Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -0.10% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹148.01 (0.10%)Admitted-Finance | +0.00% | ₹1.5 L+₹148.01 (0.10%) | L2 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹2,960
Closing Date
11 Sept 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_323598_12
e-NIT No. 100 of REW Poonch 2026-27 Dated 05-09-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹2,960
21 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete Size of tile 600x600 mm | 53.48 | sqm | 1,395.1 | ₹74,609.95 |
| 2 | Providing and fixing white transluscent sheet for windows | 16.44 | sqm | 650 | ₹10,686 |
| 3 | Distempering walls with dry distemper two or more coats complete | 198 | sqm | 127.95 | ₹25,334.1 |
| 4 | Finishing with water proofing paint two or more coats | 85 | sqm | 98.75 | ₹8,393.75 |
| 5 | Finishing with multideluxe paint for steel work | 20 | sqm | 142.05 | ₹2,841 |
| 6 | Add provision for repair of steel shutters for doord windows including blacksmith , labour , new tower bolts , handles , complete job | 1 | job | 5,000 | ₹5,000 |
| 7 | Providing and fixing ceiling fan complete job | 3 | no | 3,000 | ₹9,000 |
| 8 | 12 mm cement sand plaster | 12 | sqm | 262.2 | ₹3,146.4 |
| 9 | Add provision for electrification | 1 | no | 8,000 | ₹8,000 |
| 10 | Add the Cost of CIB | 1 | no | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1089751.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .