Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-AOC M 36 HOUSING UNIT MATHAIYANKUTTAI PO METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹3.9 L Quoted ₹3.3 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.4 LRejected-AOC H 6 HOUSING UNIT MATHAIYANKUTTAI PO METTUR DAM 636406 | SALEM | TAMIL NADU | 636406 | ₹3.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MARSSAL ENTERPRISES L1 | R K ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for overhauling of gravimetric feeder after dismantling all the Idle rollers pulleys, bearings, checking of clean out conveyors and changing of bearings in the clean out conveyor shaft, chain link and changing of Belt and other worn out parts and reassembling the same in complete shape and oil filling in the gear box. This includes transportation of materials from and to stores | 6 | Nos | 30,290 ₹1.8 L | 31,000 ₹1.9 L |
| 2.00 | Charges for draining the feeder gear box oil, removing the feeder gear box from position, dismantling the gear box , cleaning the gear box, inspection of bearings, gears, assembling the gear box, oil refilling and fixing in position as per the direction of Engineer in-charge,. | 6 | Nos | 14,990 ₹89,940 | 15,300 ₹91,800 |
| 3.00 | Charges for cleaning the accumulated coal dust , fly ash and other waste materials and air washing of the bunker and its platforms, belt beams, lateral surface of the bunker, coal valve area, down spout assembly, feeder and feeder floor, hot air duct and its gate, and damper and platforms, cold air ducts and its gate, damper and platforms & structural areas etc.
. | 1 | Time | 2,310 ₹2,310 | 2,640 ₹2,640 |
| 4.00 | Charges for clearing the accumulated coal dust, fly ash and other waste materials and air washing of the feeder discharge chutes and its platforms, structural areas, coal pipes from mill to boiler, Centre feed pipe and its fittings, mill tops, mills, mill floor, below mill floor, gear box areas and ground floor, seal air system, cleaning the oil leakage in gear box area and ground floor etc | 1 | Time | 4,040 ₹4,040 | 4,300 ₹4,300 |
| 5.00 | Cost of bearings 6211 | 6 | Nos | 463 ₹2,778 | 480 ₹2,880 |
| 6.00 | Cost of bearings 6212 | 12 | Nos | 453 ₹5,436 | 490 ₹5,880 |
| 7.00 | Cost of bearings 30216 | 6 | Nos | 2,758 ₹16,548 | 3,100 ₹18,600 |
| 8.00 | Cost of bearings 30313 | 6 | Nos | 3,132 ₹18,792 | 3,400 ₹20,400 |
| 9.00 | Cost of cutting gas | 0.6 | set | 3,635 ₹2,181 | 3,800 ₹2,280 |
| 10.00 | Charges for consumables and T & Ps | 1 | LS | 4,430 ₹4,430 | 4,700 ₹4,700 |
Tender Value
Refer Docs
EMD Value
₹3,600
Closing Date
15 Oct 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
Mill Plant Unit II Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge chute platforms coal pipes mill floor and mill gearbox of mill 2A
2024_EB_490192_1
CE / MTPS-I / SE / M-I / MP /OT. 197/ 2024-25
Open Tender
Power/Energy Projects/Products
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,600
Yes
20 May 2026
1 Oct 2024
16 Oct 2024
1 Oct 2024
15 Oct 2024
1 Oct 2024
Amount
Charges for overhauling of gravimetric feeder after dismantling all the Idle rollers pulleys, bearings, checking of clean out conveyors and changing of bearings in the clean out conveyor shaft, chain link and changing of Belt and other worn out parts and reassembling the same in complete shape and oil filling in the gear box. This includes transportation of materials from and to stores
Charges for draining the feeder gear box oil, removing the feeder gear box from position, dismantling the gear box , cleaning the gear box, inspection of bearings, gears, assembling the gear box, oil refilling and fixing in position as per the direction of Engineer in-charge,.
Charges for cleaning the accumulated coal dust , fly ash and other waste materials and air washing of the bunker and its platforms, belt beams, lateral surface of the bunker, coal valve area, down spout assembly, feeder and feeder floor, hot air duct and its gate, and damper and platforms, cold air ducts and its gate, damper and platforms & structural areas etc. .
Charges for clearing the accumulated coal dust, fly ash and other waste materials and air washing of the feeder discharge chutes and its platforms, structural areas, coal pipes from mill to boiler, Centre feed pipe and its fittings, mill tops, mills, mill floor, below mill floor, gear box areas and ground floor, seal air system, cleaning the oil leakage in gear box area and ground floor etc
Cost of bearings 6211
Cost of bearings 6212
Cost of bearings 30216
Cost of bearings 30313
Cost of cutting gas
Charges for consumables and T & Ps
R K ENGINEERING CONTRACTOR (BID ID -1163575)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_582423.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid