Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Accept |
| 2 | l2₹1.1 Cr+₹51,616.40 (0.49%)Rejected-AOC | ₹1.1 Cr+₹51,616.40 (0.49%) | l2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | D. TAMILRAJAN L1 | M/s PRS Construction L2 |
|---|---|---|---|---|---|
| 1.01 | Applying Tack Coat over existing Surface of BT using 2.00 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications. | 10,628 | M2 | 28.3 ₹2,85,745.1 Lowest | 29.5 ₹2,97,861.5 |
| 2.01 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5. | 532 | M3 | 10,588 ₹53,04,588 Lowest | 10,610 ₹53,15,610 |
| 3.01 | Providing and laying 40mm compacted thick Bituminous Concrete using 0.13 cum of 19.00-9.50mm mm IRC size HBG metal 0.17 cum of 9.50-2.36 mm IRC size HBG metal, 0.26cum of 2.36mm and blow with 45.27Kgs of VG30(60/70Bulk ) Bitumen and 5.03 Kgs Shreaded Plastic Waste for premixing per 10 sq.m including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 tonnes capacity conveying the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and compaction by vibratory roller to the required density etc., including labor for loading bitumen into bitumen tank and metal to feeder unit labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler tipper trucks, paver finisher,vibratory rollers etc., complete as per specification using CMP clause 507 of MORTH.Rev-5. | 319 | M3 | 11,142 ₹33,76,026 Lowest | 11,210 ₹33,96,630 |
| 4.01 | Provision for GST 18% | 1 | No | 16,13,944 ₹16,13,944 Lowest | 16,21,818 ₹16,21,818 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
23 Jan 2026, 3:00 pmClosed
The Executive Officer
Town Panchayat Office, Markayankottai, Theni Dist
TURIP 2025-26-Relaying of BT Road at Ellapatti vilaku to salakarayan kovil , Anai road south salai tippo road in Markayankottai Town panchayat.
2026_DTP_641829_1
22/2026
Open Tender
Civil Works - Roads
Works
90 days
Markayankottai Town Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.1 L
Town Panchayat Office, Markayankottai, Theni Dist
9 Feb 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
23 Jan 2026
15 Jan 2026
14 Jan 2026
Applying Tack Coat over existing Surface of BT using 2.00 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications.
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying 40mm compacted thick Bituminous Concrete using 0.13 cum of 19.00-9.50mm mm IRC size HBG metal 0.17 cum of 9.50-2.36 mm IRC size HBG metal, 0.26cum of 2.36mm and blow with 45.27Kgs of VG30(60/70Bulk ) Bitumen and 5.03 Kgs Shreaded Plastic Waste for premixing per 10 sq.m including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 tonnes capacity conveying the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and compaction by vibratory roller to the required density etc., including labor for loading bitumen into bitumen tank and metal to feeder unit labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler tipper trucks, paver finisher,vibratory rollers etc., complete as per specification using CMP clause 507 of MORTH.Rev-5.
Provision for GST 18%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.28 MB
BOQ_768732.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .