| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹80.8 LAdmitted-Finance | -5.11% | ₹80.8 L | L1 | Admitted-Finance |
| 2 | L2₹86.1 L+₹5.3 L (6.55%)Admitted-Finance | +1.11% | ₹86.1 L+₹5.3 L (6.55%) | L2 | Admitted-Finance |
| 3 | L3₹89.4 L+₹8.6 L (10.7%)Admitted-Finance | +5.00% | ₹89.4 L+₹8.6 L (10.7%) | L3 | Admitted-Finance |
| 4 | L3₹89.4 L+₹8.6 L (10.7%)Admitted-Finance | +5.00% | ₹89.4 L+₹8.6 L (10.7%) | L3 | Admitted-Finance |
| 5 | L4₹98.0 L+₹17.2 L (21.3%)Admitted-Finance | +15.11% | ₹98.0 L+₹17.2 L (21.3%) | L4 | Admitted-Finance |
Tender Value
₹85.2 L
EMD Value
₹1.7 L
Closing Date
24 Aug 2026, 6:00 pmClosed
SE PWD CIRCLE DIDWANA
SE PWD CIRCLE DIDWANA
Construction of BT Road From Nonpura Fanta to Hasanpura 0/0 to 3/0
2026_CEPWD_591357_4
NIT No 05 of 2026-27 SE PWD CIRCLE DIDWANA
Open Tender
Civil Works
Percentage
150 days
KUCHAMAN CITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE PWD DN KUCHAMAN CITY, MD RISL JAIPUR
₹1.7 L
Yes
3 Sept 2026
20 Aug 2026
25 Aug 2026
20 Aug 2026
24 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201 By Mechanical Means In area of light jungle | 1.15 | Hect | 9,600 | ₹11,040 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301 to 305_____do___________ with lead upto - 50mtr | 8,911.88 | Cum | 52 | ₹4,63,417.5 |
| 3 | Providing and laying granular sub-base material (From Natural Quarry) having P.I.not more than 6, including spreading in layers not exceeding 150 mm compacted thickness and consolidation by 8-10 tonne power roller to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured).as per MoRTH specifaction table 400-1,400-2: Grading (iii) | 2,665.63 | Cum | 380 | ₹10,12,937.5 |
| 4 | Providing, laying, spreading and compacting stone aggregate of specific size as per table 400-8 & 400-9 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of Crushable screening to fill-up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edegs, lighting, guarding, barricading and maintenance of diversion etc. [MoRTH specification : Clause 404] (by manual means) with all leads (compacted thickness as specified to be measured) Grading no.2 (63-45mm) crusher broken | 1,035.94 | Cum | 1,070 | ₹11,08,453.13 |
| 5 | Providing, laying, spreading and compacting stone aggregate of specific size as per table 400-8 & 400-9 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of Crushable screening to fill-up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edegs, lighting, guarding, barricading and maintenance of diversion etc. [MoRTH specification : Clause 404] (by manual means) with all leads (compacted thickness as specified to be measured) Grading no.3 (53-22.4 mm) crusher broken | 829.69 | Cum | 1,250 | ₹10,37,109.38 |
| 6 | Providing and applying primer coat over prepared surface or granular base with bitumen emulsion as per IS: 8887 & manufacturer’s specifications with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures including cleaning of road surface as per MoRTH specification CIause- 502,112 '7.0-10.0 kg /10 Sqm | 11,062.5 | Sqm | 29 | ₹3,20,812.5 |
| 7 | Providing and applying tack coat with bitumen emulsion on the prepared surface including cleaning as per IS : 8887 & manufacturer’s specifications @ 2 kg /10sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures as per MoRTH specification CI.503,112 'On surface treated with primer 2.50 to 3.0 kg /10sqm | 11,062.5 | Sqm | 12 | ₹1,32,750 |
| 8 | Providing and laying open graded premix carpet 20 mm thick (compacted) on prepared surface in a single course as wearing course, aggregates as per Table 500-23, heating bituminous binder @ 14.6 Kg/10 Sqm. and aggregates in Hot Mix Plant (including cost of antistripping compound, wherever required), transporting the mixed material with tipper and laying with paver finisher to the required level and grade, rolling with power roller 8 - 10 tonne but excluding cost of tack and seal coat with lead for mix of material 1 km. (MoRTH Specification : Clause 510,112) with all lead with bitumen grade 60/70 (VG-30) | 11,062.5 | Sqm | 104 | ₹11,50,500 |
| 9 | Add Extra for adding shreaded plastic waste as per guideline envissaged in IRC-SP: 98-2013 over item of Open Graded Premix Carpet @ 8% of the quantity of bitumen by weight including mixing of aggregale and plastic waste in Hot mix plant (the Bitumen content will be as per respective clause of MORTH Specification) | 11,062.5 | Sqm | 3.5 | ₹38,718.75 |
| 10 | Providing and applying premixed seal coat type "B" comprising of thin application of fine aggregate (0.06 Cum. per 10 Sqm) premix with 6.8 Kg. per 10 sqm bitumen binder (including cost of antistripping compound, wherever required) in mini hot mix plant 6-10 TPH and laying and rolling with power roller 8-10 tonne including all lead of mix material [MORTH Specification : Clause 511] with all lead | 11,062.5 | Sqm | 36.3 | ₹4,01,568.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1050046.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .