Loading…
Loading…
Tender Value
₹63.6 L
EMD Value
₹1.3 L
Closing Date
10 Feb 2026, 2:45 pmClosed
25 KV Electrification work in connection with removal of OHE infringement in construction of 12 M FOB in BSBS Yard of BSB division, N. E. Railway.
ETender-GSU-TRD-L08-25-26~NER
ETender-GSU-TRD-L08-25-26
Open
Works - General
6 Months
Varanasi, Uttar Pradesh
₹0
₹1.3 L
10 Feb 2026
19 Jan 2026
27 Jan 2026
2-Non Schedule Items
Item Breakup - 1-SOR Items
SOR Item 8(b)(i)-Supply without insulator of Each material for termination of Single conductor of Over head equipment or terminating wire. VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
SOR Item 8(b)(i)- Erection with insulator of material Each for termination of Single conductor of Over head equipment or terminating wire.
SOR Item 9(dz)- Supply without insulator of anti- Each creep with cadmium copper catenary wire in polluted area.
SOR Item 9(dz)- Erection with insulator of anti- Each creep with cadmium copper catenary wire in polluted area.
SOR Item 11(a)(i)- Supply without insulator of cut- Each in (9-Tonne) Insulator.
SOR Item 11(a)(i)- Erection with insulator of cut-in Each (9Tonne) Insulator.
SOR Item 17(b)- Extra for special embedment of Each earth electrode.
SOR Item 31(a)- Transfer of equipment from one Each mast or support to another.(Supply)
SOR Item 31(a)-Transfer of equipment from one Each mast or support to another.(Erection)
SOR Item 31(f)-Splicing & extension of an anchored Each OHE
SOR Item 31(j)- Dismantling of a Post/ Pedestal Each Insulator.
SOR Item 36(a)- Unloading of all type steel MT structures.
SOR Item structures.
SOR Item No. 32- Extra on Erection rate for 8(b)(i) Each of work under power block.
SOR Item No. 32- Extra on Erection rate for 9(dz) of Each work under power block.
SOR Item No. 32- Extra on Erection rate for 11(a)(i) Each of work under power block.
SOR Item No. 32-Extra on Erection rate for 31(a) of Each work under power block.
SOR Item No. 32 - Extra on Erection rate for 31(f) Each of work under power block. Total 60022.00 Item- 2 Section -2 (Concrete) S No. Item Description of Item Unit Qty Rate Amount No
SOR Item 2(a)(ii)- Concrete for foundation and cum plinth in rock soil (Supply)
SOR Item 2(a)(ii)- Concrete for foundation and cum plinth in rock soil (Erection). Total 476000.00 Item- 3 Section -3 (Ferrous) S No. Item Description of Item Unit Qty Rate Amount No
SOR Item 3(b)(i)- Supply of fabricated and MT galvanised structures (O,N & R type portals) with all necessary components other than masts.
SOR Item 3(b)(i)- Erection of fabricated and MT galvanised structures (O,N & R type portals) with all necessary components other than masts.
SOR Item 3(b)(iii)- Supply of special fabricated and MT galvanised steel structures other than Portals & traction Masts not covered under items 3(b)(i) & 3(b)(ii).
SOR Item 3(b)(iii)-Erection of special fabricated MT and galvanised steel structures other than Portals & traction Masts not covered under items 3(b)(i) & 3(b)(ii). VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
SOR Item 3(c)-Supply only of fabricated steel other MT than masts.
SOR Item 3(e) (i)- Supply of a Guy Rod assembly.
SOR Item 3( e) (i)- Erection of a Guy Rod assembly. Each
SOR Item 3(i)- boards/Plates.
SOR Item 3(i)- boards/Plates.
SOR Item 4(a)(i)- Supply without Insulator of Single Each bracket assembly.
SOR Item 4(a)(i)- Erection with Insulator of Single Each bracket assembly.
SOR Item 4(a)(ii)- Extra on 4(a)(i) above for Each supporting two OHE's.(Supply)
SOR Item 4(a)(ii) - Extra on 4(a)(i) above for Each supporting two OHE's.(Erection)
SOR Item 16(a)(i)- Supply of a structure bond.
SOR Item 16(a)(i)- Erection of a structure bond.
SOR Item 16(b)-Supply of a longitudinal bond.
SOR Item 16(b)- Erection of a longitudinal bond.
SOR Item 16(c)- Supply of a transverse and special Each bond.
SOR Item 16(c)-Erection of a transverse and Each special bond.
SOR Item 17(a)-Supply of a single earth electrode. Each
SOR Item electrode.
SOR Item No. 32- Extra on Erection rate for 3(b)(i) MT of work under power block.
SOR Item No. 32- Extra on Erection rate for 3(b)(iii) MT of work under power block
SOR Item No. 32 - Extra on Erection rate for 3(e)(i) Each of work under power block.
SOR Item No. 32- Extra on Erection rate for 4(a)(i) Each of work under power block.
SOR Item No. 32 - Extra on Erection rate for 4(a)(ii) Each of work under power block.
SOR Item No. 33(b) - Extra on Erection rate for 3(b) MT (i) of manual steel work
SOR Item No. 33(b)- Extra on Erection rate for 3(b) MT (iii) of manual steel work. Total 1285090.50 Item- 4 Section -4 (Non- Ferrous) S No. Item Description of Item Unit Qty Rate Amount No
SOR Item 15(a)(i)- Supply of large copper jumpers. Each
SOR Item 15(a)(i)- Erection of large copper jumpers Each
SOR Item 15(a)(ii)- Supply of small copper jumpers. Each
SOR Item 15(a)(iv)-Supply of a copper jumper Each (5mm dia droper wire).
SOR Item 15(a)(iv)- Erection of a copper jumper Each (5mm dia droper wire).
SOR Item No. 32- Extra on Erection rate for 15(a)(i) Each of work under.
SOR Item No. 32 Extra on Erection rate for 15(a)(ii) Each of work under power block.
SOR Item No. 32-Extra on Erection rate for 15(a) Each (iv) of work under power block. Total 78784.00 VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY Item- 5 Section 5 (Insulators) S No. Item Description of Item Unit Qty Rate Amount No
SOR Item No-4(ax)(i)-Supply of Stay Arm Porcelain Each Insulator (CD-1050 mm).
SOR Item No-4(ax)(iv)-Supply of Bracket Arm Each Porcelain Insulators (CD-1050 mm).
SOR Item No-8(bx)(i) Supply of 9 Tonne Porcelain Each insulator (CD-1050 mm) for item 8(b)(i), (ii), (iii), (vi), (vii), (viii) & (ix).
SOR Item 9(ax)(i) -Supply of 9-Tonne Porcelain Set insulators (CD-1050 mm) for item 9(a)
SOR Item 11(ax)(i)- Supply of 9 Tonne Porcelain Set insulator (CD-1050 mm ) for item no 11 (a)(i)
SOR Item 28(x)- Supply of Post insulators for item Set 28. Total 91304.77
Item Breakup - 2-Non Schedule Items
NS-1-Cutting Mast/Portal.
NS-2-Dismantling of released cantilever.
NS-3-Dismantling of Anti-Creep Anchor/BWA
NS-4-Dismantling of small parts steel
NS-5-Dismantalling of Guy rod.
NS-6-Construction of traction SWR diagram as per Each approved sectioning diagram and ACTM guidelines. The diagram prepared in AUTOCAD and operation rules annexure shall be prepared in Microsoft Word and submitted for approval. After approval, supply 18 set of hard copy of drawing with colouring and operation rules annexure with cover and one tracing, one soft copy in CD shall be submitted. Work shall be done as per scope of work.
NS-7-Fabrication, & supply of traction SWR Numbers diagram boards of size approx 4"x3" or 6"x4" on suitable acrylic/FRP sheets framed in teak wood/metal frame as per approved SWR diagram with colouring as per code of section.
NS-8-Supply & erection of OHE sectioning diagram Numbers board of section.
NS-9-Supply of Retro-reflective type public caution Each board (2 Language- Hindi, English)size:700mmx400X2mm as per RDSO spec. No. ETI/OHE/33A (12/97) Rev-8 or latest and similar as per RDSO drgno.RE/33/P/7551.
NS-10-Supply of Retro-reflective type Caution Numbers 50.00 board 25 KV (OHE Nearby) size:400mmx270mm as per RDSO spec. No.ETI/OHE/33A (12/97) Rev-8 (latest) & similar to RDSO Drg. no.RE/33/436. .
NS-11-Supply of Retro-reflective type Staff caution Each board (2 Language- Hindi, English, ) size: 700mmx400X2mm as per RDSO spec. No. ETI/OHE/33A (12/97) Rev-8 or latest and similar to RDSO drg no.RE/33/P/7561.
NS-12-Provision of double contact wire under ROBs Numbers 10.00 at different locations complete with supply of catenary and contact wire endings. The prices shall cover cost of catenary & contact wire ending but exclusive of contact wire pieces which shall be supplied by Railway (Labour) VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
NS-13-Provision of double contact wire under ROBs Each at different locations complete with supply of catenary andcontact wire endings. The prices shall cover cost ofcatenary & contact wire ending but exclusive ofcontact wire pieces which shall be supplied by Railway (Material)
NS-14-Slewing of OHE and slew back of OHE for Each erection of ROB girder by Crane. Span
Extra on Erection rate for NS-1 work under power Numbers 12.00 block:
Extra on Erection rate for NS-2 work under power Each block.
Extra on Erection rate for NS-3 work under power Each block.
Extra on Erection rate for NS-5 work under power MT block.
Extra on Erection rate for NS-6work under power Each block.
Extra on Erection rate for NS-12 work under power Numbers 10.00 block.
Extra on Erection rate for NS-14 work under power Each block. Span Total 528409.58
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].