| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.4 Cr+₹8.7 L (6.83%)Rejected-Finance | ₹1.4 Cr+₹8.7 L (6.83%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | JOSEPH BENEDICT L1 | V.DEVA HARIN SAM L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the road from Pulippanam CP chanel Road (Via Kuttimavilai) in Cherukole Village Panchayat Km 0/0-0/950 R 67 (PUR) | |||||
| 2.00Clearing and removing Scrub jungle with Up rooting along the alignment for widening the road as ordered by the departmental officers and the ground shall be left in a perfectly clean condition all holes or hollows whether originally existing for produced by digging of roots shall be carefully filled up earth well rammed and leveled off and the entire work complete in all respects | |||||
| 3.00 | 0/0-0/950 | 684 | sq.m | 6.34 ₹4,336.56 Lowest | 8 ₹5,472 |
| 4.00Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B | |||||
| 5.00 | 0/0-0/950 | 141.48 | Cum | 139.96 ₹19,801.54 Lowest | 190 ₹26,881.2 |
| 6.00Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc. | |||||
| 7.00 | 0/0-0/950 | 890 | sq.m | 23.28 ₹20,719.2 Lowest | 28 ₹24,920 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | 0/0-0/950 | 294.75 | Cum | 2,422.07 ₹7,13,905.13 Lowest | 2,500 ₹7,36,875 |
| 10.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
23 Oct 2025, 3:00 pmClosed
Project Director
DRDA Collectorate Kanniyakumari District
Strengthening of 4 Road works in Package No 1 (R) in Thiruvattar Block under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2025-26 Phase-II
2025_RDTN_612546_1
A4/887/2025(1R) dated 30.09.2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Thiruvattar Block Area
As per Technical Bid
3 documents required · 3 mandatory
₹0
₹1.4 L
DRDA Collectorate Kanniyakumari District
31 Dec 2025
9 Oct 2025
23 Oct 2025
9 Oct 2025
23 Oct 2025
9 Oct 2025
9 Oct 2025
Amount
Strengthening the road from Pulippanam CP chanel Road (Via Kuttimavilai) in Cherukole Village Panchayat Km 0/0-0/950 R 67 (PUR)
Clearing and removing Scrub jungle with Up rooting along the alignment for widening the road as ordered by the departmental officers and the ground shall be left in a perfectly clean condition all holes or hollows whether originally existing for produced by digging of roots shall be carefully filled up earth well rammed and leveled off and the entire work complete in all respects
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50- 2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Sub Estimate for CC pavement
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of Granular sub base by providing well graded materials (25mm to 4.75mm IRC HBG metal @ 65%, 4.75 to 2.36mm IRC HBG metal @ 20% % 2.36mm below IRC HBG metal @ 15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% respectively)
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Strengthening the road from Kumarankudy Yela to Pottai Road in Kumarankudy Village Panchayat Km 0/0-1/350 R - 80 (PUR)
Clearing and removing Scrub jungle with Up rooting along the alignment for widening the road as ordered by the departmental officers and the ground shall be left in a perfectly clean condition all holes or hollows whether originally existing for produced by digging of roots shall be carefully filled up earth well rammed and leveled off and the entire work complete in all respects
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50- 2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Sub Estimate for CC pavement
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of Granular sub base by providing well graded materials (25mm to 4.75mm IRC HBG metal @ 65%, 4.75 to 2.36mm IRC HBG metal @ 20% % 2.36mm below IRC HBG metal @ 15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% respectively)
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Sub Estimate for Retaining wall
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Strengthening & Black topping the road from MP Road to kannankuzhi road in Pechiparai Village Panchayat Km 0/0-1/2 R - 92 (PUR)
Clearing and removing Scrub jungle with Up rooting along the alignment for widening the road as ordered by the departmental officers and the ground shall be left in a perfectly clean condition all holes or hollows whether originally existing for produced by digging of roots shall be carefully filled up earth well rammed and leveled off and the entire work complete in all respects
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50- 2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Sub Estimate for CC pavement
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of Granular sub base by providing well graded materials (25mm to 4.75mm IRC HBG metal @ 65%, 4.75 to 2.36mm IRC HBG metal @ 20% % 2.36mm below IRC HBG metal @ 15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% respectively)
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Strengthening the road from Chellamthiruthi well to Puthendam Road in Surulacode Village Panchayat Km 0/0-1/050 R - 247 (VPR)
Clearing and removing Scrub jungle with Up rooting along the alignment for widening the road as ordered by the departmental officers and the ground shall be left in a perfectly clean condition all holes or hollows whether originally existing for produced by digging of roots shall be carefully filled up earth well rammed and leveled off and the entire work complete in all respects
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50- 2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Sub Estimate for CC pavement
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of Granular sub base by providing well graded materials (25mm to 4.75mm IRC HBG metal @ 65%, 4.75 to 2.36mm IRC HBG metal @ 20% % 2.36mm below IRC HBG metal @ 15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% respectively)
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Sub Estimate for Retaining wall
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.DEVA HARIN SAM (BID ID -1493652)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
MGSMT_TechnicalBid_1R.pdf
Tender Documents • 0.58 MB
BOQ_731945.xls
BOQ • 0.35 MB
MGSMT_PriceBid_1R.pdf
Additional Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .