| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹169.9 CrAccepted-AOC 401 501 HARSH ANAND YEOLEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹178.2 Cr+₹7.8 Cr (4.58%)Rejected-Finance 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | - | Rejected-Technical Disqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified |
Tender Value
₹162.6 Cr
EMD Value
₹81.3 L
Closing Date
19 May 2025, 5:30 pmClosed
Executive Engineer P W Dn Kolhapur
Near Head Post Office, Ramanmala Tarabai Park, Kolhapur
CONSTRUCTION OF INTERNATIONAL CONVENTION CENTER, KOLHAPUR , DIST- KOLHAPUR (Civil and Electrical)
2025_PWDRP_1168964_1
143 for 2024-25 (B2) (OPEN)
Open Tender
Civil Works
Item Rate
730 days
Works
Please refer Tender documents.
4 documents required · 4 mandatory
₹13,360
₹81.3 L
Chief Engineer, P W Region, Pune
1 Sept 2025
8 Apr 2025
21 May 2025
8 Apr 2025
19 May 2025
8 Apr 2025
25 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. | 41,855.14 | One Square Meter | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 21,259.36 | One Cubic Meter | - | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 4,381.62 | One Cubic Meter | - | - |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m) By Mechanical Means | 4,892.24 | One Cubic Meter | - | - |
| 5 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 1,376.58 | One Cubic Meter | - | - |
| 6 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means | 8,970.58 | One Cubic Meter | - | - |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 112.66 | One Cubic Meter | - | - |
| 8 | Excavation for foundation in Softrock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary backfilling with available earth/ murum, ramming, watering including shoring and strutting etc.complete. (Lift from 3 m To 4.5m.) By Mechanical Means | 4,859 | One Cubic Meter | - | - |
| 9 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from 3m to 4.5m). By Mechanical Means | 9,754.93 | One Cubic Meter | - | - |
| 10 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 m beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from 4.5m to 6m ). By Mechanical Means | 4,820.96 | One Cubic Meter | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ.xls
BOQ • 1.15 MB
Tenderdocument.pdf
Tender Documents • 12.90 MB
Tenderdocument.rar
Tender Documents • 26.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .