SE OMC VIII 2x250MW PTPP Paichha Jhansi
office of SE OMC VIII 2x250MW PTPP Parichha Jhansi
Breakdown maintenance of pressure part of Boiler of unit no 5 and 6 of 250W PTPP
2020_RVUNL_459646_1
T-03/OMC-VIII/BMD-V/PTPP/2X250 MW/ 2020-21
Open Tender
Power/Energy Projects/Products
Lump-sum
365 days
2x250MW Parichha Theral Power Plant Parichha Jhans
as per tender specification
2 documents required · 2 mandatory
₹1,180
Dy CAO PTPP Parichha
₹18,000
21 May 2020
18 Apr 2020
19 May 2020
18 Apr 2020
16 May 2020
18 Apr 2020
18 Apr 2020 - 15 May 2020
Amount
Attending tube leakages in water wall tube in boiler furnacefrom down comer/ring header to 50 meter including burner zone, Economiser tubes, LTSH, SCW, Reheater tubes, Arch Tubes, Screan tubes, Water wall hanger tubes, SH Hanger tubes, Final Superheater, Exit SH Tubes, Extended Water wall tubes, Ceiling Super heater tubes including platen super heater up-to Ist ten HP weld joints(irrespective of number HP weld joints in one frequency )
Attending tube leakage of each HP weld joints beyond 10 numbers of HP weld joints Including joint of carbon steel/T-11/T-22/T-91/TPH-347 including all diameter
Attending the leakages of hand hole plates of different pressure part header by removing hand hole plates with hand hole cutting equipment, rewelding of the same after complete preparations and stress relieving of the same after welding if required
Removal of damaged clamps/binders/scallop bars/flexible connectors etc. and replacement /refitting of the same with new/repaired one in different zones of the pressure parts.
Fabrication of hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating to required temperature of Carbon steel
Fabrication of hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating to required temperature of Alloy steel
Stitch welding of fines of water/ steam cool wall for securing of respective positions of tubes
Rectification /Replacement of ash Protector found damaged /eroded /dislocated in different pressure part zones
Replacement of eroded/damaged shrouds of boiler tubes of Economizer, LTSH, SCW, Screen tubes and other tubes of Boiler .
Repairing/ Reconditioning/ Replacement of eroded/damaged cassette baffles of Economizer and LTSH, tubes.
Erection of scaffolding and plateform in Economizer hopper (above)
Erection of scaffolding and plate form in S-Panel & bottom ash hopper
Erection of scaffolding and plate form in Reheater inlet & outlet
Erection of scaffolding and plate form in Water wall screen tube/ final super heater/ super heater screen tube
Erection of scaffolding and plate form in Platen super heater tube zone
Build up of eroded portion of the tubes caused by ash/ steam erosion using suitable welding electrodes matching with parent metal composition. Depth of erosion up to 2.5 mm, length of erosion up to 250mm
Lifting and taking out the complete coils in pair of LTSH horizontal coils (upper or lower) after cutting clamps supports ,clits, stoppers and releasing from subsequent headers and coil and their restoration after placement of coil
Lifting and taking out the complete coils of Economizer (upper or lower ) after cutting clamps supports clits, stoppers and releasing from subsequent headers and coil & their restoration after Placement of coil
Rectification of Buck Stay/Putting buck stay pin on its position in second pass of Boiler /comer No.1,2,3&4
Replacement of eroded/damaged tubes/bends of pressure parts in different zones of Boiler-Carbon/ low alloy (T-11) and (T-22) joint
Replacement of eroded/damaged tubes/bends of pressure parts in different zones of Boiler - Stainless Steel joint
Internal water washing of 2nd pass of boiler
Cleaning of economizer hopper & APH Hoppers
Cleaning & disposal of Fly ash foreign material from Dog House/Cat House
SHAKSHI ENGINEERING CO.
U.S.Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .