Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹67.9 LAccepted-AOC BYE PASS ROAD JEYPORE KORAPUT | KORAPUT | ODISHA | 763001 | 1 | Accepted-AOC Contract value is excluding GST | |
| 2 | Rejected-Technical 97 LABOUR TENEMENT PO CHARBATIA CUTTACK 754028 | CUTTACK | CUTTACK | ODISHA | 754028 | - | Rejected-Technical As per Head Office letter No. 9839/OCC/Works-461-M (WE) Dated 31.07.2023 |
Tender Value
Refer Docs
EMD Value
₹78,000
Closing Date
5 Jun 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager(Mech.),E and M, OCCl
office of General Manager(Mech.),E and M, OCCL Rasulgarh, Bhubaneswar.
Erection, Commissioning, Testing of 03(Three) sets of Spillway Radial Gates with hoisting arrangements, Hoist supporting structures for Radial Gates, Trunnion walkway, Latch for Radial Gates of Ghatakeswar Multipurpose Project
2023_OCCL_89173_1
E-Procurement Notice No.11/OCCL/2023-24 (on-line)
Open Tender
Mechanical Works
Item Rate
90 days
Chikiti, Berhampur
Please refer tender documents
3 documents required · 3 mandatory
₹11,800
₹78,000
Office of the General Manager (M), E and M,OCCL
26 Sept 2023
22 May 2023
6 Jun 2023
22 May 2023
5 Jun 2023
22 May 2023
22 May 2023 - 29 May 2023
30 May 2023
Amount
RADIAL GATES-10.00 Mtr. x 6.430 Mtr.
Erection of 1st stage & 2nd Stage Embedded Parts including erection of dummy where required for 03(Three) sets of Spillway Gates
Erection, Commissioning, Testing of 03(Three) sets of Spillway Gates
Erection, Commissioning, Testing of 03(Three) sets of Trunnion walkway
Erection, Commissioning, Testing of 03(Six) sets of 30 T rope drum hoist for 03(Three) sets of Spillway Gates
Erection, Commissioning, Testing of hoist supporting Structures for 03(Three) sets of 30 T rope drum hoist
Erection of latch arrangements for 03(Three) Nos. of Spillway
2nd stage concreting of embedded parts of 03(Three) sets of Spillway Gates including hoist supporting structures, trestles & walkway by M25 grade concrete using 20mm and down grade agregates.
Erection of 1 st stage Embedded Parts for 03(Three) sets of Stoplog
Erection of working platform for erection 03(Three) sets of Radial Gates
Dismantling of working platform erected for 03(Three) sets of Radial Gates
Painting of 03(Three) sets of Spillway Gates after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 03(Three) sets of 30 T rope drum Hoists for 03(Three) sets of Spillway Gates after blast cleaning process performed with as per requirements & class 'B' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint confirming to IS 2932 : 1974 to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of Hoist supporting structure & Trestles for 03(Three) sets of 30T rope drum Hoists for 03(Three) sets of Spilway after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 03(three) sets of Trunnion walkway after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 03(Three) sets of latch arrangements for 03(Three) Nos. of bay after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
stage.html
html • 0.04 MB
techsummary_438588.pdf
PDF • 0.49 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_438588.pdf
PDF • 0.52 MB
09.pdf
PDF • 14.70 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .