc. complete all as per enclosed preliminary Architectural drawings, scope of work, specifications and other provisions as detailed in the tender documents and as directed by Engineer-In-Charge. The details of built up area of buildings, height, facility etc. are provided in attached Annexure-I (Civil Infrastructure). Note :- Built-up areas mentioned in Annexure-I are based on the functional requirement of minimum clear internal plan dimensional. No extra payment/deduction shall be payable to EPC contractor for any increase/decrease in built-up areas due to structural member sizes or any other reason. | |||||
| 2.20For Vaccum Infrastructure:- Engineering Procurement and Construction of Vacuum Infrastructure work including detailed design, manufacturing drawings, fabrication, supply of bought out equipments along with vacuum control and monitoring system (VCMS), Installation, integration and commissioning at work site, demonstrating integrated operational performance of vacuum infrastructure in compliance with the specifications detailed in tender document and as instructed and directed by the Engineer-In-Charge. The brief details of vacuum infrastructure are provided in Annexure-II (Vacuum Infrastructure). | |||||
Tender Value
₹1600 Cr
EMD Value
₹16.1 Cr
Closing Date
4 Nov 2025, 5:00 pmClosed
Chief Engineer CCG
Office of CE (CCG), DCSEM, 3rd Floor, North Wing, Vikram Sarabhai Bhavan, Anushaktinagar, Mumbai - 400 094
Engineering, Procurement and Construction of Civil Infrastructure and Vacuum infrastructure for establishing LIGO India Observatory at Aundha, Hingoli District, Maharashtra-431705, India, on EPC Mode-I basis
2025_DCSEM_856708_1
DCSEM/CQD/QSA/LIGO-EPC/25- 26/NIT/02 dtd.15.04.2025
Open Tender
Construction Works
EPC Contract
1440 days
Aundha, Hingoli District
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹16.1 Cr
Mumbai
3 Feb 2026
16 Apr 2025
7 Nov 2025
16 Apr 2025
4 Nov 2025
18 Jun 2025
16 Apr 2025 - 2 Jun 2025
10 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Important Notes: - 1. The work shall be carried out and necessary clearances to be obtained, strictly in accordance with requirements and other notifications published by the Statutory authorities from time to time. 2. The quoted rates shall be inclusive of all Taxes, GST, Cess, Levy etc. 3. The payment schedule is attached in tender documents and will be paid on percentage basis of work order amount. 4. The agency has to arrange necessary electricity and water required for work at his own cost inclusing statutory clearance. (if any) 5. Agency shall follow standard guidelines including safety rules and security procedures of department that are in vogue and applicable during execution of work. 6. For detailed scope of work, please refer the tender document. | |||||
| 2Engineering, Procurement and Construction of Civil Infrastructure and Vacuum Infrastructure for establishing LIGO Observatory at Aundha, Hingoli District, Maharashtra-431705, India, on EPC Mode-I basis. | |||||
| 2.1 | For Civil Infrastructure:-
Engineering, Procurement and Construction of Civil Infrastructure work including detailed designing, planning and obtaining all necessary statutory clearance from authority for Architectural, Structural, PHE, Electrical, Mechanical, HVAC & firefighting work alongwith drawings, construction of facility such as foundation, slab, walls, finishes, internal & external electrical work, public health engineering works, mechanical, HVAC & firefighting works, internal road, approach road & development works to use facility for the intended purpose etc. complete all as per enclosed preliminary Architectural drawings, scope of work, specifications and other provisions as detailed in the tender documents and as directed by Engineer-In-Charge.
The details of built up area of buildings, height, facility etc. are provided in attached Annexure-I (Civil Infrastructure).
Note :- Built-up areas mentioned in Annexure-I are based on the functional requirement of minimum clear internal plan dimensional. No extra payment/deduction shall be payable to EPC contractor for any increase/decrease in built-up areas due to structural member sizes or any other reason. | - | - | - | - |
| 2.2 | For Vaccum Infrastructure:-
Engineering Procurement and Construction of Vacuum Infrastructure work including detailed design, manufacturing drawings, fabrication, supply of bought out equipments along with vacuum control and monitoring system (VCMS), Installation, integration and commissioning at work site, demonstrating integrated operational performance of vacuum infrastructure in compliance with the specifications detailed in tender document and as instructed and directed by the Engineer-In-Charge.
The brief details of vacuum infrastructure are provided in Annexure-II (Vacuum Infrastructure). | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TechnicalBidLIGO.pdf
Tender Documents • 19.62 MB
BOQ_900694.xls
BOQ • 0.43 MB
TechnicalDataSheet.xls
Tender Documents • 0.18 MB
CCC2025forEPCPROJECTS.pdf
Tender Documents • 2.70 MB
BOQ.xls
BOQ • 0.18 MB
BOQ_2.xls
BOQ • 0.43 MB
Tenderdocument.pdf
Tender Documents • 2.70 MB
Tenderdocument_2.pdf
Tender Documents • 19.62 MB
Corrigendum_X.pdf
PDF • 0.28 MB
Additional_Prebid_Clarification_v.pdf
PDF • 2.52 MB
Additional_Prebid_Clarification_iv.pdf
PDF • 0.62 MB
Corrigendum_IX.pdf
PDF • 0.31 MB
AdditionalPrebidClarification_iii.pdf
PDF • 0.69 MB
AdditionalPrebidClarification_ii.pdf
PDF • 3.34 MB
Additional_Prebid_Clarification.pdf
PDF • 0.81 MB
Corrigendum-VIII.pdf
PDF • 0.32 MB
Second_Prebid_Clarification.pdf
PDF • 24.02 MB
Corrigendum-VII.pdf
PDF • 0.35 MB
Corrigendum-VI.pdf
PDF • 0.39 MB
First_Prebid_Clarification.pdf
PDF • 11.46 MB
CORRIGENDUM_V.pdf
PDF • 0.33 MB
Corrigendum-IV.pdf
PDF • 0.44 MB
Corrigendum-III.pdf
PDF • 0.41 MB
Corrigendum-II.pdf
PDF • 0.33 MB
Corrigendum-I.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .