Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
| 5 | Accepted-Technical BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | Accepted-Technical Responsive |
Tender Value
₹6.4 L
EMD Value
₹13,000
Closing Date
8 Apr 2026, 11:00 amClosed
Executive Engineer Chamba Division HPPWD., Chamba
Executive Engineer Chamba Division HPPWD., Chamba
Repair of Govt Girls Secondary School at Chamba ( SH Demolishing of Stone Masonry Wall and construction of new foot Bridge)
2026_PWD_133062_1
NO. WA-II-Cha/25-26- 61222-71 dated 28.03.2026
Open Tender
Civil Works
Percentage
30 days
Chamba
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹13,000
27 Jun 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceablematerial and disposal of unserviceable material within all lead and lift metres lead as per direction of Engineer-in-charge In cement mortar.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 2.01 | Excavation in hilly area in all heights and depths and in all kind of soil by manual means including saturated soil comprising of ordinary soil, soft rock, hard rock chiselling, wedging out of rock(where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines grades ,width, cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-Charge at site according to the MORD technical specification clause 302,1603.1 and 1603.2 and sorting out useful materials and stacking the same within all leads and lifts in acquired width of road and transportation of un-useful material for filling in road ways camber, embankments for grade improvements and disposal of all surplus material to approved dumping sites through all modes of transportation including head load or animal transport or mechanical means alongwith its leveling fine dressing and carriage of machineries ,materials, tools, equipments and safety measures and other incidentals necessary to complete as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate is including the octroi, royality, Malkana, toll tax, GST, or any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 3.01 | Excavation in foundation and trenches in all heights and depths and in all kinds of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rock, chiseling / wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines, grade, width, cutting and trimming of side slopes as shown in the drawing and if water is met within the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailing out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-in-charge and disposal of all surplus excavated soil in acquired width or at an approved dumping side including its stacking leveling dressing including all leads and lifts by head-load, mechanical transportation or by any other mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HPPWD specification. Any loss to the public and private property during the course of execution and disposal of unserviceable material shall be absolute responsibility of the contractor which shall have to be compensated by him in all cases.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 4.01 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:6:12 ( One cement is to six sand is to twelve graded crushed stone aggregate 40mm (forty millimeter) nominal size in or under water including pumping or bailing out water( surface and sub soil water), dewatering for all heights /depths and any quantum of water including removal of slush which may arise at the time of laying under water for all heights/ depths, including the cost of form work and curing for 14 ( fourteen) days complete in Retaining walls and Breast walls etcetera as per drawings and MORD technical specification section 802, 900 and 1200 and as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 5.01 | Providing and laying Mechanically mixed and vibrated cement concrete for plain cement concrete Grade M-10 (M-ten) nominal mix 1:3:6 (one cement is to three sand is to six graded crushed stone aggregate 40 millimetre (Forty millimetre ) nominal size on ground or under water and curing complete for 14 (fourteen) days , in open foundation for all type of structure etcetra including pumping or bailing out water (surface and sub soil water) dewatering for all depths and any quantum of water including removal of slush which may arise at the time of laying concrete complete for all heights / depths including the cost of form work complete as per drawings and M.O.R.D. technical specification section 800,900 and 1200 or as directed by the Engineer-in-Charge including carriage of material within all leads ,lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 6.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetra with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto all depth and in all heights from floor including carriage of material within all leads, lifts and other incidentals as per the direction of the engineer-in -charge.The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | - | Per Square metre | - | - |
| 7.01 | Providing and laying in position machine batched and machine mixed cement concrete work of grade M-25 (twenty five) design mix to obtain the compressive strenght of 25N/mm square ( twenty five newton per square millimetre ) for reinforced cement concrete work, in all work up to plinth level using minimum cement content not less than 360 KG/Cum (Three hundred sixty kilogram per cubic metre) or as per approved design mix to give a smooth surface mechanically mixed and vibrated including curing completed and pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability for reinforced concrete work including carriage of material within all lead ,lift and other incedental as per specification approved drawing design and as per direction of Engineer-in-charge.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government . | - | Per Cubic metre | - | - |
| 8.01 | Providing tor steel reinforcement of Tata / Sail/Shyam steel of thermo mechanically treated bars of grade Fe-500 D(Fe- five hundred )or more for Reinforced Cement Concrete work including straightening, cutting, bending, placing in position and binding all including carriage of material within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-in-charge. The rate is inclusive of octroi, royality, Malkhana, Toll tax, , GST and any other taxes imposed by the Government. | - | Per Kilogram | - | - |
| 9.01 | Structural steel work of Tata / Sail/Shyam steel riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications, drawing, design and as directed by the Engineer-in-charge. The rate is inclusive of octroi, royality, Malkhana, Toll tax, , GST and any other taxes imposed by the Government. | - | Per Kilogram | - | - |
| 10.01 | Finishing walls with apex weather proof exterior emulsion of of Asian paints/Nerolac paints of approved shade having VOC less than 50 gm/litre ( fifty gram per litre) and UV resistance as per IS 15489:2004,Alkali & fungal resistance, dirt resistance exterior paint of required shade with silicon additives. New work (Two or more coats applied @ 1.43 litre/ 10 sqm ( at the rate of one point four three litre per ten square metre) over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm ( at the rate of zero point nine zero litre per ten square metre) as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications, drawing, design and as directed by the Engineer-in-charge. The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | - | Per Square metre | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_196787.xls
BOQ • 0.33 MB
Biddocument.pdf
Tender Documents • 5.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .