| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC H NO 413 VILLAGE SULKHANI P O BUGANA 125121 | HISAR | HARYANA | 125121 | L1 | Accepted-AOC Reasonable, justified and found L1 | |
| 2 | L2₹2.0 L+₹2,950 (1.52%)Rejected-Finance | L2 | Rejected-Finance High | |
| 3 | L3₹2.0 L+₹3,700 (1.90%)Rejected-Finance | L3 | Rejected-Finance High |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
23 Aug 2024, 5:00 pmClosed
EXECUTIVE ENGINEER
O/O, EXECUTIVE ENGINEER, ETD, SULTANPUR
AS PER BOQ
2024_UPTCL_943112_1
E- Tender No- 07- ETDS- 2024-25
Open Tender
Electrical Works
Item Wise
365 days
132 KV SS UNDER ETD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
ETD, SULTANPUR
₹2,000
24 Aug 2024
3 Aug 2024
24 Aug 2024
16 Aug 2024
23 Aug 2024
16 Aug 2024
Amount
Replacement of various 132 KV and 33 KV equipments at various 132 K.V. Sub- Stations under Electy. Transmission Division, Sultanpur along with other associated works during the period of 1 year from the date of LOI or agreement which ever is earlier, with all due care of safety & precautions, with all cost of men, misc. consumables, T&Ps etc. required for satisfactory completion of the work as per technical specification & direction of the supervising engineer as detailed under :-
Replacement of defective/damaged 33 KV VCB by Dismantling of 33 KV damaged/defective VCB including shifting of dismantled VCB form switch yard to storage place / store room.
Modification of 33 KV VCB foundation as per site requirement/ as per manufacturing drawing or as per direction of supervising Engineer and shifting of earthing & both side jumper. (as per site requirement)
Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping/ closing, spring charging/ indication/ supervision circuit with proper ferruling and checking out of breaker operation from local / remote including earthing & connection of both side jumpers and works related to complete the erection work. All required T&P, skilled labours, crane / hydra etc. shall be arranged by the contractor at his own cost.
Replacement of 132 KV CT/CVT/PT with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost as detailed under :-
Dismantling of 132 KV CT/CVT/PT after opening of its both side jumpers, earthing & cable termination etc. including shifting of dismantled material from site to store.
Erection of new 132 KV CT/CVT/PT including shifting of new 132 KV CT/CVT/PT from store to site. The works also includes jumpering from both side, earthing and cable termination.
Replacement of 145 KV LA with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost as detailed under :-
Dismantling of 145 KV LA after opening of its jumpers, earthing including shifting of dismantled material from site to store.
Erection of new 145 KV LA including shifting of new LA from store to site. The works also includes jumpering from side, earthing and cable termination.
M/S SHUCHI ENTERPRISES
UNIQUE ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .