| 1 | L1₹12.4 CrAccepted-AOC BLDG NO 8 BEHIND BOMBAY STOCK EXCHANGE RAJABHADUR MANSION AMBALAL DOSHI MARG 2ND FLOOR VILLAGE TOWN FORT CITY MUMBAI | L1 | Accepted-AOC WORK ORDER DONE | |
| 2 | L2₹13.2 Cr+₹80.4 L (6.50%)Rejected-Finance ADINATH H SOCIETY I T I ROAD SATARA | SATARA | SATARA | MAHARASHTRA | L2 | Rejected-Finance L2 | |
| 3 | L3₹13.3 Cr+₹90.3 L (7.30%)Rejected-Finance 188 SHUKRAWAR PETH SHIVARANJAN SOCIETY PUNE | PUNE | PUNE | MAHARASHTRA | 411009 | L3 | Rejected-Finance L3 |
Tender Value
₹12.4 Cr
EMD Value
₹6.2 L
Closing Date
12 Sept 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Director Pune
Shivkirti Sadnika Ghorpadi Post, Pune
CONSERVATION AND SITE MANAGEMENT PLAN OF SHRI VARADVINAYAK TEMPLE, MAHAD, TAL. KHALAPUR, DIST. RAIGAD
2025_TCADM_1215769_1
2025-26-5
Open Tender
Civil Works - Others
Percentage
545 days
Vardvinayak temple, Mahad
For Empaneled Contractors
2 documents required · 2 mandatory
₹3,540
₹6.2 L
Shivkirti Sadnika, Gorpadi post, Pune
30 Dec 2025
4 Sept 2025
15 Sept 2025
5 Sept 2025
12 Sept 2025
5 Sept 2025
9 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing lights, tublelight, bulbs, fans, independent plug points, wiring including circuit mains of all types along with accessories etc. complete as per specification No.WG-DM / PW | - | Point | - | - |
| 2 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/ structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:-(1) The elevational area of the scaffolding shall be measured for payment purpose.(2) The payment will be made once only for execution of all items for such works. | 1 | Sq.m | - | - |
| 3 | G.I sheet (Patra) Partition As per Instruction erect the vertical poles at a distance of 8 to 10 feet & on that provide the horizontal poles & prepare the square, on that fix the GI sheet (patra) . Provide the opening in patra where required. Instructions:- 1) In this work Excavation in any type of road, soil, loose or hard rock should be done and after the work Excavated pits should be refill. 2) The rate of the above work is for 3 days and because of if any reason days exceed beyond 3 days Rate as per following will be given a) for 4th day to 30 th day - 3% of original rate | 1 | Sq.m | - | - |
| 4 | Removing the existing cement/ lime plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 m or spreading in the compound and cleaning the site etc. complete. | - | Sq.m | - | - |
| 5 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering including disposal of rubbish to the dumping ground within 50 metres lead. | 1 | Sq.m | - | - |
| 6 | Dismantling the R.C.C. Work 1: 2: 4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. | 1 | Cu.m | - | - |
| 7 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete.. | 1 | Cu.m | - | - |
| 8 | Removing iron pipe railing having wooden or R.C.C or C.C or iron posts and stacking the materials as directed etc. complete. | - | RM | - | - |
| 9 | Removing cement tiles or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all lead, lifts, etc. complete. | - | Sq.m | - | - |
| 10 | Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | - | Cu.m | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2100413.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .