| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | L1 | Accepted-AOC Accept | |
| 2 | L2₹19.8 L+₹3,274.48 (0.17%)Rejected-AOC 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M S ENGINEERS L1 | ABBI ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. departmental officers etc complete | 258 | M3 | 135 ₹34,830 Lowest | 138.86 ₹35,825.88 |
| 2.00 | Plain Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hardbroken granite stone jelly for foundationincluding dewatering if found necessary andlaid in layers of not more than 15 cm thickand compacted etc.,complete | 12 | M3 | 5,590 ₹67,080 Lowest | 5,591.05 ₹67,092.6 |
| 3.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 51 | QTL | 9,321.5 ₹4,75,396.5 Lowest | 9,322.3 ₹4,75,437.3 |
| 4.00 | Supplying and erecting centering for side and soffits including necessary supports and strutting upto 3.29m high for plane surfaces such as side slabs of RCC boxing and similar vertical RCC slabs, FACIA, Drop etc., in all floor with all cross bracing using mild steel sheets of size of 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25X25X3mm for boardinglaid over country wood joists of size 10cm x 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. S1].No.123B Part-II | 520 | M2 | 1,195 ₹6,21,400 Lowest | 1,196.85 ₹6,22,362 |
| 5.00 | Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Be… | 92 | M2 | 1,290 ₹1,18,680 Lowest | 1,291.64 ₹1,18,830.88 |
| 6.00 | 6.Reinforced Cement concrete 1:2:4 (one cement, two and four aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 52 | M3 | 6,993 ₹3,63,636 Lowest | 6,994.64 ₹3,63,721.28 |
| 7.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 20 | M3 | 9,373 ₹1,87,460 Lowest | 9,374.18 ₹1,87,483.6 |
| 8.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 232 | M3 | 166 ₹38,512 Lowest | 168.95 ₹39,196.4 |
| 9.00 | Supply and fixing of SFRC man hole cover 750x750mm square etc complete | 16 | E | 2,971 ₹47,536 Lowest | 2,973 ₹47,568 |
| 10.00 | Plastering with cement mortar 1:5 12mm thick etc complete | 78 | M2 | 292 ₹22,776 Lowest | 295.68 ₹23,063.04 |
Tender Value
₹23.6 L
EMD Value
₹23,600
Closing Date
24 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of storm water drain at Kandhasamy layout in ward no 49 Central Zone
2025_MAWS_583722_1
e40/2025
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As per Tender Document
4 documents required · 4 mandatory
₹0
₹23,600
5 Nov 2025
19 Jul 2025
25 Jul 2025
19 Jul 2025
24 Jul 2025
19 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .