| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹8.6 L+₹5,210.34 (0.61%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹9.4 L+₹83,052.78 (9.72%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹9.4 L+₹83,375.83 (9.76%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
Tender Value
₹10.4 L
EMD Value
₹20,840
Closing Date
21 Sept 2026, 4:00 pmClosed
EE Mahore
Mahore
BOQ
2026_PWDJK_324547_3
Short e-NIT No. 36 of 2026-27 Dated 14/09/2026 fresh 2nd time
Open Tender
Civil Works
Percentage
180 days
Mahore
NIT
2 documents required · 2 mandatory
₹600
eepwd
₹20,840
29 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge | 29.06 | cum | 479.3 | ₹13,928.46 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 8.97 | cum | 5,202.9 | ₹46,670.01 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 18.23 | cum | 4,200 | ₹76,566 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 12.7 | cum | 7,571.55 | ₹96,158.69 |
| 5 | Extra for brick work in super structure above plinth level upto floor V level by manual means. | 12.7 | cum | 1,455.65 | ₹18,486.76 |
| 6 | Providing and laying cement concrete in kerbs, steps and the like at or near ground level including curing, excluding the cost of centring, shuttering, and finishin 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size) and all work upto plinth level. | 3.44 | cum | 6,591.25 | ₹22,673.9 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.62 | cum | 9,395.7 | ₹43,408.13 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.39 | Cum | 9,821.85 | ₹33,296.07 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. | 338.61 | Kg | 123.2 | ₹41,716.75 |
| 10 | Centring and shuttering including strutting,propping etc and removal of form work Foundations, footings, bases of columns etc. for mass concrete | 81.41 | sqm | 286.35 | ₹23,311.75 |
stage.html
html • 0.03 MB
finance_1095597.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_1095597.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .