Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | +4.90% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹7.2 L (4.85%)Admitted-Finance | +9.99% | ₹1.6 Cr+₹7.2 L (4.85%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical 21 A MALVIYA NAGAR AIR FORCE AREA JODHPUR RAJASTHAN 342001 | JODHPUR | RAJASTHAN | 342001 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
14 Aug 2026, 3:00 pmClosed
Commissioner
Municipal Council Sikar
CONSTRUCTION OF CC ROAD WORK FROM rameshwari marriage garden to rv studio (kanwarpura road )
2026_DLB_584940_4
ENIB26/2026-27/Urgent
Open Tender
Civil Works
Percentage
270 days
Municipal Council Sikar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Commissiner, MDRISL
₹2.8 L
Yes
16 Aug 2026
9 Aug 2026
14 Aug 2026
9 Aug 2026
14 Aug 2026
9 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF CC ROAD WORK FROM rameshwari marriage garden to rv studio (kanwarpura road ) | |||||
| 1.01 | Dismantling of existing structures like culverts, bridges, retaining
walls, CC road and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding
wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with all
lifts and lead of 50 metres as directed by Engineer | 1,642.5 | cum | 678 | ₹11,13,615 |
| 2.01 | Dismantling of flexible pavements and disposal of dismantled
materials up to a lead of 50 metres as directed by Engineer | 687.5 | cum | 310 | ₹2,13,125 |
| 3.01 | Earth work in excavation in foundation, trenches etc. including
dressing of sides and ramming of bottoms, including getting out the
excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable
site as per direction of Engineer for following depths, below natural
ground / Road top level. | 400 | cum | 229.5 | ₹91,800 |
| 4.01 | Carriage of Materials by mechanical transport including loading, unloading andstacking :: 2 km | 2,580 | cum | 174.63 | ₹4,50,545.4 |
| 5.01 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate
40 mm nominal size | 85 | CUM | 4,330 | ₹3,68,050 |
| 6.01 | Centring and shuttering with plywood or steel sheet upto two stories
( each story of height upto 3.5 metre from floor level) including
strutting, propping etc. and removal of form for | 1,350 | sqm | 367 | ₹4,95,450 |
| 7.01 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level | 202.5 | cum | 5,510 | ₹11,15,775 |
| 8.01 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded
20mm nominal size stone aggregate) finished with a floating coat of
neat cement including cement slurry, but excluding the cost of
nosing of steps etc. complete. including Providing /mixing of
synthetic fibers compulsorily complying with IS 16481:2022 of 06
mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.
125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ | 450 | sqm | 422.5 | ₹1,90,125 |
| 9.01 | Providing and Laying Reinforced cement concrete pipe NP4/
prestressed concrete pipe for culverts including jointing ends and
fixing collar with cement mortar 1:2 complete as per clause 1000 &
2900 of MoRT&H specification including all material, labour form
work, machinery | 20 | mtr | 1,202 | ₹24,040 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.40 MB
Tendernotice_2.pdf
PDF • 0.90 MB
Tbid.pdf
Tender Documents • 1.60 MB
BOQ_1039096.xls
BOQ • 0.34 MB
CorriTime.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .