| 1 | L1₹6.7 CrAdmitted-Finance | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.6 CrAdmitted-Finance 15A 17 KRYSTAL HOUSE DUNCAN CAUSEWAY ROAD SION MUMBAI MAHARASHTRA 400022 | MUMBAI | MAHARASHTRA | 400022 | ₹9.6 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical DOCUMENTS ARE NOT OK |
| Sl No | Description | Qty | Unit | krystal integrated services ltd L2 | S Cube Infrastructures L1 |
|---|---|---|---|---|---|
| 1.01 | Interception & Diversion of Nallahs with STP works Project of Chachoda-binaganj town under SBM 2.0
1. Designing, Providing and Construction, Hydraulic Testing, Commissioning and Giving Satisfactorily Trials of STPs -2 Nos. of capacity 0.5 MLD Each.
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer including survey, design, construction of 2.0 No. s of Interception and Diversion structure.
3. Construction of Collection Chamber - 1 Nos.
4. Construction of Compound Wall
5. Providing, Laying and Jointing of Underground Drainage Lines for Diversion & Trunk Main Network (500 mm Ø NP3 RCC Pipe, length - 40 M)
6. Construction of Collection Sump – 1 Nos.
7. Construction of Intermediate Sewage Pumping Stations – 1 No.
8. Provision of DI K7 Pipes of Dia-100 MM, Length-30 M for Inlet and Outlet of Sewer for STP
9. Provision of 2 Nos. Electric Substation & Laying HT Feeder (1.5 KM) Connection up to Sewerage Treatment Plant
10. Construction of Box Culvert – 3.0 M X 3.0 M
11. Construction of Compound Wall & Gate
12. Provision of Gravel Sand Filters – 4 Nos.
13. Provision of OCMS
14. Provision for Landscaping | 1 | LumpSum | 4,73,82,000 ₹4,73,82,000 Lowest | 4,82,94,380 ₹4,82,94,380 |
| 1.02 | Operation and Maintenance Cost For 1st Years | 1 | LumpSum | 11,93,400 ₹11,93,400 | 7,50,000 ₹7,50,000 Lowest |
| 1.03 | Operation and Maintenance Cost For 2nd Years | 1 | LumpSum | 12,65,004 ₹12,65,004 | 7,95,000 ₹7,95,000 Lowest |
| 1.04 | Operation and Maintenance Cost For 3rd Years | 1 | LumpSum | 13,40,904.24 ₹13,40,904.24 | 8,42,700 ₹8,42,700 Lowest |
| 1.05 | Operation and Maintenance Cost For 4th Years | 1 | LumpSum | 14,21,358.49 ₹14,21,358.49 | 8,93,262 ₹8,93,262 Lowest |
| 1.06 | Operation and Maintenance Cost For 5th Years | 1 | LumpSum | 15,06,640 ₹15,06,640 | 9,46,858 ₹9,46,858 Lowest |
| 1.07 | Operation and Maintenance Cost For 6th Years | 1 | LumpSum | 15,97,038.4 ₹15,97,038.4 | 10,03,670 ₹10,03,670 Lowest |
| 1.08 | Operation and Maintenance Cost For 7th Years | 1 | LumpSum | 16,92,860.71 ₹16,92,860.71 | 10,63,890 ₹10,63,890 Lowest |
| 1.09 | Operation and Maintenance Cost For 8th Years | 1 | LumpSum | 17,94,432.35 ₹17,94,432.35 | 11,27,724 ₹11,27,724 Lowest |
| 1.10 | Operation and Maintenance Cost For 9th Years | 1 | LumpSum | 19,02,098.29 ₹19,02,098.29 | 11,95,387 ₹11,95,387 Lowest |
Tender Value
₹5.1 Cr
EMD Value
₹2.6 L
Closing Date
17 Jul 2026, 5:30 pmClosed
CMO
Nagar Parishad Chachoda Binaganj
Interception and Diversion of Nallahs with STP works Project of Chachoda Binaganj town under SBM 2.0
2026_UAD_516039_1
1012-Etender Date 10/06/2026
Open Tender
Civil Works - Others
Item Rate
365 days
Nagar Parishad Chachoda Binaganj
As per Tender Document
3 documents required · 3 mandatory
₹20,000
₹2.6 L
27 Aug 2026
16 Jun 2026
20 Jul 2026
16 Jun 2026
17 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Interception & Diversion of Nallahs with STP works Project of Chachoda-binaganj town under SBM 2.0
1. Designing, Providing and Construction, Hydraulic Testing, Commissioning and Giving Satisfactorily Trials of STPs -2 Nos. of capacity 0.5 MLD Each.
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer including survey, design, construction of 2.0 No. s of Interception and Diversion structure.
3. Construction of Collection Chamber - 1 Nos.
4. Construction of Compound Wall
5. Providing, Laying and Jointing of Underground Drainage Lines for Diversion & Trunk Main Network (500 mm Ø NP3 RCC Pipe, length - 40 M)
6. Construction of Collection Sump – 1 Nos.
7. Construction of Intermediate Sewage Pumping Stations – 1 No.
8. Provision of DI K7 Pipes of Dia-100 MM, Length-30 M for Inlet and Outlet of Sewer for STP
9. Provision of 2 Nos. Electric Substation & Laying HT Feeder (1.5 KM) Connection up to Sewerage Treatment Plant
10. Construction of Box Culvert – 3.0 M X 3.0 M
11. Construction of Compound Wall & Gate
12. Provision of Gravel Sand Filters – 4 Nos.
13. Provision of OCMS
14. Provision for Landscaping | - | LumpSum | 5,13,77,000 | - |
| 1.02 | Operation and Maintenance Cost For 1st Years | - | LumpSum | 11,93,400 | - |
| 1.03 | Operation and Maintenance Cost For 2nd Years | - | LumpSum | - | - |
| 1.04 | Operation and Maintenance Cost For 3rd Years | - | LumpSum | - | - |
| 1.05 | Operation and Maintenance Cost For 4th Years | - | LumpSum | - | - |
| 1.06 | Operation and Maintenance Cost For 5th Years | - | LumpSum | - | - |
| 1.07 | Operation and Maintenance Cost For 6th Years | - | LumpSum | - | - |
| 1.08 | Operation and Maintenance Cost For 7th Years | - | LumpSum | - | - |
| 1.09 | Operation and Maintenance Cost For 8th Years | - | LumpSum | - | - |
| 1.1 | Operation and Maintenance Cost For 9th Years | - | LumpSum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
ChaChodaTDN.pdf
Tender Documents • 1.66 MB
BOQ_621483.xls
BOQ • 0.26 MB
AnnexureE.pdf
Additional Documents • 1.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].