Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.1 LAccepted-AOC | ₹36.1 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L3₹36.6 L+₹50,835 (1.41%)Rejected-Finance | ₹36.6 L+₹50,835 (1.41%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
| 3 | L3₹41.0 L+₹5.0 L (13.7%)Rejected-Finance | ₹41.0 L+₹5.0 L (13.7%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
| 4 | L3₹41.5 L+₹5.4 L (15.1%)Rejected-Finance | ₹41.5 L+₹5.4 L (15.1%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
| 5 | L3₹42.2 L+₹6.1 L (16.9%)Rejected-Finance ODISHA OD | CUTTACK | ODISHA | 752120 | ₹42.2 L+₹6.1 L (16.9%) | L3 | Rejected-Finance Due to less quoted from the 1st lowest bidder |
Tender Value
₹50.8 L
EMD Value
₹50,835
Closing Date
6 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BHUBANESWAR
Anda to Mandarbasta_Road_BUSG, SDBC0.000 to 3.000
2026_CERWI_133105_1
Tender online 06/2026-27 of BBSR
Open Tender
Civil Works - Roads
Percentage
90 days
Khordha
4 documents required · 4 mandatory
₹10,000
₹50,835
Yes
21 Sept 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
25 Jun 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of grith upto 300mm removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means andstacking of serviceable materials to be used or auctioned upto a lead of 1000m incuding removal and disposal of top organic soil not exceeding 150mm in thickness as per direction of Engineer-in-charge. | 3,080 | Sqm | 8.62 | ₹26,549.6 |
| 2 | Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge. | 831.25 | Cum | 282.89 | ₹2,35,152.31 |
| 3 | Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision) | 431.2 | Cum | 1,915.63 | ₹8,26,019.66 |
| 4 | Providin, laying, spreading & compacting graded stone aggregate to to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision) | 336.88 | Cum | 2,607.69 | ₹8,78,478.61 |
| 5 | Providing and applying Primer coat with penetration grade of bitumen emulsion using bitumen pressure distributor including all cost, carriage, royality, taxes of materials etc. | 1,944.25 | Sqm | 41.58 | ₹80,841.92 |
| 6 | Providing & applying tack coat over the bituminous surface with bitumen boiler fitted with spray set using 0.20Kg / Sqm. area including clearing the surface etc. complete for finished item of work induding cost, conveyance, royalty, taxes, labour, T&P, all other matermls required for the work etc. complete as per direction of the Engineer-incharge. | 5,832.75 | Sqm | 13.46 | ₹78,508.82 |
| 7 | Providing & applying tack coat over the WMM surface with bitumen boiler fitted with spray set using 0.20Kg / Sqm. area including clearing the surface etc. complete for finished item of work induding cost, conveyance, royalty, taxes, labour, T&P, all other matermls required for the work etc. complete as per direction of the Engineer-incharge. | 1,944.25 | Sqm | 19.33 | ₹37,582.35 |
| 8 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) | 196.35 | Cum | 13,642.17 | ₹26,78,640.08 |
| 9 | Providing & laying good laterite moorum for filling road flanks including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. | 115.5 | Cum | 1,146.09 | ₹1,32,373.4 |
| 10 | Providing and filling approved sand well watered & rammed incuing all cost, carriage, royalty, all taxes & labour, etc comp. as per direction of ingineer in charge. | 7 | Cum | 1,115.69 | ₹7,809.83 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.77 MB
Tendernotice_1.pdf
PDF • 2.07 MB
BOQ_598053.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .