| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L Quoted ₹15.7 L | L1 | Accepted-AOC L1 tenderer |
| 2 | L2₹19.1 LRejected-AOC NO 16 11 ANBAZHAGAN NAGAR MAIN ROAD MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹19.1 L | L2 | Rejected-AOC L2 tenderer |
| Sl No | Description | Qty | Unit | MOHAN AGENCIES L1 | SAHIRA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the existing high grade R.C Concrete floor from Unit -II CST area upto Compressor house wall area for dismantling the deteroited Compressor Cooling water inlet & outlet lines below the ground level by using compressor and jack hammer to the required size and depth as directed by the Engineer in charge including cost of labour, hire charges for compressor and other T&Ps, disposing the bebris way from the site with initial lead and lift, etc., (Length 13m x Height 0.6m x Breadth 0.8m) | 6.24 | cum | 19,599 ₹1.2 L | 20,500 ₹1.3 L |
| 2.00 | Charges for providing high grade R.C Concrete floor at the dismantled area from Unit -II CST area upto Compressor house wall area using RCC M20 Grade (1:1.5:3) using OP cement and 12 to 20 mm HBG metal including cost of all materials, lead, lift, labour charges, shuttering charges etc,. Complete and as directed by site Engineer incharge of the work. | 6.24 | cum | 9,899 ₹61,769.76 | 10,500 ₹65,520 |
| 3.00 | Charges for providing scaffolding arrangements of '5' meter height ( 42 meters - 9.5 meter height, 5meter - 13 meter height.Including cost of scaffolding materials & consumables. | 8 | No | 7,849 ₹62,792 | 9,500 ₹76,000 |
| 4.00 | Charges for dismantling of 200 NB damaged pipe lines from repair bay of unit -2 area to compressor wall house area by cutting & welding. Including cost of consumables and T & P's. | 282 | mtr | 559 ₹1.6 L | 700 ₹2.0 L |
| 5.00 | Transporting the new 200 NB Seamless pipe from store to site cutting the pipe to the required size edge preparation of the new pipe .Including cost of consumables and T & P's. | 1 | Nos | 15,999 ₹15,999 | 17,500 ₹17,500 |
| 6.00 | Charges for erection of New 200 NB Compressor Cooling water lines and bends from repair bay of unit -2 to compressor wall house area by posistioning,forming to required shape & tag welding. Including cost of consumables and T & P's. | 282 | mtr | 1,029 ₹2.9 L | 1,200 ₹3.4 L |
| 7.00 | Charges for welding in newly errected carbon steel 200NB seamless pipes and bends in Compressor Cooling water inlet and outlet pipe lines and bends from Unit -II repair bay area to compressor wall area This work involves the welding the complete surface .Including cost of consumables and T & P's. | 1,684 | joints | 289 ₹4.9 L | 350 ₹5.9 L |
| 8.00 | Charges for providing supports for 200NB Compressor Cooling water lines and bends from Unit -II repair bay area to compressor wall area including cutting, drilling, fixing clamps and fastners and welding if necessary (Required iron & steel materials supplied by TNPGCL). Including cost of consumables and T & P's. | 42 | Nos | 5,099 ₹2.1 L | 6,000 ₹2.5 L |
| 9.00 | Charges for painting the newly errected compressor cooling water lines from Unit -II repair bay area to compressor wall area by one coat of red oxide primer and two coats of enamel grey paint one over the other with proper intervals,including T & P and consumables. | 690 | Sqm | 229 ₹1.6 L | 350 ₹2.4 L |
Tender Value
Refer Docs
EMD Value
₹16,700
Closing Date
3 Jul 2025, 2:00 pmClosed
Chief Engineer NCTPS II
Chief Engineer NCTPS II CHENNAI 120
Replacement of deteriorated
2025_EB_574839_1
CE NCTPS II SE M II O M 42 25 26
Open Tender
Miscellaneous Works
30 days
SE M II NCTPS II
Refer Tender Specification
2 documents required · 2 mandatory
₹0
₹16,700
Yes
9 May 2026
27 Jun 2025
4 Jul 2025
27 Jun 2025
3 Jul 2025
27 Jun 2025
Amount
Charges for dismantling the existing high grade R.C Concrete floor from Unit -II CST area upto Compressor house wall area for dismantling the deteroited Compressor Cooling water inlet & outlet lines below the ground level by using compressor and jack hammer to the required size and depth as directed by the Engineer in charge including cost of labour, hire charges for compressor and other T&Ps, disposing the bebris way from the site with initial lead and lift, etc., (Length 13m x Height 0.6m x Breadth 0.8m)
Charges for providing high grade R.C Concrete floor at the dismantled area from Unit -II CST area upto Compressor house wall area using RCC M20 Grade (1:1.5:3) using OP cement and 12 to 20 mm HBG metal including cost of all materials, lead, lift, labour charges, shuttering charges etc,. Complete and as directed by site Engineer incharge of the work.
Charges for providing scaffolding arrangements of '5' meter height ( 42 meters - 9.5 meter height, 5meter - 13 meter height.Including cost of scaffolding materials & consumables.
Charges for dismantling of 200 NB damaged pipe lines from repair bay of unit -2 area to compressor wall house area by cutting & welding. Including cost of consumables and T & P's.
Transporting the new 200 NB Seamless pipe from store to site cutting the pipe to the required size edge preparation of the new pipe .Including cost of consumables and T & P's.
Charges for erection of New 200 NB Compressor Cooling water lines and bends from repair bay of unit -2 to compressor wall house area by posistioning,forming to required shape & tag welding. Including cost of consumables and T & P's.
Charges for welding in newly errected carbon steel 200NB seamless pipes and bends in Compressor Cooling water inlet and outlet pipe lines and bends from Unit -II repair bay area to compressor wall area This work involves the welding the complete surface .Including cost of consumables and T & P's.
Charges for providing supports for 200NB Compressor Cooling water lines and bends from Unit -II repair bay area to compressor wall area including cutting, drilling, fixing clamps and fastners and welding if necessary (Required iron & steel materials supplied by TNPGCL). Including cost of consumables and T & P's.
Charges for painting the newly errected compressor cooling water lines from Unit -II repair bay area to compressor wall area by one coat of red oxide primer and two coats of enamel grey paint one over the other with proper intervals,including T & P and consumables.
SAHIRA ENTERPRISES (BID ID -1389704)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_686828.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid