Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAdmitted-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹11.3 L | L1 | Admitted-Finance |
| 2 | L2₹11.6 LAdmitted-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹11.6 L | L2 | Admitted-Finance |
| 3 | L3₹11.7 LAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹11.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BABLU SINHA L3 | SABIR CONSTRUCTION L1 | NANDI ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Belt Conveyor shifting and extension of 9WL belt conveyor in RIV seam of Khottadih Colliery. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Dismantling of 245mtr structure and transportation from site to outside of face | 16.66 | MT | 10,500 ₹1.7 L | 10,112 ₹1.7 L | 10,350 ₹1.7 L |
| 1.02 | Taken out of belt and colling outside of face | 490 | Mtr | 200 ₹98,000 | 192 ₹94,080 | 197 ₹96,530 |
| 1.03 | Loading, Unloading, carrying and transportation 245mtr structure From outside face to site and placing piller by piller as per extension - 14 head x 1 shift x 7 times | 98 | Heads | 1,310.25 ₹1.3 L | 1,280.95 ₹1.3 L | 1,311 ₹1.3 L |
| 1.04 | Loading, Unloading, carrying and transportation 490 mtr belting From outside face to site and placing piller by piller as per extension - 14 head x 1 shift X 7 times | 98 | Heads | 1,310.25 ₹1.3 L | 1,280.95 ₹1.3 L | 1,311 ₹1.3 L |
| 1.05 | Fitting of 245 mtr structure and 490 mtr belting as per the extension piller by piller (14 head unskilledX1.5 shift X 7 times) | 126 | Heads | 1,310.25 ₹1.7 L | 1,280.95 ₹1.6 L | 1,311 ₹1.7 L |
| 1.06 | Fitting of 245 mtr structure and 490 mtr belting as per the extension piller by piller (2 head skilled X1.5 shift X7 times) | 21 | Heads | 1,415.63 ₹29,728.23 | 1,378.52 ₹28,948.92 | 1,411 ₹29,631 |
| 1.07 | tail end shifting | 7 | Times | 28,300 ₹2.0 L | 27,323 ₹1.9 L | 27,965 ₹2.0 L |
| 1.08 | tail end shortening | 7 | Times | 28,300 ₹2.0 L | 27,323 ₹1.9 L | 27,965 ₹2.0 L |
| 1.09 | Holding boltsfor tail end and hopper per shifting 9 holes | 63 | Holes | 350 ₹22,050 | 344 ₹21,672 | 352 ₹22,176 |
Tender Value
₹13.4 L
EMD Value
₹16,800
Closing Date
4 May 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Belt Conveyor shifting and extension of 9WL belt conveyor in RIV seam of Khottadih Colliery
2026_ECL_358723_1
GM-PND/EandM/26-27/16/2021 dated 22/04/2026
Open Tender
Electrical and Maintenance Works
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹16,800
19 May 2026
24 Apr 2026
5 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
24 Apr 2026 - 27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Belt Conveyor shifting and extension of 9WL belt conveyor in RIV seam of Khottadih Colliery. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Dismantling of 245mtr structure and transportation from site to outside of face | 16.66 | MT | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Taken out of belt and colling outside of face | 490 | Mtr | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Loading, Unloading, carrying and transportation 245mtr structure From outside face to site and placing piller by piller as per extension - 14 head x 1 shift x 7 times | 98 | Heads | - | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Loading, Unloading, carrying and transportation 490 mtr belting From outside face to site and placing piller by piller as per extension - 14 head x 1 shift X 7 times | 98 | Heads | - | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Fitting of 245 mtr structure and 490 mtr belting as per the extension piller by piller (14 head unskilledX1.5 shift X 7 times) | 126 | Heads | - | - | BI01010001010000000000000515BI0100001117 |
| 1.06 | Fitting of 245 mtr structure and 490 mtr belting as per the extension piller by piller (2 head skilled X1.5 shift X7 times) | 21 | Heads | - | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | tail end shifting | 7 | Times | - | - | BI01010001010000000000000515BI0100001119 |
| 1.08 | tail end shortening | 7 | Times | - | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | Holding boltsfor tail end and hopper per shifting 9 holes | 63 | Holes | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_371597.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid