Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L Quoted ₹3.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.9 LRejected-AOC | ₹3.9 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/S.KSM Engineering L1 | M/s. KSR Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for draining the oil from the gear box, cleaning the worm wheel worm shaft with neat cloth checking the blue matching, radial run out, backlash, arresting of oil leak if any. Dismantling the coolers, cleaning and refixing the above oil coolers. Removing the gear box bottom cover and inspection of vertical shaft lower thrust and radial bearing. Clearing the oil pump, inspection of Hi flex coupling cleaning, greasing, including transportation of materials from and to stores, cost of consumables and T&P's. | 6 | Nos | 46,500 ₹2.8 L | 47,000 ₹2.8 L |
| 2.00 | Charges for dismantling of lub oil cooler from Lub oil system, cleaning flushing the cooler oil pipe lines, water pipe lines, oil separator tank, checking of water line valves and nipple, replacement of wornout parts and reassembling the same conducting pressure test of cooler bundle for any tube puncture and plugging if necessary or changing the cooler bundle as per the instruction of site Engineer in charge. Checking of joy coupling L 110 of motor and pump alignment lub oil pump & motor after cleaning the bed portion and adding / removal of necessary shims of necessary conducting trial run after reassembling as per the direction of Engineers in charge including consumables welding electrode, etc., and T&P’s. | 6 | Mills | 17,800 ₹1.1 L | 18,000 ₹1.1 L |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
7 Jul 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SEMI Circle COH 2526 MPM Dn Unit I Mills 1A 1B 1C 1D 1E and 1F Checking the gear box internals overhauling of the LOP coolers flushing the lines and checking the alignment works during Capital Overhaul for the year 2025 26
2025_EB_577292_1
CE SE MI NCTPS I 85 25 26
Open Tender
Power/Energy Projects/Products
45 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,100
Yes
29 Apr 2026
3 Jul 2025
8 Jul 2025
3 Jul 2025
7 Jul 2025
3 Jul 2025
Amount
Charges for draining the oil from the gear box, cleaning the worm wheel worm shaft with neat cloth checking the blue matching, radial run out, backlash, arresting of oil leak if any. Dismantling the coolers, cleaning and refixing the above oil coolers. Removing the gear box bottom cover and inspection of vertical shaft lower thrust and radial bearing. Clearing the oil pump, inspection of Hi flex coupling cleaning, greasing, including transportation of materials from and to stores, cost of consumables and T&P's.
Charges for dismantling of lub oil cooler from Lub oil system, cleaning flushing the cooler oil pipe lines, water pipe lines, oil separator tank, checking of water line valves and nipple, replacement of wornout parts and reassembling the same conducting pressure test of cooler bundle for any tube puncture and plugging if necessary or changing the cooler bundle as per the instruction of site Engineer in charge. Checking of joy coupling L 110 of motor and pump alignment lub oil pump & motor after cleaning the bed portion and adding / removal of necessary shims of necessary conducting trial run after reassembling as per the direction of Engineers in charge including consumables welding electrode, etc., and T&P’s.
M/s. KSR Enterprises (BID ID -1392825)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_689895.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid