Tender Value
₹24.1 L
EMD Value
₹49,000
Closing Date
5 Jun 2026, 11:00 amDue today
Executive Engineer
L.M.B.D.G.C., Mathura
CONSTRUCTION OF BRICK LINING BETWEEN KM 0.560 TO KM 0.700 OF PACHHERA CUT DRAIN IN DISTT- MATHURA
2026_UPIDC_1148768_2
02EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
30 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹49,000
30 May 2026
30 May 2026
5 Jun 2026
30 May 2026
5 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in internal clearance in Bed of Drain including lift upto 1.50 m and lead upto 30 m. The earth from clearance to be used in side embankment or to be disposed off on spoil bank or as directed by engineer in charge with compaction and dressing etc complete. | 770 | M3 | - | - |
| 2 | Earth work in internal clearance for slush & lehal in Bed of Drain including lift upto 1.50 m and lead upto 200 m. The slush & lehal from clearance to be disposed off by tractor trolley on govt/pvt land available nearest at site of work | 1,279.3 | M3 | - | - |
| 3 | Earth work in cutting in wet earthwork including lift upto 1.50 M & lead upto 200 M by mannual labour. The earth from clearance to be disposed off by tractor trolley on govt/pvt land available nearest at site of work | 111.5 | M3 | - | - |
| 4 | Earth work in filling and strengthening of bank of channel with manual compaction and proper dressing including lead upto 200 M and lift upto 30 M with all cost of labour, t&p etc complete | 420 | M3 | - | - |
| 5 | Cement concrete 1:3:6 incement course sand and stone ballast 20-40 mm mixing & laying in foundation including cost of all material, labour and T&P etc complete | 26.51 | M3 | - | - |
| 6 | Ist class (M-150) Brick work in 1:4 cement & course sand mortar including cost of all material, labour and T&P etc complete | 196.89 | M3 | - | - |
| 7 | Laying Brick on Edge Soling with 1:4 Cement Mortar in Bed including cost of all material, labour and T&P etc complete | 324.24 | M2 | - | - |
| 8 | 12.5 mm thick plaster in 1:4 cement mortar over brick messonary including cost of all material, labour and T&P etc complete | 336 | M2 | - | - |
| 9 | Laying Cement concrete 1:2:4 in cement course sand and stone ballast 10-20 mm including cost of all material, labour and T&P etc complete | 18.9 | M3 | - | - |
| 10 | S/F 0.40 M Long PVC Pipe 75 mm dia for weep hole @ 5.00 M interval on side pannels and 0.75 M height from bed including cost of all material, labour and T&P etc complete | 56 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Corrigendum.pdf
Additional Documents • 0.37 MB
BOQ_2164935.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid