| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-Finance | ₹1.5 Cr | 1 | Accepted-Finance L1 LOWEST BIDDER |
| 2 | 2₹1.9 Cr+₹42.2 L (27.9%)Rejected-Finance | ₹1.9 Cr+₹42.2 L (27.9%) | 2 | Rejected-Finance RATES ARE ON HIGHER SIDE |
| 3 | 3₹2.5 Cr+₹1.0 Cr (67.8%)Rejected-Finance | ₹2.5 Cr+₹1.0 Cr (67.8%) | 3 | Rejected-Finance RATES ARE ON HIGHER SIDE |
| 4 | Rejected-Technical | - | - | Rejected-Technical TENDER DOCUMENT NOT PROPER |
| 5 | Rejected-Technical GURGAON | GURUGRAM | HARYANA | 122001 | - | - | Rejected-Technical WORK EXPERIENCE AND TURN OVER NOT PROPER |
Tender Value
₹2 Cr
EMD Value
₹2 L
Closing Date
29 Dec 2020, 5:00 pmClosed
SE ETC UPPTCL AZAMGARH
220KV S/S COLONY HAFIZPUR AZAMGARH
Balance work of construction of 132kV Machhalishahar-Mungrabadshahpur S/C line of D/C tower along with supply of balance materials i.e. stubs, tower parts, fittings, hardwares, OPGW etc. and accessories under ETD, Jaunpur
2020_UPTCL_539145_1
53/AETC/2020-21
Open Tender
Electrical Works
Item Wise
270 days
Jaunpur
UTR SLIP OF EMD TENDER FEE PAN CARD GST CERTIFICATE WORK EXPERIENCE etc.
2 documents required · 2 mandatory
₹11,800
SE ETC UPPCL AZAMGARH
₹2 L
5 Jan 2021
18 Dec 2020
30 Dec 2020
18 Dec 2020
29 Dec 2020
18 Dec 2020
18 Dec 2020 - 29 Dec 2020
Amount
Part -I (Works) Final checking of line with shortes details
Cost of Excavation of 132 KV tower foundation pits including all earth work, backfilling, levelling etc.
Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers. i- 132 KV DA
ii- 132 KV DB
iii- 132 KV DC/DE
Installation of steel reinforcement bar in RCC foundation including cost of steel reinforcement bar with cutting bending placing binding etc for following Towers/Gantry. i- 132 KV DA
ii- 132 KV DB
iii- 132 KV DC/DE
iv- Gantry
Cost of concreting for all types of tower foundation including cost of cement, dewatering, shorting & shuttering, forming, curing but excluding cost of reinforcement bars. i- 1:2:4 concreting
Erection of Superstructure of 132 KV Towers and their extensions required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger, number, phase plates, bird guard and fixing & punching for 132 KV DC line.
Tack welding of all the bolts up to the height of one section of the tower or 5 mtr from ground level whichever is higher with three tacks at 1200 seperation of minimum 10 mm. thickness with 10 mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of all material.
Laying, Stringing, Tensioning, Clamping, Jointing etc of ACSR Panther conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc. on all three phases of 132 KV SC lines.
Laying, Stringing, Tensioning, Clamping, Jointing including fitting of all necessary hardware and accessories of OPGW & OFAC, terruaination at S/s, end to end connectivity & testing etc on 132 KV.
Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
Installation of OPGW alongwith hardware & accessories. Insatallation, Laying, test & commissioning of links etc of 24 fibre (DWSM) OPGW fibre Optic cable alongwith all necessary Hardware sets excluding Joint Box.
Splicing & Installation of Joint box (24 Fibre).
Installation, Termination, Testing & Commissioning of FODP 48F: Indoor Type rack mounted with FCPC coupling and pig tails (5mtrs each).
Installation, Termination, Testing & Commissioning of fibre optic Approach cable for 24 F OPGW alongwith all necessary Hardware sets.
Part -II (Materials Supply) Towers Stub for Tower Type (A+0)
Stub for Tower Type (C+0)
Tower accessories Number Plate
Danger Plate
Phase Plate in set of red, blue and yellow for Tension Towers
Bird Guard for Towers
Pipe Type earthing materials for Towers
Insulators 70 KN Disc Insulator
Hardware Suitable for ACSR Panther Conductor Single Suspension fittings
Single Tension fittings
Conductor Accessories Suitable for ACSR Panther Vibration Dampers
Mid Span Compression Joint
Repair sleeves
Performed Armour Rod
OPGW (21550 Mtrs.) 24 Fibre (DWSM) OPGW fibre optic cable
Supply & installation of Hardware set for 24 fibres OPGW
joint box (24 Fibre)
FODP 48 F Indoor Type, rack mounted.
Fibre optic approach cable for 24 F OPGW
Supply & Installation of Hardware set for 24 Fibre (DWSM G652D) Fibre Approach cable
Rama Power construction
shiv shankar enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .