Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
₹1.5 L
EMD Value
₹3,055
Closing Date
21 Jan 2026, 12:00 pmClosed
EXECUTIVE OFFICER
OFFICE OF THE EXECUTIVE OFFICER LAVA PANCHAYAT SAMITI
FENCING AT BURMIAK PRIMARY SCHOOL PS15 HALPOO COMMUNITY HALL SANGSAY GP
2026_GTA_985766_1
LVA/eNIT No.40/APAS/2025-26
Open Tender
CIVIL WORKS
Percentage
SANGSAY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹3,055
24 Jul 2026
8 Jan 2026
23 Jan 2026
8 Jan 2026
21 Jan 2026
8 Jan 2026
Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth.
B.Cost of Boulder
Cement concrete with graded jhama khoa(30 mm size) excluding shuttering in ground floor and foundation 1:3:6 propotion
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1957 & IS: 1161- 1958 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete.The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For trusses spanning up to 12.00 m
Supplying fitting and fixing of iron and net made cage as directed by the department (Double knotted wove wire 1.20 mtr ht 17 bars)
Cost of PIB
18 % including GST
Labour Cess @ 1 % including GST
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.02 MB
BOQ_2406100.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .