Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAccepted-AOC | L1 | Accepted-AOC Lowest hence accepted | |
| 2 | L2₹31.6 L+₹1.6 L (5.27%)Rejected-AOC | L2 | Rejected-AOC Not lowest | |
| 3 | L3₹33.0 L+₹2.9 L (9.78%)Rejected-AOC | L3 | Rejected-AOC Not lowest | |
| 4 | L4₹35.0 L+₹5.0 L (16.7%)Rejected-AOC | L4 | Rejected-AOC Not lowest | |
| 5 | L5₹35.6 L+₹5.6 L (18.7%)Rejected-AOC | L5 | Rejected-AOC Not lowest |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
15 Apr 2020, 6:00 pmClosed
GE GOLCONDA
GE GOLCONDA LANGERHOUSE OPP MILITARY HOSPITAL HYDERABAD TELANGANA
COMPREHENSIVE MAINT AND OUTSOURCING OF WATER SUPPLY INSTALLATIONS MH MD AREA AND I S MKD AREA OS MKD AREA AT ARTY CENTRE AREA UNDER GE GOLCONDA
2020_MES_336293_1
CA No. GE/Gol/Token 39 of 2019-20
Open Tender
Civil Works
Item Rate
330 days
GE GOLCONDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE GOLCONDA
₹72,000
Yes
29 Jun 2020
25 Mar 2020
17 Apr 2020
25 Mar 2020
15 Apr 2020
7 Apr 2020
25 Mar 2020 - 4 Apr 2020
Amount
Outsourcing services for MES Pump house Signal centre Area comprising of 1 x 35 HP capacity of pump sets and MAP ACCN pump house with operation of 02x 15H P Centrifugal pumps and 01x 35KVA DG Set and pumping to the OH tanks/ UG Sumps including carrying out regular checks and services to the plants/equipments for up keeping of pump house and ensure serviceability of all the equipments including undertaking routine checks like replacement of gland packing in valves, checking of electrcial control panel, repalcement of gland rope for pumps, gaskets, "O" rings, nuts, bolts and washers eqpt/machinery, UG Sumps, overhead tanks of the following capacities of Pump sets of all the valves of range 50 mm dia to 250 mm dia at Main receiving Area, monitoring and taking of water from the Asif Nagar area filter bed & Bojagutta Reservior at signal centre pump house complete for a shift of 8 hours duration 3 shifts in a day including all Sundays and holidays with one FGM in each shift and all specified and directed by Engineer-in-Charge Note :- DHPP shall be issued under schedule 'B' free for filling only Note:- Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 No) (iii) IIIrd shift: 2200 hrs to 0600 hrs(FGM-01 No)
All as per item No.01 but for operation of 19 Rajput P/H and RSI PUMP HOUSE comprising of 02 x 12.5 HP Centrifugal pump Sets including monitoring and taking of water from the Asif Nagar area filter bed. Note :- DHPP shall be issued under schedule 'B' free for filling only Note:- Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 No) (iii) IIIrd shift: 2200 hrs to 0600 hrs(FGM-01 No) Note:- Note:- Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 No) (iii) IIIrd shift: 2200 hrs to 0600 hrs(FGM-01 No)
All as per item No.01 but for operation of O/S MKD area pump house comprising of 01x15 HP ,01 x 30 HP centrifugal pump sets and 100 KVA DG Set, 0.5 LG UG Sump and distribution of water to connected OHR's/UG sumps at 9 MT area including monitoring and taking of water from the HMWS S&B Bojjagutta reservoir and IBL pump house. Note :- DHPP shall be issued under schedule 'B' free for filling only Note:- Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 No) (iii) IIIrd shift: 2200 hrs to 0600 hrs(FGM-01 No) Note:- Note:- Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 No) (iii) IIIrd shift: 2200 hrs to 0600 hrs(FGM-01 No)
Out sourcing of services for operation of borewells including operation of starters at Arty center area,Asif nagar area and MH/MD area including operation of connected valves for distribution of water to connected OHR's/UG sumps and up keeping of the installations complete a shift of 08 hrs duration 01 shift in a day including all Sundays and holidays with one FGM in each shift all as specified and directed by Engr-in-Charge. Shift timing as per site requirement (FGM-01 per shift)
GENERAL NOTES FOR ITEM NO -01 TO 04 :- (i) The Electrician/FGM/Valve Man/Helper has to ensure proper satisfactory collection and distribution of water to all the users incl up keep the installation. (ii) Minor repairs such as gland rope, gland packing etc are deemed to be included in above scope of work. (iii) Proper chloronium level are to be maintained and entered in the register. (iv) Contractor should ensure to provide and maitain Attendance register, Log sheet and duty roasters properly and submit to Engr-in-Charge as required. (v) Shift timings will be decided by the Engineer-in- incharge. (vi) The contrctor has to supply uniform to their employees for wearing during working hours. (vii) The minimum qualification for the operator(s) employed by the contractor shall be diploma/ITI certificate holder in relevent trade or 12th pass with minimum 3years experience or 10th pass with 5years experience in the operation of electrical installations and equipements. (viii) The above mentioned job will be carried out as per the Indian labour Law and factory act 1948 only. (ix) Contractor should ensure to provide Qualified Supervisor to visit the installations on daily basis and inform defects/problems if any in writing to Engr-in-Charge.
GENERAL NOTES FOR ITEM NO -01 TO 04 (Contd..):- (x) The Contractor shall be provided Mobile phones to the Manpower on duty. (xi) If any individual is absent from duty, a penal recovery shall be recorved form the Contractor. (xii) The operator should not leave the installations till the next releaver does not take the charge of installaion. (xiii) The operator will be responsible for cleanliness and necessary upkeeping of installations, including grass cutting and cutting of small branches of surrounding area upto 5m fromthe installaions. (xiv) The operator should have necessary tool kits (i.e., digital multimeter, Clamp meter, screw driver set of each sizes, Line Tester, combination and cutting pliers, cutting knife, hand gloves, suitable for available voltages and test lamp with conductor and holder etc.) available with him every time. (xv) the operator should be free from the habbits of any addiction such as liquor, smoking and other drugs .(xvi) contractor should ensure to provide and maintain water supply meter reading in their respective areas and submit same to Engr-in-charge as required.
M/s Pal Construction
Sri Surya Enterprises
MOHAMMED MUMTAZ ENGINEERING WORKS
Sri Associates
Sri Lakshmi Enterprises
M/S Veerabhadra Constructions
M/s GM Constructions
Srinivasa Consructions
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .