Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹91.8 L+₹2.0 L (2.22%)Admitted-Finance MADHUBAN PO PARADIP DIST JAGATSINGHPUR 754 142 ODISHA | JAGATSINGHAPUR | ODISHA | 754142 | L2 | Admitted-Finance | |
| 3 | L3₹97.4 L+₹7.6 L (8.45%)Admitted-Finance JAGATSINGHPUR ODISHA 754142 | JAGATSINGHAPUR | ODISHA | 754142 | L3 | Admitted-Finance | |
| 4 | L4₹98.5 L+₹8.7 L (9.65%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹98.5 L+₹8.8 L (9.76%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUSANTA KUMAR SWAIN L8 | M/s.SAI SHREYASI CONSTRUCTION L10 | Gyana Ranjan Mohanty L9 | M/S BHAIRAB CHARAN SWAIN L5 | BIKRAM KESHARI ROUTARAY L3 | MAA DAKHINAKALI ENTERPRISERS L7 | Ms Gangadhar Jena L13 | Kulamani Nayak L12 | J K CONSTRUCTION L14 | Aakar Engineers and Contractors L15 | SUBRAT KUMAR BEHURA L6 | Bidyadhar Swain L4 | M/S TRIBHUBAN DAS L2 | SARALA CONSTRUCTION L1 | PRAHALLAD CHANDRA SWAIN L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Filling of dredged spoil/ saline sand to the required level including transportation within a lead of 5 Km. by private trucks with polythene covering at the top to prevent spillage/ blowing of sand including loading at one end and unloading at other end, spreading in layers, leveling, watering, compacting by VRR in suitable layers with supply of all labour, materials, T&P, all taxes, royalties, Port entry fees, engagement, hire & running charges of all equipments, operation expenses, all POL, cost of water, testing charges, excluding GST etc. all complete as per direction of Engineer-in-charge.
N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity. | 14,080 | Each Cum | 260 ₹36,60,800 | 280 ₹39,42,400 | 220 ₹30,97,600 | 209 ₹29,42,720 | 210 ₹29,56,800 | 315 ₹44,35,200 | 290 ₹40,83,200 | 268 ₹37,73,440 | 400 ₹56,32,000 | 1,000 ₹1,40,80,000 | 280 ₹39,42,400 | 239 ₹33,65,120 | 195 ₹27,45,600 Lowest | 405 ₹57,02,400 | 315 ₹44,35,200 |
| 2.00 | Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks with all leads including loading at one end and unloading at the other, spreading quarry dust over the approved surface, compacting with VRR at minimum 8 to 10 Ton static load for both Dry & Wet rolling, all complete including testing charges as well as cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses, cost of water, fuel, lubricants, excluding GST etc. all complete as per direction of Engineer-in-Charge. | 1,200 | Each Cum | 1,600 ₹19,20,000 | 1,450 ₹17,40,000 | 1,300 ₹15,60,000 | 1,200 ₹14,40,000 | 1,150 ₹13,80,000 | 900 ₹10,80,000 | 1,000 ₹12,00,000 | 1,240 ₹14,88,000 | 920 ₹11,04,000 | 1,900 ₹22,80,000 | 1,075 ₹12,90,000 | 1,000 ₹12,00,000 | 1,100 ₹13,20,000 | 450 ₹5,40,000 Lowest | 925 ₹11,10,000 |
| 3.00 | Collecting, Conveying, Supplying and Spreading IRC Grade-I metal of approved quality over the prepared sub-base in suitable layers, filling the interstices with required quarry dust as per MoRTH specification, maintaining required slope and level, compacting by smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton static weight for both Dry and Wet rolling to the satisfaction of Engineer including supply of all materials, labour, T&P, transportation charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, port entry fees, all testing charges etc. all complete excluding GST as per direction of Engineer-in-Charge.
N.B.: The spreading layers should be maintained as per MORTH specification. | 1,200 | Each Cum | 2,050 ₹24,60,000 | 1,950 ₹23,40,000 | 2,400 ₹28,80,000 | 2,280 ₹27,36,000 | 2,100 ₹25,20,000 | 1,900 ₹22,80,000 | 2,487 ₹29,84,400 | 2,437 ₹29,24,400 | 2,320 ₹27,84,000 | 2,100 ₹25,20,000 | 1,950 ₹23,40,000 | 2,200 ₹26,40,000 | 2,080 ₹24,96,000 | 1,150 ₹13,80,000 Lowest | 2,273 ₹27,27,600 |
| 4.00 | Collecting, Conveying, Supplying and Spreading IRC Grade-II metal of approved quality and filling the interstices with required quarry dust as per MoRTH specification, laying over the compacted Grade-I surface to required slope, compacting by Vibratory Road Roller including supply of all materials, labour, T&P, transportation charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, Port entry fees, all testing charges etc. all complete excluding GST and as per direction of Engineer-in-Charge.
N.B.: The spreading layers should be maintained as per MORTH specification. | 1,200 | Each Cum | 1,800 ₹21,60,000 | 2,250 ₹27,00,000 | 2,400 ₹28,80,000 | 2,280 ₹27,36,000 | 2,400 ₹28,80,000 | 1,905 ₹22,86,000 | 2,600 ₹31,20,000 | 2,487 ₹29,84,400 | 2,410 ₹28,92,000 | 2,100 ₹25,20,000 | 2,050 ₹24,60,000 | 2,200 ₹26,40,000 | 2,180 ₹26,16,000 | 1,130 ₹13,56,000 Lowest | 2,345 ₹28,14,000 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
4 Jul 2024, 5:15 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE,HWD-I,PPA
Office of the Harbour Works Division No.I, Engineering Department, Paradip Port Authority, First Floor, Administrative Building, Tele -06722-222020 Mob-9938935675
Upgradation of existing Plot (siding Plot RRS-5) inside Harbour area of PPA.
2024_MoS_811474_1
CE/HWDI/ACCTS-01/24/195
Open Tender
Civil Works
Works
180 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD
₹3.0 L
Yes
23 Aug 2024
12 Jun 2024
5 Jul 2024
12 Jun 2024
4 Jul 2024
12 Jun 2024
Amount
Filling of dredged spoil/ saline sand to the required level including transportation within a lead of 5 Km. by private trucks with polythene covering at the top to prevent spillage/ blowing of sand including loading at one end and unloading at other end, spreading in layers, leveling, watering, compacting by VRR in suitable layers with supply of all labour, materials, T&P, all taxes, royalties, Port entry fees, engagement, hire & running charges of all equipments, operation expenses, all POL, cost of water, testing charges, excluding GST etc. all complete as per direction of Engineer-in-charge. N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.
Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks with all leads including loading at one end and unloading at the other, spreading quarry dust over the approved surface, compacting with VRR at minimum 8 to 10 Ton static load for both Dry & Wet rolling, all complete including testing charges as well as cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses, cost of water, fuel, lubricants, excluding GST etc. all complete as per direction of Engineer-in-Charge.
Collecting, Conveying, Supplying and Spreading IRC Grade-I metal of approved quality over the prepared sub-base in suitable layers, filling the interstices with required quarry dust as per MoRTH specification, maintaining required slope and level, compacting by smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton static weight for both Dry and Wet rolling to the satisfaction of Engineer including supply of all materials, labour, T&P, transportation charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, port entry fees, all testing charges etc. all complete excluding GST as per direction of Engineer-in-Charge. N.B.: The spreading layers should be maintained as per MORTH specification.
Collecting, Conveying, Supplying and Spreading IRC Grade-II metal of approved quality and filling the interstices with required quarry dust as per MoRTH specification, laying over the compacted Grade-I surface to required slope, compacting by Vibratory Road Roller including supply of all materials, labour, T&P, transportation charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, Port entry fees, all testing charges etc. all complete excluding GST and as per direction of Engineer-in-Charge. N.B.: The spreading layers should be maintained as per MORTH specification.
M/S TRIBHUBAN DAS
BIKRAM KESHARI ROUTARAY
Bidyadhar Swain
M/S BHAIRAB CHARAN SWAIN
SUBRAT KUMAR BEHURA
MAA DAKHINAKALI ENTERPRISERS
SUSANTA KUMAR SWAIN
Gyana Ranjan Mohanty
M/s.SAI SHREYASI CONSTRUCTION
PRAHALLAD CHANDRA SWAIN
Kulamani Nayak
Ms Gangadhar Jena
J K CONSTRUCTION
Aakar Engineers and Contractors
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_852780.xls
BOQ • 0.28 MB
RRS5Plot_TD.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .