Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
3 Jul 2020, 5:00 pmClosed
Deputy Director( Transport),Daman
Deputy Director, Department of Transport, RTO Office, Airport Road, Nani Daman-396210
Selection of System Integrator (SI) Development of Application Software, Supply, Installation and Commissioning of IT and Non-IT Infrastructure for Computerised Check posts for supply and installation of Weigh Bridges
2020_DAMAN_767_1
ADTR/DMN/9/IBCP/2019-20/589
Open Tender
Miscellaneous Works
180 days
Daman
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15 L
Yes
Conference Hall , Secretrait , Moti Daman .
22 Jul 2020
31 Mar 2020
3 Jul 2020
31 Mar 2020
3 Jul 2020
31 Mar 2020
11 Jun 2020
Amount
FORM A
Total cost of project w.r.t. installation, development , functioning, application,functioning of Go Live Data centere etc including 5 Year AMC of all check post in Daman ,Diu &DNH.
Total tax applicable
FORM B
Amount for sucessfully commisioning, operation and completion of GO Live Data Centre at Daman,Diu &DNH .
Total tax applicable
FORM B-I
Amount for sucessfully commisioning, operation and completion of GO Live Data Centre at Daman .
Total tax applicable
FORM B-II
Amount for sucessfully commisioning, operation and completion of GO Live Data Centre at Diu .
Total tax applicable
FORM B-III
Amount for sucessfully commisioning, operation and completion of GO Live Data Centre at DNH .
Total tax applicable
FORM C
Total cost for Development ,installation , application of software functioning of Go Live check post at Daman, Diu and DNH
Total tax applicable
FORM C-I
Total cost for Development ,installation , application of software functioning of Go Live of one check post at Daman
Total tax applicable
Total cost for Development ,installation , application of software functioning of Go Live of all check post at Daman
Total tax applicable
FORM C-II
Total cost for Development ,installation , application of software functioning of Go Live of one check post at Diu
Total tax applicable
Total cost for Development ,installation , application of software functioning of Go Live of all check post at Diu
Total tax applicable
FORM C-III
Total cost for Development ,installation , application of software functioning of Go Live of one check post at DNH
Total tax applicable
Total cost for Development ,installation , application of software functioning of Go Live of all check post at DNH
Total tax applicable
FORM D
Annual Man Power cost after project Go live project at Daman ,Diu and DNH.
Total tax applicable
FORM D-I
Annual Man Power cost after project Go live project at Daman .
Total tax applicable
FORM D-II
Annual Man Power cost after project Go live project at Diu .
Total tax applicable
FORM D-III
Annual Man Power cost after project Go live project at DNH.
Total tax applicable
FORM 1 SOFTWARE APPLICATION DEVELOPMENT (Form 1)
Development, Installation and Maintenance of Checkpost Application including 5 Year Waranty
System Software required to be installed on Central Servers
Helpdesk System as mentioned in this RFP for 5 Years
Technical Manpower required for 1 above.
Database Management System
Antivitrus
Backup Software
Reporting Software if any
Help desk Operator
Cloud Manager
Database Manager
FORM 2 (For RTO ( Daman, Diu and DNH) )
Cost of IT Infrastructure RTO including installation, configuration and 5 years warranty supports after Go-live
Cost of Non IT Hardware Equipment and Infrastructure required
Total charges for Technical Manpower resources for five years from the date of Go-live excluding PMU. Manpower wise break up.
Cost of connectivity for 5 years as proposed by bidder.
Total charges for Technical Manpower resources for PMU for 180 days. Manpower wise break up
Total charges for Technical Manpower resources for PMU for 90 days. Manpower wise break up
FORM 2.1.1 (BREAKUP FOR DIU AND DNH)
Fixed CCTV 3MP
LED TV 95"
All-in-One Desktop for Video Management
Laser MFD
28 Port Giga L3 Network Switch
UPS - 5 KVA
64 Ch. NVR
6 TB Surveillance HDD
CAT6 Cabeling(305 Meter)
24 U Rack for Equipment
Any other items not covered above
FORM 2.1.2 (BREAKUP DAMAN)
Fixed CCTV 3MP
LED TV 95”
All-in-One Desktop for Video Management
Laser MFD
28 Port Giga L3 Network Switch
UPS – 5 KVA
64 Ch. NVR
6 TB Surveillance HDD
CAT6 Cabeling(305 Meter)
Rack for Equipment (24 U )
SAN Storage – 30TB
SAN Swich
Server
Firewall
128 Ch. Video Management Software
Any other items not covered above
Technical support engineer ( Minimum 2 years of experiance in system support / Application support)
Operations Manager ( minimum 5 years of experiance )
FORM 2.4 (CONNECTIVITY)
Checkpost to RTO
CMC (at Daman) to RTO
Internet Bandwidth at all RTOs
One time cost for equipment, installation etc
FORM 2.3,2.5 & 2.6 (Please refer para 3.5.8 for different kind of Manpower requirement)
Technical Manpower at RTO
PMU – 180 days
PMU – 90 Days
Fixed CCTV 3MP
DOME Camera 5MP
All-in-One Desktop (Core i5)
Laser MFD
8 Port Giga Network Switch
8 POE Switch with 1 uplink
UPS 3 KVA
8 Ch. NVR
CAT6 Cabeling 305m
24 U Rack for Equipment
Confort AC ( 1.5 Tons ) With redundacy
Server ( As per required specification compatible to host applications)
OS, SQL, Office and other licenses
Siren
Boom Barrier
Traffic – Signal Light
Printer For B&W A3/A4 – Laser
RFID Reader
Pos for Epayment
Any other required hardware/ software
Static weighbridge with User fare display for customer ( Digital type ) with IP68 load cells, model approved as per legal metroloy department – India.
Controller for integration with system
FORM 3.5 (CONNECTIVITY)
Internet Bandwidth at all Checkpost including One Time Cost
One time cost for equipment, installation etc
VaaaN Infra Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid